HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Rideau + Chapel South Tower in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Ottawa Skyscraper Diagram

Map Location

Reply

 
Thread Tools Display Modes
     
     
  #121  
Old Posted Oct 29, 2019, 6:36 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
Construction progress from the Trinity Website:





Reply With Quote
     
     
  #122  
Old Posted Oct 30, 2019, 2:08 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
July 2019 plans posted
https://app01.ottawa.ca/postingplans/appDetails.jsf?lang=en&appId=__AGGUWN

Looks like a privately owned public space at the corner...seating area with Adirondack chairs
Reply With Quote
     
     
  #123  
Old Posted Nov 7, 2019, 2:47 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
Reply With Quote
     
     
  #124  
Old Posted Nov 29, 2019, 2:21 PM
sleye sleye is offline
Registered User
 
Join Date: Aug 2011
Posts: 35
Quote:
LRT the ‘driving factor’ in Trinity’s planned residential builds in downtown Ottawa
BY: David Sali

A few blocks east of the Rideau LRT station, Ottawa’s Trinity Development Group has launched the first stage of its ambitious plan to build 2,700 new rental units near light rail stops over the next several years.

Last week, Trinity broke ground on a new 25-storey mixed-use tower at 151 Chapel St. near the corner of Rideau. The building will feature 315 rental suites ranging from studio apartments to two-bedroom units and will also have more than 9,200 square feet of ground-floor retail space, with occupancy targeted for some time in 2022.

A joint venture with fellow Ottawa developer Timbercreek, it’s the first of two apartment highrises the companies plan to build at the coveted development site located just a few hundred metres from the city’s largest shopping mall and one of its busiest transit hubs.

The second phase would be a 25-storey building with 318 rental units. In total, the site would have 477 parking spaces, most of them underground.

“We believe this is going to be very successful, and our hope is that we can roll right into phase two,” says Mathew Laing, Trinity’s senior vice-president of planning and development. “We’ve always liked the property.”

Trinity and Timbercreek's planned build at 151 Chapel St.
The project has been years in the making. Five years ago, Trinity proposed a two-tower development at Chapel and Rideau linked by a shared podium that would have featured a supermarket as an anchor tenant.

But after Timbercreek came on board as a partner, the two firms reassessed the project and determined that “breaking this into two phases was the way to go,” Laing says. “We put a lot of work into this redesign.”

However, a phased approach meant scrapping the podium idea, and the builders were forced to rethink the retail mix at the site.

“We no longer had that large floor plate that a single large-format retailer (such as a supermarket) could use,” Laing explains.

He and his colleagues at Trinity have high hopes for the Rideau and Chapel development, but it’s far from the only transit-fuelled construction plans in the company’s project pipeline.

Like other developers such as RioCan REIT and Killam Apartment REIT ​– who’ve teamed up on a plan to build a series of apartment highrises near the Blair LRT station in the east end ​– Trinity and its partners see massive potential for light rail to trigger new real estate opportunities in a city with a rental vacancy rate of under two per cent.

“The LRT is definitely a driving factor,” Laing says. “For us, our focus has been really on mixed-use buildings and creating those environments where people can have those live-work-play type opportunities. That’s what we’re really focused on.”

Next up on Trinity’s to-build list is a three-tower mixed-use development at 900 Albert St., just steps from the Bayview LRT station where the Trillium and Confederation lines meet.

Trinity is joining forces with InterReit REIT and PBC Real Estate Advisors on the massive project, which will include three highrises of 65, 56 and 27 storeys with a total of about 1,300 rental apartments. Laing said “ballpark figures” call for roughly 85,000 square feet of retail and half a million square feet of office space at the site.

The developers have yet to set a timeline for construction, but the retail and office components are “doing very well from a leasing perspective,” Laing says, adding “several large-scale tenants” are already on board.

“Really now, it’s about getting that mix in place where you have your large-scale anchor tenants … and then you complete that picture by working with some of the smaller retailers as well to create that full dynamic that we want,” he says. “That entire project will have a real interesting life cycle because of all the different people that will be coming in and out.”

A few hundred metres farther south, Trinity is partnering with CLV Group and PBC Real Estate Advisors on a 745-unit apartment complex at the corner of Gladstone and Loretta avenues, near the future Gladstone LRT station.

The proposal calls for three towers of 35, 33 and 30 storeys with a mix of residential, retail and office space.

Laing says the developers are still trying to figure out how to integrate the heritage Enriched Bread Artists building at 951 Gladstone Ave. into the proposal, but he says he expects a site plan to be filed early in the new year.

“We’re diligently working on that,” Laing says.

The executive says Trinity founder John Ruddy had company officials study all the proposed LRT lines years ago to identify possible nearby development sites. Those efforts are paying off, Laing says. “We’re really excited about what’s going on in Ottawa right now.”

If both projects come to fruition, they would add more than 2,000 new rental suites at two sites less than a kilometre apart. Laing says he understands fears that the developments will flood the market with excess units, but adds he thinks the neighbourhood can absorb the inventory.

