Quote:
Originally Posted by WarrenC12
Give it time! Everything is built like crap today. Gotta remember it's the grunts on the ground that determine this stuff.
|
That's fair. But this is horrid management from top to bottom.
You don't just "build' things today.
You have;
- Architects - International - Design Concept
- Consulting Architect - Local code knowledge
- Interior Designers
- Consultants
a. Mech
b. Elec
c. Seismic
d. Code
e. Structural
- Project Managers
- Site Managers
- Sub-Trade Project Manager
- Sub-Trade Foreman
- Worker actually doing the work.
That means about 5-6 layers of management signed off and thought the work was done to an appropriate level.
That's literally a system failure. In fact, that's the definition of a system failing if this was signed off on along the way.
This should be trending with Westbanks name allover it and Ingels on the hashtag too.
No one should want to be associated with something like this.
It would be a failure if done by a fly by night residential contractor. But for this to be the finish on a Starchitect tower, world know tower, built by "Canadas luxury developer."
Its actually embarrassing.