This is sad...
You'd think someone could make use of the diesel DMUs.

Ottawa's original O-Train Bombardier vehicles heading for the scrap heap
https://ottawacitizen.com/news/local-new...2d6560b91/amp/?__twitter_impression=true
     
     
  #22342  
Old Posted Mar 7, 2021, 10:34 PM
cganuelas1995 cganuelas1995 is online now
Registered User
 
Join Date: Jan 2017
Posts: 1,679
Quote:
Originally Posted by officedweller View Post
This is sad...
You'd think someone could make use of the diesel DMUs.

Ottawa's original O-Train Bombardier vehicles heading for the scrap heap
https://ottawacitizen.com/news/local-new...2d6560b91/amp/?__twitter_impression=true
Like use one as a new demonstration for rail transit between Olympic Village station and Granville Island as Olympic Line 2.0?
     
     
  #22343  
Old Posted Mar 8, 2021, 7:56 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,597
The Buzzer Blog - TransLink tests technology to sanitize air on buses

Quote:
TransLink is testing a technology called photocatalytic oxidation (PCO) to sanitize the air and surfaces on board transit vehicles. The one-month pilot will begin March 6 on a 60-foot articulated bus and two double-decker buses.

The PCO process occurs in the HVAC system so customers will not be able to observe the process, but they may notice a subtle clean scent. The three buses will also have clear signage indicating that PCO is taking place.

PCO works by circulating low levels of hydrogen peroxide to kill pathogens like viruses. The technology, which has been tested for safe exposure levels, is already used in other sectors such as the hotel and restaurant industries.

...

This testing period will determine PCO’s ability to effectively sanitize surfaces on transit and will work with peer agencies to validate the technology’s ability to sanitize air. Following the testing period, TransLink will analyze the data and determine if the technology meets the criteria for wider implementation.

...
     
     
  #22344  
Old Posted Mar 8, 2021, 8:42 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,106
Quote:
Originally Posted by cganuelas1995 View Post
Like use one as a new demonstration for rail transit between Olympic Village station and Granville Island as Olympic Line 2.0?
Those were leased from Belgium, who actually owns and operates the vehicle on an actual transit service there.
     
     
  #22345  
Old Posted Mar 8, 2021, 8:54 PM
cganuelas1995 cganuelas1995 is online now
Registered User
 
Join Date: Jan 2017
Posts: 1,679
Quote:
Originally Posted by nname View Post
Those were leased from Belgium, who actually owns and operates the vehicle on an actual transit service there.
Those were electrical multiple units. AFAIK, the OHC on the Line was stolen after the demo was over.
     
     
  #22346  
Old Posted Mar 9, 2021, 12:05 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Yeah, or some stolen, so the rest taken down.
So a DMU might make sense as an interim measure (though not enviro-friendly?)
     
     
  #22347  
Old Posted Mar 10, 2021, 4:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
TransLink planning $300 million SkyTrain maintenance centre in Coquitlam

https://dailyhive.com/vancouver/translink-skytrain-coquitlam-omc-operations-maintenance-centre
     
     
  #22348  
Old Posted Mar 10, 2021, 5:04 PM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
I have a suggestion on where that could go:



edit: actually, it kind of sounds like the parcels to the south of the current car dealership there which is being redeveloped are owned by Marcon: https://www.tricitynews.com/real-estate-news/ten-towers-proposed-for-coquitlam-site-3096428
     
     
  #22349  
Old Posted Mar 10, 2021, 7:05 PM
superelevation superelevation is offline
Registered User
 
Join Date: Oct 2020
Posts: 50
Quote:
Originally Posted by officedweller View Post
Thanks.

From Kenneth Chan twitter.

Capstan Station diagram showing outline of a 3-car Canada Line train at the platform.


https://twitter.com/iamkennethchan
Quote:
Originally Posted by nname View Post
If my math is correct... the platform length seems to be 52.5m, and the train on the diagram is about 54m in length.
Having 3 car trains with cars of the same length seems sensible
     
     
  #22350  
Old Posted Mar 10, 2021, 9:49 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Quote:
Originally Posted by GeeCee View Post
I have a suggestion on where that could go:
If it does go there as an offshoot from the existing wye, Port Coquitlam would be wise to push for adding a station on the east end of the yard.
     
     
  #22351  
Old Posted Mar 12, 2021, 12:12 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Good call - this is the old Crane Canada site which was problematic to develop because of its isolation from the rest of Coquitlam
(New Westminster is to the south of the Brunette River).
It'll provide access to both M-Line and Expo-Line, though not direct.
They'll have to single track trains on that section to install a switch (or two) but it's a low frequency section anyways.

