HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #41  
Old Posted Dec 13, 2020, 11:12 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,894
Quote:
Originally Posted by J.OT13 View Post
Good. This should be a solid addition to the Westboro skyline. Not quite as good as Metropole, but far better than other buildings proposed or u/c.
It's just too bad about the Roderick Lazy tower right they just built next door. At least it will be surrounded by better buildings like this.
Reply With Quote
     
     
  #42  
Old Posted Dec 14, 2020, 2:01 AM
Urbanarchit Urbanarchit is offline
Registered User
 
Join Date: Jun 2013
Location: Ottawa
Posts: 1,927
Quote:
Originally Posted by Harley613 View Post
It's just too bad about the Roderick Lazy tower right they just built next door. At least it will be surrounded by better buildings like this.
What if I told you this building is RLA too? There are 5 buildings built or proposed by Westboro Station designed by RLA: this one, 2050 Scott, 1960 Scott, and the two 319 McRae buildings behind 1960 Scott. They get a lot of big work...

At least the one by Granite Curling Club (can't find the thread) and 2070 Scott are by different firms.
Reply With Quote
     
     
  #43  
Old Posted Dec 14, 2020, 3:10 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,894
Quote:
Originally Posted by Urbanarchit View Post
What if I told you this building is RLA too? There are 5 buildings built or proposed by Westboro Station designed by RLA: this one, 2050 Scott, 1960 Scott, and the two 319 McRae buildings behind 1960 Scott. They get a lot of big work...

At least the one by Granite Curling Club (can't find the thread) and 2070 Scott are by different firms.
I wouldn't be surprised. I honestly can't keep up with it, and now they are throwing a pinch of habanero into every 19th building they design. I'm exhausted.
Reply With Quote
     
     
  #44  
Old Posted Feb 9, 2021, 3:13 AM
Ott902 Ott902 is offline
Registered User
 
Join Date: Feb 2021
Location: Ottawa
Posts: 5
Houses on Tweedsmuir were demolished today

Reply With Quote
     
     
  #45  
Old Posted Feb 9, 2021, 1:49 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Has this one been approved yet? Are we expecting construction to start soon? I'm really looking forward to this one, the Lofty building and the one at the corner of Churchill. Some amazing designs and good height.
Reply With Quote
     
     
  #46  
Old Posted Feb 9, 2021, 3:11 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
There are some October 2020 and Jan 2021 plans posted
https://devapps.ottawa.ca/en/applications/__BR8G79/details
Reply With Quote
     
     
  #47  
Old Posted Feb 9, 2021, 3:39 PM
CapitalCity613 CapitalCity613 is offline
Closed account
 
Join Date: Jan 2021
Location: Ottawa
Posts: 51
Quote:
Originally Posted by J.OT13 View Post
Has this one been approved yet? Are we expecting construction to start soon? I'm really looking forward to this one, the Lofty building and the one at the corner of Churchill. Some amazing designs and good height.
Not quite yet, but they're on 3rd submission so it's down to the details now. I would anticipate approval very soon. Neuf has taken over from RLA and the building has a fresh look I know a lot of people here will appreciate.
Reply With Quote
     
     
  #48  
Old Posted Feb 9, 2021, 4:02 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Quote:
Originally Posted by CapitalCity613 View Post
Not quite yet, but they're on 3rd submission so it's down to the details now. I would anticipate approval very soon. Neuf has taken over from RLA and the building has a fresh look I know a lot of people here will appreciate.
Thanks for the update. So the latest submission is just about the same design as the one released in April 2020, based in the elevations. For sure a big step up from the first proposal by RLA.
Reply With Quote
     
     
  #49  
Old Posted Feb 14, 2021, 11:00 PM
concrete06 concrete06 is offline
Registered User
 
Join Date: Aug 2006
Posts: 81
Feb 11, 2021



Reply With Quote
     
     
  #50  
Old Posted Mar 25, 2021, 2:52 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Quote:
Kate Porter
@KatePorterCBC

A rare #ottcity planning mtg with no community delegations. Every file gets approved with few questions.

For instance, some changes to a tower b/w Tweedsmuir and McRae previously approved in '18.

Also, OK'd in #kitchissippi: 18- and 16-storey towers on Carling near Churchill



10:19 AM · Mar 25, 2021·Twitter Web App
https://twitter.com/KatePorterCBC/status/1375089951986057222

Last edited by rocketphish; Mar 26, 2021 at 1:13 AM. Reason: Removed misleading image
Reply With Quote
     
     
  #51  
Old Posted Mar 25, 2021, 2:54 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Anyone know the difference between this version and the second version from April 2020?
Reply With Quote
     
     
  #52  
Old Posted Mar 26, 2021, 1:33 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,636
Well, it looks like the windows have been rearranged in the east and west faces of the tower. The center balconies on the north face are no longer staggered. The west face of the low-rise portion (Building B) seems to have longer balconies than before.

Here are the Urban Design Review Panel Recommendations from August 2020









Reply With Quote
     
     
  #53  
Old Posted Mar 26, 2021, 11:51 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Hadn't even noticed the staggered balconies on the second submission. Odd choice that did not go with the style. Good call removing them.

I wish the design review panel meetings were streamed live on YouTube.
Reply With Quote
     
     
  #54  
Old Posted Jun 11, 2021, 9:08 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 367
Construction has finally started. 5 steel IBeam piles have already been planted along Scott St. Frontage.
Reply With Quote
     
     
  #55  
Old Posted Jun 12, 2021, 12:44 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
With Azure, that's two huge projects u/c along Scott. Can't wait to see the evolving skyline along the western alignment.
Reply With Quote
     
     
  #56  
Old Posted Jun 14, 2021, 1:39 AM
SidetrackedSue SidetrackedSue is offline
Registered User
 
Join Date: Jun 2019
Posts: 398
Quote:
Originally Posted by J.OT13 View Post
With Azure, that's two huge projects u/c along Scott. Can't wait to see the evolving skyline along the western alignment.
I can't wait for all the construction to be finished.

Yes, I know I will be a really old lady by then. The LRT is slipping behind, originally when my husband was 65, then me at 65 and now who knows. At least in a few cases the construction of the towers will happen along with the disruption of the LRT so we might get Scott back a bit faster.
Reply With Quote
     
     
  #57  
Old Posted Jun 24, 2021, 7:12 PM
saiyfus saiyfus is offline
Registered User
 
Join Date: Nov 2019
Posts: 34






There was a second shoring rig on site too, around the corner on Scott St. Full steam ahead!
Reply With Quote
     
     
  #58  
Old Posted Sep 30, 2021, 7:38 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 367
Crane base is installed. Blasting and excavation is still on going.
Reply With Quote
     
     
  #59  
Old Posted Oct 2, 2021, 7:55 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 367
Tower Crane is going up today.
Reply With Quote
     
     
  #60  
Old Posted Nov 6, 2021, 3:33 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,672


They aren't going very deep on this one.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 6:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.