HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


View Poll Results: Is SEPTA doing a great job in regards to bus, subway, and commuter rail overall??????
YES 61 48.41%
NO 65 51.59%
Voters: 126. You may not vote on this poll

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Feb 25, 2021, 12:54 PM
thoughtcriminal thoughtcriminal is offline
Registered User
 
Join Date: Jan 2020
Location: philadelphia
Posts: 579
Quote:
Originally Posted by electricron View Post

Being not familiar with this particular project in Pennsylvania specifics, I'll just leave my comments to suggesting hanging an overhead catenary is far cheaper to implement than installing a third rail system.
here's the issue: the chestnut hill west line is an existing commuter rail line, powered by overhead caternary lines. I am suggesting (and it is not my original idea but one that's been around for decades) to make it a part of the Broad Street subway line, which is powered by a third rail. if we are getting new "metro style" trains, and raising the platforms, which this report suggests, my question is whether to extend the subway line's third rail to power the trains along the commuter rail portion. otherwise they'd have to run caternary lines in the subway, which I don't think is technically feasible. a third option is to have trains that can be powered by both systems, switching between caternary and third rail as necessary.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.