Quote:
Originally Posted by TheMatth69
Why did they get rid of the pocket track at South Keys ? This is going to create operation problems ... Interesting to see how they're going to operate Line 4 with Line 2.
PS: Nevermind didn't notice that the west track at South Keys doesn't connect to the main line south of the station (it used to before).
|
Quote:
Originally Posted by lrt's friend
That makes no sense. There has to be a passing track between Brookfield and Leitrim. The only place possible is South Keys. There needs to be a cross-over south of South Keys station.
|
Good Day.
IMHO, this GeoOttawa has introduced many errors.
Whether or not a pocket track has been retained or eliminated at SouthKeys is open to conjecture - we have heard both ways. To loose it is to have big difficulties for Line 4 ops, as you note.
BUT
They have lost the necessary crossover south of SouthKeys, as you note.
There is no way that can be eliminated. Southbound-Limebank at SouthKeys must be able to get to the eastern side of the track pair to continue on south, and not go to YOW. No sense.
<< Unless they are planning Line 2 single track ops all the way from south of Carleton ==all the way== to south of NCC ??? umnnn....WOW ! >>
AND
They do not show the NCC freight track south of the Airport spur divergence.
Again, this is part and parcel of the current single track ops from south of SouthKeys to south of the NCC yard, where the single track ops twins on south to Limebank.
They HAVE eliminated the pocket track east of Limebank, as had been reported.
As for loosing the plaza at Gladstone (CI), I can only assume they have left out preliminary details. It seems to me they do not indicate ANY plazalike structure or ANY connection to Gladstone. Gone missing in transfer ?
I can only assume much has been FUBARed in communication of plans between T-Next and GeoOttawa, and we will have to await a refresh and correction.
Finally, as for Bayview's eastside platform, all the info on it that I have heard has been that it is intended for utility and emergency use only, for the duration of the life of Phase 2. This bears it out.
No stairs, No escalators, No elevators, No shelters or structures, No connections to anywhere at all. AND, as you note, NO provision for such in the future without massive closures and construction.
OUCH!
And, as a sidenote, they still do not show the second (southern) launch track at Belfast Yard. <sigh>