Quote:
Originally Posted by s211
Wait, what? The CoV burns fossil fuels? Where are the protesters, or does the CoV somehow get a free pass?
— hypocrites. 
|
*Big sigh*
The district energy system (DES) was designed to use sanitary sewer heat recovery as the heat source for the system. I don't know the exact target percent of a year that sewer heat alone could provide the DES with its heat input, but they obviously endeavoured to find a reasonable trade-off of system capacity vs cost to maximize the days of the year when it could provide 100% of demand without it costing as much to operate as CERN.
The DES was designed and built with three natural gas boilers that would have the combined capacity to supply
all of the systems' heat needs during times when the sewer heat recovery system was down for maintenance, upgrades, or trouble-shooting if something went wrong (like appears to be the case right now based on preceding comments).
During normal operation, only one natural gas boiler is lit and for most of the day it is on whatever its equivalent of idle is. It kicks up a few notches to meet the predicable morning demand spike as everyone takes a shower, along with when there's a cold snap; that's the system working as designed.
The DES capacity (pipes and plant) were designed and sized to meet the initially planned service area, which included all of SEFC from the Cambie street bridge (excluding the Maynards Block building, interestingly) to Main, and the north side of 2nd Ave to the water and the south side of Terminal Ave at Main/Quebec. The efficiency of the system exceeded initial expectations and the future service area was expanded to include areas of the False Creek Flats. Furthermore, larger areas (Mount Pleasant industrial/commercial, new Saint Paul's Hospital, redevelopment of False Creek South, etc.) could be added in the future were a second (or more) DES plant(s) to be added in the future.
So, this is all by way of saying that if something has gone wrong with the DES and it has lately been getting way less heat from the sewers, then they'll figure out the issue and solve it. In the meantime, because of the design of the system, there won't be an interruption in heat supply because of the forethought to include NG boilers. Were there no DES, all the buildings would have NG boilers anyway for domestic hot water, and they would collectively burn a whole lot more gas and create a lot more pollution than three industrial-grade super high efficiency boilers supplying hot water in pipes with a foot of thermal insulation. District heating isn't some sort of hand wavy crunchy granola feel goodery. It works. It's not new. And like any complex mechanical system, sometimes there are issues that arise and need resolution.