  #3941  
Old Posted Dec 17, 2020, 11:22 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,496
I note that all the pre-load along Highway 99 had been removed. Either no longer necessary or its finished doing its job?
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
Reply With Quote
     
     
  #3942  
Old Posted Dec 17, 2020, 11:46 PM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,921
Quote:
Originally Posted by VancouverOfTheFuture View Post
wonderful.

8yrs later, 1 billion more, and about 1/10 of the scope of the original.

great job NDP!!!
Yep, almost as if it is playing out exactly as I have been predicting for the last 4 years.

Sometimes I hate being right.

Seems that the best option was to have continued with the project with a slight reduction in scope, reducing the bridge from 10 lanes to 8, oh wait, I have said that before!

Oh well!

No matter how many times I explained the real situation at hand everyone else just talked / argued about bullshit that was neither here nor there.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #3943  
Old Posted Dec 18, 2020, 2:03 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,308
Stop posting the same thing over and over. We get it
Reply With Quote
     
     
  #3944  
Old Posted Dec 18, 2020, 2:28 AM
Cypherus's Avatar
Cypherus Cypherus is offline
Registered User
 
Join Date: Jan 2007
Location: Surrey
Posts: 1,759
Good news that at least an 8 lane crossing (submerged tunnel or bridge) are in the business case as the two most important options. The irony is that consultations with stakeholders will likely be short, as this project would be perfect for promoting economic recovery federally and provincially.
Reply With Quote
     
     
  #3945  
Old Posted Dec 18, 2020, 3:16 AM
Cypherus's Avatar
Cypherus Cypherus is offline
Registered User
 
Join Date: Jan 2007
Location: Surrey
Posts: 1,759
Quote:
Originally Posted by Cypherus View Post
Good news that at least an 8 lane crossing (submerged tunnel or bridge) are in the business case as the two most important options. The irony is that consultations with stakeholders will likely be short, as this project would be perfect for promoting economic recovery federally and provincially.
Dailyhive recently published an article about the case:

8 lane immersed tunnel option:

But that Steveston interchange is...missing an overpass?

8 lane bridge option:

Looks like a nice twin of the Alex Fraser Bridge.

Link: https://dailyhive.com/vancouver/george-massey-tunnel-replacement-business-case
Reply With Quote
     
     
  #3946  
Old Posted Dec 18, 2020, 4:49 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
My concern is that the upgrades to Hwy99 are going to get neutered or scaled down because they want to please Richmond and Delta who were crying "there's gonna be more traffic!!", even though the upgrades are just as important as the new crossing. Imagine keeping that outdated Steveston interchange as is.


Well, at least they didn't propose a 6 lane crossing lol
Reply With Quote
     
     
  #3947  
Old Posted Dec 18, 2020, 5:02 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,921
Quote:
Originally Posted by ilikeredheads View Post
My concern is that the upgrades to Hwy99 are going to get neutered or scaled down because they want to please Richmond and Delta who were crying "there's gonna be more traffic!!", even though the upgrades are just as important as the new crossing. Imagine keeping that outdated Steveston interchange as is.


Well, at least they didn't propose a 6 lane crossing lol
That is exactly the plan. As I have explained many times before.

They even plan to retain the existing overpass structure at the Steveston Interchange!

Essentially this project will JUST be the tunnel.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #3948  
Old Posted Dec 18, 2020, 5:14 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,397
Ever since the original 10-lane bridge died, I have been rooting for a tunnel. We have enough bridges and having a tunnel would be nice change. No other reason.

Interesting that in the bridge option one of the tunnels would stay? Looks like the Deans Island entry is there in the rendering...
Reply With Quote
     
     
  #3949  
Old Posted Dec 18, 2020, 5:18 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,536
The reason for a 10 lane (versus 8 lane) bridge was to have climbing lanes for trucks.

So I'm glad that the 8 lane repalcement will be a tunnel with shallower slopes than a bridge, so that throughput will probably be closer to the 10 lane bridge.
Reply With Quote
     
     
  #3950  
Old Posted Dec 18, 2020, 5:19 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,921
For the record my issue isn’t with it being a tunnel rather than a bridge (even though I prefer a bridge for views / experience), my issue is the severe reduction in scale of the project along the highway corridor itself (including the elimination of rebuilt interchanges and the median lane rapid bus system) couple with a decade long delay at a cost of a billion more dollars. Not to mention all the geotechnical and prep work already completed for the bridge.

