Quote:
Originally Posted by Express691
Kinda funny as my friends and I joked last night that a new yard would be built off the spur at Coquitlam Station.
Anyways
I have ideas for up to 3 switch locations
1 and 2: To and then from the inbound tracks. Elevate the tracks to the mainline and then lower them from the next one. Each of the switches lead into sharp curves leading to ground level.
3: This one breaks off from the outbound tracks to the right and then dives under the existing guideway and across the BNSF tracks.
Case in point, it is possible to build it without constructing a new flyover (which would be more expensive I feel)
The current site looks relatively high from the existing guideway but I'm sure with proper elevation it'll work (or they'll have to build the new yard on some sort of raised ground).
A few more notes:
1) Another switch could be built in the existing pocket track area, perhaps to facilitate movement
2) I guess you wouldn't be sending trains NIS from Surrey to the Crane OMC (at least the trains finishing midmorning after AM rush or early evening).
3) This might (no, this *will*) set a precedent as to how new switches are built elsewhere on the network - specifically to and from the mainline. Last time this happened was when they built the Millennium Line. (Coquitlam Yard and Lougheed Station technically don't count). Who knows if in 30 years they need to build more Expo Line tracks or an extension down Kingsway
|
The site is actually lower than the existing guideway.
The main problem is the railyard adjacent (they aren't likely to fly over the middle of the railyard as there's no space for column footings).
Here's a snip from Googlemaps which actually allows you to track the road around the Crane Canada site.
https://www.google.com/maps/@49.236218,-...5NuaGJ1HeWu9hS6g8KTTw!2e0!7i16384!8i8192
You can see at the right side of the pic, where the guideway crosses the Brunette River, there's a "special structure" for the span.
That structure, together with the probable desire to avoid a stream crossing (and Federal permits) likely means the switch will be just west of the Brunette River (middle of the pic to the left of that special column, but there's a curve in the guideway there).
The Hive article says that the yard will primarily serve the Expo Line, which I take to mean that trains will more likely head towards Braid from the new yard.
So if there's one switch, it would be on the east side of the new yard, although an "in-line" configuration would be better, with switches on each side of the yard, allowing trains to exit in either direction without having to reverse on the mainline (that's the configuration of the Coquitlam OMC3 and the original Edmonds Yard).
The mainline in this area is not busy, so if they are trying to save money, one switch will do, but probably is not ideal, especially if they retain an Expo Line route starting from Production Way (or Lougheed), in which case they'd probably want to send trains to that terminus at the start of the day.
Note that there's also a special structure at the west end of the site where the guideway crosses the TransCanada Highway.
Here are pics in the middle and west end of the site.
https://www.google.com/maps/@49.236643,-...7vhBwpf6KJoaeRz_ZPiVg!2e0!7i16384!8i8192
https://www.google.com/maps/@49.236643,-...7vhBwpf6KJoaeRz_ZPiVg!2e0!7i16384!8i8192
But the ends of the railyard may still require some interesting guideway configurations.
The curve in the guideway near the Brunette River may favour a switch installation at the west end of the site instead of the east end.
https://www.google.com/maps/place/North+...4c8fa501!8m2!3d49.2567973!4d-122.8930715