Anyone know why some fare gates are being left permanently open at some stations? Parliament and Tunney’s have had a few gates left open for at least two weeks now, also seen at Rideau but not sure of the duration. You would think that this is a crucial time to be collecting as much fare revenue as possible along with (somewhat) accurate ridership data.
     
     
  #14922  
Old Posted Jan 8, 2021, 5:50 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
#1149(?) coming in from Brampton. Well, half of #1149(?)


https://twitter.com/John_T_Ottawa/status/1347276874393780229
     
     
  #14923  
Old Posted Jan 8, 2021, 9:38 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Hurdman often being the subject of our ire, I thought I would bring two examples of Toronto area rail-bus transfers. One good example, and one arguably worse than Hurdman.

First the good example, the new bus terminal at Kipling station. This is a major transfer between Mississauga MiWay, GO and the TTC Subway. Of course this transfer hub is far busier than Hurdman, but the basic concept remains; the bus station includes a large, indoor, climate controlled waiting area and the exterior platform sports a generous canopy all around.

• Video Link





https://www.mississauga.ca/miway-transit/about-miway/kipling-bus-terminal/

On the other end of the spectrum, Humber College bus terminal, a transfer station between Brampton, Mississauga and TTC buses and the future Finch LRT station. The bus station is just an open canopy, better than Hurdman, but not great. It will be quite a hike of 250 meters between the LRT and bus terminal

• Video Link



https://humber.ca/staff/announcement/lrt-construction-and-tree-removal-update


https://blog.metrolinx.com/2019/11/15/fu...-find-features-of-the-lrt-elements-here/

For Hudman station, a proper climate controlled bus terminal could have been built under the station and the guideway along the bus loop. A canopy could have been extended from the guideway to cover the bus platform. Why is it too much to ask for the busiest permanent bus-rail transfer to be built in a way that meets the needs of passengers?
     
     
  #14924  
Old Posted Jan 8, 2021, 10:44 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
 
Join Date: Nov 2005
Posts: 4,703
The Finch transit hub where TTC, GO and York transit (Viva) converge is old and ratty but still better than any transfer points we have here.
     
     
  #14925  
Old Posted Jan 9, 2021, 10:47 AM
eltodesukane eltodesukane is offline
 
Join Date: Dec 2011
Posts: 1,146
Quote:
Originally Posted by J.OT13 View Post
[...] the bus station includes a large, indoor, climate controlled waiting area and the exterior platform sports a generous canopy all around. "
Exactly what is missing at Ottawa's St Laurent station.
Very unpleasant waiting for the bus there!
     
     
  #14926  
Old Posted Jan 11, 2021, 4:32 PM
RogueNacho RogueNacho is offline
 
Join Date: Jun 2018
Posts: 273
Apologies if this has already been addressed, but do they ever plan to uncouple the LRT vehicles and run them as single-vehicle trains? I remember reading a long time ago that the two-vehicle trains were to be run at peak hours and then uncoupled and run as single-vehicle trains during evenings and weekends. Was that idea scrapped at some point?

In which case, why have a two-vehicle train configuration at all instead of just running longer single-vehicle trains? Right now there's a lot of wasted space in the middle of each train taken up by the operator's cabin and the coupling section between vehicles.
     
     
  #14927  
Old Posted Jan 11, 2021, 4:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by RogueNacho View Post
Apologies if this has already been addressed, but do they ever plan to uncouple the LRT vehicles and run them as single-vehicle trains? I remember reading a long time ago that the two-vehicle trains were to be run at peak hours and then uncoupled and run as single-vehicle trains during evenings and weekends. Was that idea scrapped at some point?

In which case, why have a two-vehicle train configuration at all instead of just running longer single-vehicle trains? Right now there's a lot of wasted space in the middle of each train taken up by the operator's cabin and the coupling section between vehicles.
That was the plan, but the coupling/uncoupling proved to be an issue. No word on whether this might be implemented eventually.

I agree that the current configuration is a waste and hope that future orders will be for full 100+ meter trains. At the moment, no such train sets exist in low-floor LRT, but that could change over the next few decades, as we've seen with subway trains (TTC Rocket, Montreal Azure, Vancouver Mark-III).
     
     
  #14928  
Old Posted Jan 11, 2021, 9:29 PM
MalcolmTucker MalcolmTucker is online now
 
Join Date: May 2007
Posts: 11,642
It wouldn't be the hardest to do technically. From an operational standpoint there would be less flexibility, and from a maintenance standpoint you'd probably need to rebuild the maintenance facility(ies).
     
     
  #14929  
Old Posted Jan 12, 2021, 12:32 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by MalcolmTucker View Post
It wouldn't be the hardest to do technically. From an operational standpoint there would be less flexibility, and from a maintenance standpoint you'd probably need to rebuild the maintenance facility(ies).
Wasn't the Belfast maintenance facility built to accommodate the frequent coupling/uncoupling in the first place? They only realized it was not feasible after Belfast Stage 1 was completed.
     
     
  #14930  
Old Posted Jan 12, 2021, 8:32 PM
Catenary Catenary is offline
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by J.OT13 View Post
Wasn't the Belfast maintenance facility built to accommodate the frequent coupling/uncoupling in the first place? They only realized it was not feasible after Belfast Stage 1 was completed.
The constraint on maintenance is usually the length of the indoor maintenance area; if you only have a 60m building, it's hard to work on a 100m train. A long-term solution is to eliminate a cab at each end but keep the coupling, and probably a hostler control. This way you save the space and expense of the second set of controls, but maintain maintenance flexibility.