So, spending much more for much less with a decade delay.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #3951  
Old Posted Dec 18, 2020, 6:13 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
does anyone here really think the tunnel will happen? i am 99% sure it will never happen.

they will need to trench/dredge across an ecologically sensitive area to do that. i very highly doubt that'll be approved by the federal government.

do people here really think it'll happen? especially with a federal government all into saving fish/wales/etc. you know there will probably be protests about it to.
Reply With Quote
     
     
  #3952  
Old Posted Dec 18, 2020, 8:10 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,074
Quote:
Originally Posted by VancouverOfTheFuture View Post
does anyone here really think the tunnel will happen? i am 99% sure it will never happen.

they will need to trench/dredge across an ecologically sensitive area to do that. i very highly doubt that'll be approved by the federal government.

do people here really think it'll happen? especially with a federal government all into saving fish/wales/etc. you know there will probably be protests about it to.
The Fraser River is dredged every year to maintain the navigation channel, this is nothing new.
Reply With Quote
     
     
  #3953  
Old Posted Dec 18, 2020, 2:57 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,575
Part of the original 10 lane bridge included massive dredging (and extra height) to allow more ships up and down the Fraser.
Reply With Quote
     
     
  #3954  
Old Posted Dec 18, 2020, 3:48 PM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,397
Quote:
Originally Posted by officedweller View Post
The reason for a 10 lane (versus 8 lane) bridge was to have climbing lanes for trucks.
Yes and this is so important. On Highway 1 there is a small uphill eastbound at Lougheed and even there trucks get slown down to 70km/h which impact the traffic flow. Climbing up a huge bridge this is many times worse and a climbing lane is so warranted.
Reply With Quote
     
     
  #3955  
Old Posted Dec 18, 2020, 4:54 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,308
The interchanges can be upgraded at a later date, what’s important is getting the new tunnel built asap
Reply With Quote
     
     
  #3956  
Old Posted Dec 18, 2020, 7:24 PM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
Originally Posted by libtard View Post
The interchanges can be upgraded at a later date, what’s important is getting the new tunnel built asap
The interchanges are just as a bottleneck as the tunnel. They are simply not designed for today's demand.

The best time to upgrade them is when you are replacing the tunnel at the same time, to keep costs down and to avoid long term disruption. How many times do we have to endure this pathetic notion of "let's build it piece meal and do it later" nonsense??? Hey, it only took more than 30 years to remove that stupid traffic light on Hwy91 and 72nd.
Reply With Quote
     
     
  #3957  
Old Posted Dec 18, 2020, 8:07 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,910
For the people SoF, one of the biggest issues will be that the road is toll-free.

Christy put up the 10 lane bridge because she had little intention of actually funding much of the project as toll would do that.
Reply With Quote
     
     
  #3958  
Old Posted Dec 18, 2020, 9:05 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,308
Quote:
Originally Posted by ilikeredheads View Post
The interchanges are just as a bottleneck as the tunnel. They are simply not designed for today's demand.

The best time to upgrade them is when you are replacing the tunnel at the same time, to keep costs down and to avoid long term disruption. How many times do we have to endure this pathetic notion of "let's build it piece meal and do it later" nonsense??? Hey, it only took more than 30 years to remove that stupid traffic light on Hwy91 and 72nd.
I agree with you but this is the way we have always built infrastructure projects in Vancouver, why would this be any different?
Reply With Quote
     
     
  #3959  
Old Posted Dec 18, 2020, 9:06 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,639
Do a bit, price goes up, do some more, price goes up, do some more, price goes up, repeat.
Reply With Quote
     
     
  #3960  
Old Posted Dec 19, 2020, 12:24 AM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,677
Quote:
Originally Posted by cganuelas1995 View Post
Do a bit, price goes up, do some more, price goes up, do some more, price goes up, repeat.
Rome wasn't built in a day.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:33 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.