Quote:
Originally Posted by milomilo
Why not just have additional customs facilities at those stations? They do this on the channel tunnel, there are two stations outside of London.
|
It is over 100 km (as the crow flies) from St Pancras International station to the Channel Tunnel entrance, where as it is less than 40 km from Pacific Central Station to the Peace Arch crossing.
Also, metro London has a population of over 14 million, where as the entire
Lower Mainland has a population of less than 3 million.
Quote:
Originally Posted by milomilo
If you're spending the money on HSR then the additional cost of customs can't be too significant, we have border controls on pretty insignificant roads on the border. Plus really the staffing shouldn't be much greater, since the load will be lessened at the central stations. And if it means more passengers, even better.
|
With HSR, you want to minimize the number of stops, to allow the train time to get up to speed and cover some distance at that speed. The faster the train, the larger the time penalty for additional stops.
The reality is it is proving a struggle to get the money to do the upgrades on the Canadian portion of the route to get up to conventional train speeds. Lets not put the cart before the horse here. Before talking about adding a second station in Greater Vancouver, lets focus on getting travel times competitive with driving and increase the number of daily departures.