TransLink bought 27-acre site near Braid Station for new SkyTrain maintenance centre
https://dailyhive.com/vancouver/225-north-road-coquitlam-skytrain-omc-maintenance-centre-translink


https://dailyhive.com/vancouver/225-north-road-coquitlam-skytrain-omc-maintenance-centre-translink
     
     
  #22352  
Old Posted Mar 12, 2021, 4:58 AM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,178
Quote:
Originally Posted by officedweller View Post
Good call - this is the old Crane Canada site which was problematic to develop because of its isolation from the rest of Coquitlam
(New Westminster is to the south of the Brunette River).
It'll provide access to both M-Line and Expo-Line, though not direct.
They'll have to single track trains on that section to install a switch (or two) but it's a low frequency section anyways.
It does seem like a good location, and could (depending on the capabilities of the other centres) allow TransLink to redistribute repair work and car storage to be closer to the respective lines.
     
     
  #22353  
Old Posted Mar 12, 2021, 6:09 AM
Aroundtheworld Aroundtheworld is offline
Registered User
 
Join Date: Oct 2013
Posts: 623
Quote:
Originally Posted by officedweller View Post
Good call - this is the old Crane Canada site which was problematic to develop because of its isolation from the rest of Coquitlam
(New Westminster is to the south of the Brunette River).
It'll provide access to both M-Line and Expo-Line, though not direct.
They'll have to single track trains on that section to install a switch (or two) but it's a low frequency section anyways.

TransLink bought 27-acre site near Braid Station for new SkyTrain maintenance centre
https://dailyhive.com/vancouver/225-north-road-coquitlam-skytrain-omc-maintenance-centre-translink

https://dailyhive.com/vancouver/225-north-road-coquitlam-skytrain-omc-maintenance-centre-translink
This is honestly the best location they could have come up with as it really isn't good for anything else.
     
     
  #22354  
Old Posted Mar 12, 2021, 6:25 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Kinda funny as my friends and I joked last night that a new yard would be built off the spur at Coquitlam Station.

Anyways

I have ideas for up to 3 switch locations

1 and 2: To and then from the inbound tracks. Elevate the tracks to the mainline and then lower them from the next one. Each of the switches lead into sharp curves leading to ground level.
3: This one breaks off from the outbound tracks to the right and then dives under the existing guideway and across the BNSF tracks.

Case in point, it is possible to build it without constructing a new flyover (which would be more expensive I feel)

The current site looks relatively high from the existing guideway but I'm sure with proper elevation it'll work (or they'll have to build the new yard on some sort of raised ground).

A few more notes:
1) Another switch could be built in the existing pocket track area, perhaps to facilitate movement
2) I guess you wouldn't be sending trains NIS from Surrey to the Crane OMC (at least the trains finishing midmorning after AM rush or early evening).
3) This might (no, this *will*) set a precedent as to how new switches are built elsewhere on the network - specifically to and from the mainline. Last time this happened was when they built the Millennium Line. (Coquitlam Yard and Lougheed Station technically don't count). Who knows if in 30 years they need to build more Expo Line tracks or an extension down Kingsway

Last edited by Express691; Mar 12, 2021 at 6:40 AM.
     
     
  #22355  
Old Posted Mar 12, 2021, 7:45 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Quote:
Originally Posted by Express691 View Post
Kinda funny as my friends and I joked last night that a new yard would be built off the spur at Coquitlam Station.

Anyways

I have ideas for up to 3 switch locations

1 and 2: To and then from the inbound tracks. Elevate the tracks to the mainline and then lower them from the next one. Each of the switches lead into sharp curves leading to ground level.
3: This one breaks off from the outbound tracks to the right and then dives under the existing guideway and across the BNSF tracks.

Case in point, it is possible to build it without constructing a new flyover (which would be more expensive I feel)

The current site looks relatively high from the existing guideway but I'm sure with proper elevation it'll work (or they'll have to build the new yard on some sort of raised ground).

