HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jan 19, 2021, 8:22 PM
thoughtcriminal thoughtcriminal is offline
Registered User
 
Join Date: Jan 2020
Location: philadelphia
Posts: 587
Quote:
Originally Posted by Skintreesnail View Post
I don't think terminating the trolley at 30th is a good idea. Lots of people depend on the trolley to get to center city.
ok, under this proposal, they could transfer at 30th street to the MFL and get to CC that way. not a big deal.
Quote:
Originally Posted by Skintreesnail View Post
If anything I think the trolley, el and suburban trolley routes should be merged into one light rail system that is through running to frankford (and preferably beyond). They're all on the same guage track and share same ROW through CC. It'll never happen, but as long as we're dreaming...
no way a light rail system could handle that kind of capacity. the MFL can barely handle it (at least in pre-covid times).
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 8:17 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.