  #141  
Old Posted Aug 13, 2020, 7:32 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,447
Quote:
Originally Posted by Metro-One View Post
Going to guess this is a temporary feature to accommodate construction.
I would hope so, since the designs shown on the newly developed and updated BC MoTH project site are showing a loop for that turn movement in the finished project.

Surely we can't be value-engineering THAT much!
Reply With Quote
     
     
  #142  
Old Posted Aug 16, 2020, 6:03 PM
bluefox's Avatar
bluefox bluefox is offline
Registered User
 
Join Date: Aug 2013
Posts: 426
I am pretty sure I've seen it in a couple different places this is just a temporary realignment so they can do work on the south side without interruption.
Reply With Quote
     
     
  #143  
Old Posted Aug 27, 2020, 11:30 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,768
Reply With Quote
     
     
  #144  
Old Posted Aug 28, 2020, 3:21 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,021
Kind of a silly question, but has there ever been a project where the temporary alignment worked better for traffic flow than the final alignment in Canada or anywhere?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #145  
Old Posted Dec 31, 2020, 7:25 AM
Bobert Bobert is offline
Registered User
 
Join Date: Feb 2016
Posts: 249
The temporary alignment for HWY17 at east of the connector is really bad imo. Very windy, and if i remember correctly no reflectors on the concrete barriers.
Reply With Quote
     
     
  #146  
Old Posted Feb 3, 2021, 8:10 PM
montyhallgoat montyhallgoat is offline
Registered User
 
Join Date: Sep 2017
Posts: 59
Quote:
Originally Posted by Bobert View Post
The temporary alignment for HWY17 at east of the connector is really bad imo. Very windy, and if i remember correctly no reflectors on the concrete barriers.
Not sure about barriers but, tons of plastic reflectors/cat eyes on road markings.

Also, Nordel Way south of Highway 91 Connector (to truck rest area) is going to close on Friday, Feb 5.
I guess they are going to start building the new Highway 91C alignment soon, though not sure if they need to preload the area around truck parking.


Last edited by montyhallgoat; Feb 3, 2021 at 8:14 PM. Reason: Add image
Reply With Quote
     
     
  #147  
Old Posted Mar 13, 2021, 5:53 AM
Bobert Bobert is offline
Registered User
 
Join Date: Feb 2016
Posts: 249
The protected T intersection is up for what I assume is the truck parking facility by the portmann bridge.

Also large MSE walls are up for the 91C/17 intersection. Construction is pretty deep now from what it looks like.
Reply With Quote
     
     
  #148  
Old Posted Mar 18, 2021, 12:54 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,021
Thanks for the updates, so they went with a protected T instead of a signalized intersection? If so that is better, but it still should have been an interchange.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #149  
Old Posted Mar 19, 2021, 1:25 AM
c041v c041v is offline
Registered User
 
Join Date: Feb 2010
Posts: 37
Quote:
Originally Posted by montyhallgoat View Post

I guess they are going to start building the new Highway 91C alignment soon, though not sure if they need to preload the area around truck parking.
Yes. Lots of preload across the old access, already underway on either side.
Reply With Quote
     
     
  #150  
Old Posted Mar 19, 2021, 5:57 AM
Bobert Bobert is offline
Registered User
 
Join Date: Feb 2016
Posts: 249
Quote:
Originally Posted by Metro-One View Post
Thanks for the updates, so they went with a protected T instead of a signalized intersection? If so that is better, but it still should have been an interchange.
Should have been more specific. Unfortunately, the signals are in as part of the protected.

We have Through lane and left turn signals east bound.
RYG stop/go signals on the west bound.

