  #2321  
Old Posted Feb 9, 2021, 6:35 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 410
Quote:
Originally Posted by J.OT13 View Post
The offset bus loops at Tunney's and Hurdman (and on a lesser scale, Blair) are a big annoyance on the O-Train system, but it does seem like the City learned its lesson, or don't have enough space to repeat the design flaw, as part of Stage 2.

The bus loop stops at Pinecrest and Lincoln Fields seem to be directly at the station entrances. The same goes for east and south transfer stations.
Would like to point out that the issues at Tunney's, Hurdman, and Blair has more to do with unreasonable requirements in the PA for Stage 1. For example, the requirement for 15 separate platforms/stops plus 25 - 30 layby spots at Hurdman resulted in a station that was massive.

During design, RTG questioned the City/OC Transpo about this and provided proof that only 5 or 6 stops would be required (like the old Hurdman with fewer buses per hour), but they pointed their finger at the PA, closed their eyes, and blocked their ears.

Now look at how many platforms at Hurdman are actually in use... doubt you will ever see the last several platforms ever being used, even during R1 service or on Canada Day (like OC Transpo kept saying). What a waste.

Perhaps they learned from their mistakes, sharpened their pencils, and prepared a PA document for Stage 2 that was more well thought-out/realistic.
Reply With Quote
     
     
  #2322  
Old Posted Feb 9, 2021, 7:05 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Disappointing that the City didn't listen to RTG on that one. At Blair, about half the platform seems to only used to drop people off in the AM. Most of Hurdman is completely unused. I don't know for Tunney's since I've never used the bus loop.

The money for ridiculously large platforms/bus loops could have been used elsewhere.
Reply With Quote
     
     
  #2323  
Old Posted Feb 10, 2021, 3:25 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Hurdman is large for sure, especially the unused stops around the far end. Blair is well-used though, at least the stops A-E closest to the station. In the evening rush hour, the entire platform is in use, and keeping a space open for drop-off is important as nobody wants to wait to alight from their bus when the platform is blocked.
Reply With Quote
     
     
  #2324  
Old Posted Feb 10, 2021, 7:10 PM
Brannwagon Brannwagon is offline
Registered User
 
Join Date: Nov 2019
Location: Ottawa, ON
Posts: 103
Tunney's is fairly well used, as the loop is pretty much full during peak (pre-covid). So looks like that makes Blair and Tunney's, the two temporary loops, the ones that were actually "worth it". Whereas Hurdman, the permanent loop, is a waste of space and money as well as a terrible design for passengers
Reply With Quote
     
     
  #2325  
Old Posted Feb 10, 2021, 8:28 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Algonquin station progress. They've started digging south of the existing tunnel.





More photos on O-Train Fans: https://www.railfans.ca/otrain/snapshot-updates-2/snapshot-of-algonquin-station-february-10-2021
Reply With Quote
     
     
  #2326  
Old Posted Feb 11, 2021, 1:09 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,639
I know the LRT was a bit of a bummer the last couple years but this is kind of exciting! It was great to get Phase 1 rolling but it was already pretty clear that we wouldn't have a proper functioning system without Phase 2. Way less people needing transfers, serving some high traffic and high transit-user neighbourhoods. Looking forward to watching the construction updates!
Reply With Quote
     
     
  #2327  
Old Posted Feb 11, 2021, 7:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Snapshots on O-Train Fans.

Lincoln Fields.







More can be seen: https://www.railfans.ca/otrain/snapshot-...-lincoln-fields-station-february-11-2021

Lincoln Fields Flyover.









More images: https://www.railfans.ca/otrain/snapshot-updates-2/snapshot-of-the-lincoln-fields-flyover

Iris.







More images: https://www.railfans.ca/otrain/snapshot-updates-2/snapshot-of-iris-station-february-11-2021

Queensway station. No work done, just for posterity. The station will be decommissioned sometime in the next year or two.





https://www.railfans.ca/otrain/snapshot-updates-2/snapshot-of-queensway-station-february-11-2021
Reply With Quote
     
     
  #2328  
Old Posted Feb 15, 2021, 1:22 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Reply With Quote
     
     
  #2329  
Old Posted Feb 16, 2021, 2:05 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Snapshot of Pinecrest station, O-Train Fans. Seems they are building the new Pinecrest bridge that will go over the future O-Train Line.




https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-pinecrest-station-february-14-2021
Reply With Quote
     
     
  #2330  
Old Posted Feb 16, 2021, 3:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Regular construction updates on the BayWard Bulletin. Already three in February:

https://www.baywardbulletin.ca/lrt-stage-2/

Does the City have a central location where they save the detour announcements we receive by email? Any other Councillor that keeps track on their website?
Reply With Quote
     
     
  #2331  
Old Posted Feb 16, 2021, 4:02 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Reply With Quote
     
     
  #2332  
Old Posted Feb 16, 2021, 4:04 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
O-Train – Ward 7 February 12, 2021.

