Wong - What you just described above is what I call the nightmare scenario for Denver. How can we spend more billions of dollars to serve as few people as possible (but as many different counties as possible yay!) with a system nobody really likes. Another grab bag for the region that provides nothing to Denver proper, which will continue to see the bulk of development.
Also I truly fail to see what is so wrong with I-25 - bc it's slow at 5 o'clock, in the middle of a Top 15 largest and Top 4 fastest growing metro?? It's already being "fixed" in the gap south of Castle Rock and its already in advanced stages of induced traffic cycles (earlier than even projected). Building our way out of I-25 congestion is a lot less likely than reducing congestion by providing more viable transit alternatives. It would honestly help more suburban commuters to explore a full freeway upgrade for Parker Road, providing an alternative to 25.
Why should Denver pay into another transportation package that doesn't really benefit Denver any? Especially after we have (very astutely) paid for the BRT experiment ourselves? Subway or bust, seriously. Why should Seattle, Austin, Pittsburgh and other peer cities and/or lower tier cities have subway but not Denver? Even my home town of Dallas (ew) has 1-2 mile sections of subway.
Quote:
Originally Posted by PLANSIT
East Colfax BRT will likely end up in the $200-$250M range.
The 15 carries ~11k per day pre-pandemic
The 15L carries ~11k per day pre-pandemic
Please don’t make up facts for argument’s sake.
We aren’t getting a subway.
|
Sorry, I was confusing it with the Average Daily Traffic (ADT) counts for some stretches of Colfax, which I saw in the East NPI Plan. Thanks for the correction on ridership, but you're also shorting it by nearly 10%. Combined the two carry around 24,000 riders, and pandemic numbers are obviously not relevant.
Source:
https://www.rtd-denver.com/projects/east...(15,than%20some%20RTD%20rail%20corridors.
Unfortunately this means that prospective BRT ridership will be much lower than I had spit balled. Again BRT only provides incremental improvement rather than multiplying ridership. Maybe it will grow ridership by 50% but the actual service will be slower than the 15L and signal prioritization never works with urban BRT corridors.
There is no way that the Colfax BRT costs less than $250 million, but at least it's not RTD's problem as the City will provide I believe $77 million for the required FTA match. I believe FTA dropped the local match requirement down to 20% so that will be good for around $350 million.
__
In Cleveland, whose HealthLine is considered the national gold standard for BRT, the BRT similarly replaced their region's busiest bus route along the eastside's main drag. Their $200 million, 7.1-mile BRT (funded in 2005) system only increased ridership by 48%. This is despite (allegedly) over $9 billion in "TOD." This for a line that serves a much higher share of transit-dependent riders in a denser, older urban environment that's also seen about as much infill and new development as east Denver. This is the best comparable for what to expect.
It also literally takes about 45 minutes for a rush hour trip on just the 4-mile central stretch between downtown Cleveland and University Circle. Not only does signal prioritization not work well for urban BRTs but it often makes things worse as each signal has to have a separate signal cycle for each traffic movement per FTA.
http://www.riderta.com/healthline/about