I guess the signals make sense since you cant expect a semi to reach enough speed to safely clear the west bound traffic.
Reply With Quote
     
     
  #151  
Old Posted Apr 18, 2021, 8:32 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
I’m seeing a lot of sand built up for the approaches to the overpasses at the 17 / 91 interchange... which will eventually settle and create more bumps and dips. Why is the ministry so hell bent on not using concrete structures
Reply With Quote
     
     
  #152  
Old Posted Apr 18, 2021, 9:14 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
The big foam blocks they used around Cape Horn Interchange seems to have held up help.
Reply With Quote
     
     
  #153  
Old Posted Apr 18, 2021, 9:49 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,110
Quote:
Originally Posted by libtard View Post
I’m seeing a lot of sand built up for the approaches to the overpasses at the 17 / 91 interchange... which will eventually settle and create more bumps and dips. Why is the ministry so hell bent on not using concrete structures
Geotechnically speaking weight in this project is the enemy.
Reply With Quote
     
     
  #154  
Old Posted Apr 18, 2021, 11:25 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
Quote:
Originally Posted by MIPS View Post
Geotechnically speaking weight in this project is the enemy.
Well yes that is the typical BC value engineering excuse that we’ve heard for decades. But with modern construction techniques nowadays, anything is possible. It would be similar to the approach just south at 72nd which has concrete piers for the approaches.
Reply With Quote
     
     
  #155  
Old Posted Apr 19, 2021, 2:15 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by libtard View Post
I’m seeing a lot of sand built up for the approaches to the overpasses at the 17 / 91 interchange... which will eventually settle and create more bumps and dips. Why is the ministry so hell bent on not using concrete structures
More expensive to construct --> takes longer to get the funding --> fewer road projects per decade --> more complaints about lack of infrastructure in this forum.
Reply With Quote
     
     
  #156  
Old Posted Apr 19, 2021, 5:05 PM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
Quote:
Originally Posted by aberdeen5698 View Post
More expensive to construct --> takes longer to get the funding --> fewer road projects per decade --> more complaints about lack of infrastructure in this forum.
Yet other jurisdictions don’t seem to let that stop them and do just fine
Reply With Quote
     
     
  #157  
Old Posted Apr 19, 2021, 7:19 PM
moosejaw moosejaw is offline
Registered User
 
Join Date: Apr 2012
Location: Miami
Posts: 483
Quote:
Originally Posted by libtard View Post
I’m seeing a lot of sand built up for the approaches to the overpasses at the 17 / 91 interchange... which will eventually settle and create more bumps and dips. Why is the ministry so hell bent on not using concrete structures
how else do you build up a ramp?
What do you think sits under the concrete?
They dont proffroll and compact the soils over there in BC?
Reply With Quote
     
     
  #158  
Old Posted Apr 19, 2021, 10:06 PM
Marshal Marshal is offline
perhaps . . .
 
Join Date: Dec 2015
Location: Vancouver
Posts: 1,493
Quote:
Originally Posted by moosejaw View Post
how else do you build up a ramp?
What do you think sits under the concrete?
They dont proffroll and compact the soils over there in BC?
I don't know about libtard's endless complaining, but technically he has a point. If you build a ramp on compacted bog, infill, sediment, no matter how you consolidate it, you run the risk of settlement problems.

"how else do you build up a ramp?" Well he told you: you can build a structure on columns (steel or concrete).

"What . . . sits under the concrete?" You are implying that the same rotten soil conditions would 'sit under the concrete. You are wrong, and that's libtard's point. The concrete columns would sit on pile foundations that would be driven well below the depth of bad soil, and if not to 'bedrock,' then deep enough to gain enough friction to support the loading. There would be no settlement of the structure.

DKaz' brought up the use of foam blocks to form the ramps. Since these have been used before locally, it would be interesting to know why not here.
Reply With Quote
     
     
  #159  
Old Posted Apr 19, 2021, 10:37 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by moosejaw View Post
how else do you build up a ramp?
What do you think sits under the concrete?
They dont proffroll and compact the soils over there in BC?
Marshy land especially adjacent to the bog. It doesn't matter how much you compact the soil when you're essentially building on mud at sea level.
Reply With Quote
     
     
  #160  
Old Posted Apr 20, 2021, 1:05 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,021
The use of infill instead of elevated concrete structures for highway ramps seems to be a common practice throughout Canada.

This is actually why the extensive use of viaducts in the Golden Ears Bridge / Way project actually shocked me at the time. But that project seems to be an exception and not the rule in Canada, especially anywhere outside of Ontario and Quebec.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:37 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.