The constraints on coupling/uncoupling I have heard are mostly related to reliability. With two trains, you have one ready to push/pull when the other one requires it. We have seen singles running when they test new units late at night, but that's it.
     
     
  #14931  
Old Posted Jan 28, 2021, 6:09 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
24/7 live stream of the Confederation Line between Cyrville and Blair stations.

• Video Link


EDIT: a visual of where the camera is set-up and what area of the tracks is captures.


https://twitter.com/rail613/status/1354852559786307590

Last edited by J.OT13; Jan 28, 2021 at 7:37 PM.
     
     
  #14932  
Old Posted Jan 28, 2021, 6:09 PM
sseguin sseguin is offline
 
Join Date: Aug 2018
Posts: 322
**LIVESTREAM**

Enjoy this all-day, all-weather, all-season livestream of Ottawa's O-Train Line 1 (Confederation Line). Using the Alstom Citadis Spirit, it is the busiest LRT line in North America carrying up to 180,000 weekday riders.

On this live-feed, you can observe the trains approaching and leaving Blair Station, the eastern terminus of O-Train Line 1 (Confederation Line), located less than 200m east of this camera's position. To the west, approximately 1300m away is Cyrville station.

A very special thank you to David Bellerive (Twitter @Dbellerive15) for hosting and operating this camera for Rail Fans, the first in the city!

https://www.railfans.ca/otrain/live-1-east
     
     
  #14933  
Old Posted Jan 28, 2021, 7:04 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Sorry Shane. I feel like I stole your thunder.

This is an awesome addition to O-Train Fans. Kudos to David and yourself for pulling this off.
     
     
  #14934  
Old Posted Jan 29, 2021, 9:48 PM
AuxTown's Avatar
AuxTown AuxTown is offline
 
Join Date: Apr 2006
Posts: 4,654
Super cool, I still get excited when I'm driving and I see a train along Nicholas or Scott. Thanks!
     
     
  #14935  
Old Posted Jan 30, 2021, 4:29 PM
SidetrackedSue SidetrackedSue is offline
 
Join Date: Jun 2019
Posts: 399
Thanks for the link!

I have a community bound grandchild who pines for the LRT. When I am allowed to take him from home, he begs to go watch the trains at Tunneys or Blair.
     
     
  #14936  
Old Posted Feb 1, 2021, 1:35 PM
AuxTown's Avatar
AuxTown AuxTown is offline
 
Join Date: Apr 2006
Posts: 4,654
For those of you in the know, have there been any temperature-related issues this Winter? How are the new heaters working? Do you think we have worked out most of the kinks or is ridership so low it's impossible to know?
     
     
  #14937  
Old Posted Feb 1, 2021, 1:57 PM
LeadingEdgeBoomer LeadingEdgeBoomer is offline
 
Join Date: Mar 2010
Posts: 1,419
Quote:
Originally Posted by AuxTown View Post
For those of you in the know, have there been any temperature-related issues this Winter? How are the new heaters working? Do you think we have worked out most of the kinks or is ridership so low it's impossible to know?
Not many. The new gas heaters seem to be working fine.
     
     
  #14938  
Old Posted Feb 1, 2021, 2:56 PM
TransitZilla TransitZilla is offline
 
Join Date: Dec 2006
Posts: 2,801
Quote:
Originally Posted by AuxTown View Post
For those of you in the know, have there been any temperature-related issues this Winter? How are the new heaters working? Do you think we have worked out most of the kinks or is ridership so low it's impossible to know?
Doesn't seem like there's been any switch related issues at all this winter. There have been a few incidents with stopped trains (including 3 the evening of January 26th when there was a snowfall). But they all seem to have been relatively brief, and service continued with single-tracking.

I'm not sure if the issues were related to power (inductors), doors, or brake faults. The latter seems to be the most common cause of stoppages recently.
     
     
  #14939  
Old Posted Feb 9, 2021, 3:16 PM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
This is very cool! In Dresden Germany they have snowplow/ice removal adapters that hitch to the front of their trams. I wonder if something like this could help Ottawa's trains during the winter. I guess we haven't had as many issues this year because it's the lightest winter I can ever remember, but I imagine the problems will arise anew during a normal winter.

https://www.reddit.com/r/specializedtool..._source=share&utm_medium=web2x&context=3
     
     
  #14940  
Old Posted Feb 9, 2021, 3:51 PM
Williamoforange's Avatar
Williamoforange Williamoforange is offline
 
Join Date: Sep 2020
Posts: 888
Quote:
Originally Posted by Harley613 View Post
This is very cool! In Dresden Germany they have snowplow/ice removal adapters that hitch to the front of their trams. I wonder if something like this could help Ottawa's trains during the winter. I guess we haven't had as many issues this year because it's the lightest winter I can ever remember, but I imagine the problems will arise anew during a normal winter.

https://www.reddit.com/r/specializedtool..._source=share&utm_medium=web2x&context=3
RTG has plows already to clear the snow that's accumulated during off periods. After that the constant train movement keep the rails clear.

And while the amount had been low, there were heavy snow days already this year and last, and snow clearing wasn't a problem.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.