A few more notes:
1) Another switch could be built in the existing pocket track area, perhaps to facilitate movement
2) I guess you wouldn't be sending trains NIS from Surrey to the Crane OMC (at least the trains finishing midmorning after AM rush or early evening).
3) This might (no, this *will*) set a precedent as to how new switches are built elsewhere on the network - specifically to and from the mainline. Last time this happened was when they built the Millennium Line. (Coquitlam Yard and Lougheed Station technically don't count). Who knows if in 30 years they need to build more Expo Line tracks or an extension down Kingsway
The site is actually lower than the existing guideway.
The main problem is the railyard adjacent (they aren't likely to fly over the middle of the railyard as there's no space for column footings).
Here's a snip from Googlemaps which actually allows you to track the road around the Crane Canada site.


https://www.google.com/maps/@49.236218,-...5NuaGJ1HeWu9hS6g8KTTw!2e0!7i16384!8i8192

You can see at the right side of the pic, where the guideway crosses the Brunette River, there's a "special structure" for the span.
That structure, together with the probable desire to avoid a stream crossing (and Federal permits) likely means the switch will be just west of the Brunette River (middle of the pic to the left of that special column, but there's a curve in the guideway there).

The Hive article says that the yard will primarily serve the Expo Line, which I take to mean that trains will more likely head towards Braid from the new yard.
So if there's one switch, it would be on the east side of the new yard, although an "in-line" configuration would be better, with switches on each side of the yard, allowing trains to exit in either direction without having to reverse on the mainline (that's the configuration of the Coquitlam OMC3 and the original Edmonds Yard).
The mainline in this area is not busy, so if they are trying to save money, one switch will do, but probably is not ideal, especially if they retain an Expo Line route starting from Production Way (or Lougheed), in which case they'd probably want to send trains to that terminus at the start of the day.

Note that there's also a special structure at the west end of the site where the guideway crosses the TransCanada Highway.

Here are pics in the middle and west end of the site.


https://www.google.com/maps/@49.236643,-...7vhBwpf6KJoaeRz_ZPiVg!2e0!7i16384!8i8192


https://www.google.com/maps/@49.236643,-...7vhBwpf6KJoaeRz_ZPiVg!2e0!7i16384!8i8192

But the ends of the railyard may still require some interesting guideway configurations.
The curve in the guideway near the Brunette River may favour a switch installation at the west end of the site instead of the east end.


https://www.google.com/maps/place/North+...4c8fa501!8m2!3d49.2567973!4d-122.8930715

Last edited by officedweller; Mar 12, 2021 at 8:12 PM.
     
     
  #22356  
Old Posted Mar 12, 2021, 8:53 PM
Bdawe Bdawe is offline
Registered User
 
Join Date: Aug 2015
Location: The West End
Posts: 535
If I was translink, between this, and the eventually Surrey-Langley Yard, I would be putting consideration towards selling off the rather transit-accessible Edmonds Yard for development
     
     
  #22357  
Old Posted Mar 12, 2021, 9:33 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Bdawe View Post
If I was translink, between this, and the eventually Surrey-Langley Yard, I would be putting consideration towards selling off the rather transit-accessible Edmonds Yard for development
Hmm... wouldn't they need all of these yards to support the new trains being ordered for the extensions?
     
     
  #22358  
Old Posted Mar 12, 2021, 9:34 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,809
Quote:
Originally Posted by Bdawe View Post
If I was translink, between this, and the eventually Surrey-Langley Yard, I would be putting consideration towards selling off the rather transit-accessible Edmonds Yard for development
Yeah, that will never happen. They already have a built out OMC in a central location and it's not like they'll get that much for the land. The new Coquitlam OMC is going to cost $300 million to build out. And they just added a new $110 million dollar building to Edmonds.
     
     
  #22359  
Old Posted Mar 13, 2021, 12:10 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by Bdawe View Post
If I was translink, between this, and the eventually Surrey-Langley Yard, I would be putting consideration towards selling off the rather transit-accessible Edmonds Yard for development
it would be a mistake to sell the yard. it is super central to the system; plus that is where most of the cables would be terminating and i imagine it would be expensive to relocate them all.

if anything, TransLink could look into what was done for Manhattan's Hudson Yards; building over the West Side Yard. they may be able to do that for at least a portion of the site. and lease the air rights to the development into the foreseeable future.
     
     
  #22360  
Old Posted Mar 13, 2021, 12:46 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,809
Quote:
Originally Posted by VancouverOfTheFuture View Post
it would be a mistake to sell the yard. it is super central to the system; plus that is where most of the cables would be terminating and i imagine it would be expensive to relocate them all.

if anything, TransLink could look into what was done for Manhattan's Hudson Yards; building over the West Side Yard. they may be able to do that for at least a portion of the site. and lease the air rights to the development into the foreseeable future.
I doubt there is any reason someone would build over the yard. The only way the economics of Hudson Yards works is because it's in the middle of Manhattan.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:17 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.