Quote:
Originally Posted by acottawa
To me there are two likely options. Either the studies conducted do not match Via’s claims (cost, speed, ridership, financial viability) and it isn’t feasible as currently conceived, or the compromises necessary to make it feasible, such as not using Gare Centrale or Union Station, or bypassing Peterborough, are politically unpalatable.
|
You forgot the most obvious option. They don't want to drive up the cost of the plan by informing those they are negotiating deals with to see how important this deal is comparted to other options. When negotiating a deal, you don't start the negotiation by telling the seller what the maximum price you are willing to pay is.
For example, to get between De Beaujeu and Vaudreuil-Dorion Quebec, VIA has 2 options:
- As they currently do, and cross the CPR Winchester Sub to CN's Kingston Sub and run parallel to it to Vaudreuil-Dorion
- run parallel to CPR's Winchester Sub to Vaudreuil-Dorion.
The studies likely estimate how much each option will cost. Giving that information to CN and CP will allow them to know how much to inflate their price to get the maximum amount of money from VIA.

Snipped from the Canadian Rail Atlas