Moodie Station Area and Light Maintenance and Storage Facility (LMSF):
  • LMSF retaining wall and block wall construction is underway.
  • LMSF sanitary and watermain work is underway.
  • Moodie Drive drilled shafts and soldier pile work is underway with abutments to follow.
  • NW temporary ramp construction at Moodie Drive is ongoing.
  • Holly Acres and Highway 417 Interchange
  • Electrical duct bank work is underway.
  • Abutment construction is ongoing.
  • Pier cap installation is ongoing.

Pinecrest Station Area
  • Northwest quadrant support of excavation is in progress.
  • Retaining wall construction for new NW ramp is underway.
  • Bridge formwork and abutments are ongoing.
  • Excavation of NE section has started.

Lincoln Fields Flyover Rail Bridge (south of Lincoln Fields)
  • Supporting structures construction work is underway.
  • Retaining wall construction is ongoing.
  • Backfilling is ongoing.

Connaught Cut and Cover Tunnel
  • Watermain relocation is underway on Connaught Avenue.
  • Queensview Station area preparation underway for utilities relocation and excavation.

Lincoln Fields Station Area
  • Carling Avenue watermain relocation is ongoing.
  • Station excavation is underway.
  • Rock breaking is ongoing for utilities work.
  • Temporary traffic realignments are in place on Carling Avenue as work progresses.
  • Utility work is ongoing on the north side of Lincoln Fields Station.
  • Pathway detour is in place.
  • Stormwater relocation has begun near Lawn Ave Parkette and Lincoln Fields.

Byron and Richmond Corridor (Byron Linear Park)
  • Underground utility relocation is ongoing on Byron Avenue.
  • Utilities relocation work on Richmond Road and McEwen Avenue is ongoing.
  • Cylinder piles are being drilled to support cut and cover excavation.
  • Road closures and lane reductions are ongoing for utilities work.

Stay informed of progress by subscribing to Stage 2 LRT project newsletter

https://www.baywardbulletin.ca/lrt-stage-2-update/
Reply With Quote
     
     
  #2333  
Old Posted Feb 16, 2021, 10:19 PM
TheMatth69 TheMatth69 is offline
Registered User
 
Join Date: Apr 2019
Posts: 158
Quote:
Originally Posted by J.OT13 View Post
How do they plan on getting transitway buses to Pincrest, if the off ramp is closed untill 2023 ?
Reply With Quote
     
     
  #2334  
Old Posted Feb 17, 2021, 2:15 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Woodroffe-Carling-Pinecrest for cars and I assume the same for buses. I could see some routes skip Pinecrest station like many skipped Cyrville-Hurdman during Stage 1 construction.
Reply With Quote
     
     
  #2335  
Old Posted Feb 17, 2021, 3:52 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
Woodroffe-Carling-Pinecrest for cars and I assume the same for buses. I could see some routes skip Pinecrest station like many skipped Cyrville-Hurdman during Stage 1 construction.
I agree. Most westbound routes will likely end up skipping Pinecrest station (which will likely be closed during construction anyway). As for route 282, if I had to guess, it will get off the transitway at Lincoln Fields and take Carling and Richmond to Pinecrest.
Reply With Quote
     
     
  #2336  
Old Posted Feb 17, 2021, 5:28 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,081
Quote:
Originally Posted by J.OT13 View Post
The offset bus loops at Tunney's and Hurdman (and on a lesser scale, Blair) are a big annoyance on the O-Train system, but it does seem like the City learned its lesson, or don't have enough space to repeat the design flaw, as part of Stage 2.
Probably space constraints, thankfully. Otherwise they'd station-spread as usual.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #2337  
Old Posted Feb 17, 2021, 1:43 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Quote:
Originally Posted by roger1818 View Post
I agree. Most westbound routes will likely end up skipping Pinecrest station (which will likely be closed during construction anyway). As for route 282, if I had to guess, it will get off the transitway at Lincoln Fields and take Carling and Richmond to Pinecrest.
Yup, that makes a whole lot more sense for bus detours.
Reply With Quote
     
     
  #2338  
Old Posted Feb 19, 2021, 2:38 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Tunnel construction along the Sir John A. Macdonald Parkway.

Video Link
Reply With Quote
     
     
  #2339  
Old Posted Feb 19, 2021, 3:03 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
Tunnel construction along the Sir John A. Macdonald Parkway.

Interesting, but not the best view from a forward facing dashcam in a car, as most of what you see is road and fence. I would love to see it from the upper level of a double decker bus and angled to the right to better see the construction. I guess beggars can't be choosers though.
Reply With Quote
     
     
  #2340  
Old Posted Feb 19, 2021, 3:08 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Quote:
Originally Posted by roger1818 View Post
I agree. Most westbound routes will likely end up skipping Pinecrest station (which will likely be closed during construction anyway).
The problem with keeping routes on the 417 and skipping Pinecrest is that they then must also skip Bayshore and Moodie as well, unless they send them onto Woodridge. I suppose it is inevitable that the Connexion routes will start bypassing Moodie and Bayshore at some point when the Transitway between Bayshore and Moodie closes.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:30 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.