“It’s always a concern, but we believe in the market,” he says. “The market will obviously dictate at the time when these are launched, what is ultimately feasible and what is not. That’s why we’ve phased these projects … so that we can adjust as necessary. We’re confident that we can fill these sites.”
https://obj.ca/article/lrt-driving-factor-trinitys-planned-residential-builds-downtown-ottawa

I know they'd like this location described as a few blocks from the LRT station, but I'd have a hard time honestly describing it that way myself. You wouldn't walk to Rideau Station unless the buses were really off.
Reply With Quote
     
     
  #125  
Old Posted Nov 29, 2019, 2:31 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,793
Quote:
Originally Posted by sleye View Post
https://obj.ca/article/lrt-driving-factor-trinitys-planned-residential-builds-downtown-ottawa

I know they'd like this location described as a few blocks from the LRT station, but I'd have a hard time honestly describing it that way myself. You wouldn't walk to Rideau Station unless the buses were really off.
That works out well. The buses ARE really off!

I do agree though, this is not an LRT related development, regardless of what they say. It's quite a stretch such as the common "In the Heart of Westboro" for a condo building a kilometer outside the limits.
Reply With Quote
     
     
  #126  
Old Posted Nov 29, 2019, 4:15 PM
Arcologist Arcologist is offline
Registered User
 
Join Date: Oct 2011
Location: The Nation's Capital
Posts: 696
Quote:
Originally Posted by sleye View Post

I know they'd like this location described as a few blocks from the LRT station, but I'd have a hard time honestly describing it that way myself. You wouldn't walk to Rideau Station unless the buses were really off.
They must be anticipating a future Rideau LRT line
Reply With Quote
     
     
  #127  
Old Posted Nov 30, 2019, 2:01 PM
Glenlivet Ave's Avatar
Glenlivet Ave Glenlivet Ave is offline
Registered User
 
Join Date: Feb 2010
Location: Ottawa
Posts: 190
It's a 12 to 15 minute walk or 800m away from the Rideau Centre, so definitely walkable and I think this kind of development will make the Street more enjoyable to walk.

Talking about transit oriented development, what ever happened to the "future development site" next to Nordstrom?

Reply With Quote
     
     
  #128  
Old Posted Dec 1, 2019, 7:53 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,886
Quote:
Originally Posted by Glenlivet Ave View Post
It's a 12 to 15 minute walk or 800m away from the Rideau Centre, so definitely walkable and I think this kind of development will make the Street more enjoyable to walk.

Talking about transit oriented development, what ever happened to the "future development site" next to Nordstrom?

There have been whispers of a major hotel development for that location for eons. I imagine it will happen within the next decade or two but it's not even on paper yet. They will have to integrate the historical building on the site.
Reply With Quote
     
     
  #129  
Old Posted Feb 12, 2020, 8:02 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
Rideau x Chapel 2020-02-12
Reply With Quote
     
     
  #130  
Old Posted Mar 6, 2020, 11:27 AM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
Rideau x Chapel 2020-03-05
Reply With Quote
     
     
  #131  
Old Posted May 3, 2020, 3:48 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
2020 May 3 update:


Reply With Quote
     
     
  #132  
Old Posted May 22, 2020, 7:16 PM
BlueJay's Avatar
BlueJay BlueJay is offline
Bulid Up, Not Out
 
Join Date: Aug 2009
Location: Ottawa
Posts: 391
Tower crane is going up today.
Reply With Quote
     
     
  #133  
Old Posted Jun 24, 2020, 2:41 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
2020 june 21
Reply With Quote
     
     
  #134  
Old Posted Jul 8, 2020, 6:28 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
2020 july 08
Reply With Quote
     
     
  #135  
Old Posted Jul 8, 2020, 7:06 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,793
Thanks for posting. That is huge.
Reply With Quote
     
     
  #136  
Old Posted Jul 25, 2020, 8:33 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
2020 july 25


Reply With Quote
     
     
  #137  
Old Posted Aug 15, 2020, 4:17 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,793
From November 2019. I split the article in two since it covers Chapel and Bayview (with foot notes on Gladstone and Richmond).

Quote:
Trinity begins building its huge Ottawa development pipeline

Don Wilcox
Renx Nov. 21, 2019


Trinity Development Group has been laying the groundwork for years to develop several major residential-focused projects in Ottawa. The company and its partners hope they are now about to start reaping the rewards of a 2,700-apartment pipeline in the National Capital.



Trinity and joint venture partner Timbercreek formally broke ground this week on Rideau and Chapel, a two-tower, purpose-built rental apartment development at the eastern edge of Ottawa’s Central Business District. The first tower in the two-phase project contains 315 units and is scheduled to begin occupancy in 2022.

“This project is unique because of the process that we’ve gone through and the twists and turns it has taken,” Trinity’s senior vice-president of development and planning Mathew Laing told RENX.

“Breaking it into two phases was a really big thing for us . . . honing in on one building and getting that right. Hopefully, we do really well on it and then that carries us into Phase II.”

The two 25-storey towers will also contain about 9,500 square feet of ground-floor retail and commercial space, as well as 477 parking spaces, almost all underground. The second tower will contain 318 units and be built behind the first tower, which fronts onto Rideau Street, one of the city’s main downtown thoroughfares.

History of Rideau and Chapel

As Laing noted, Rideau and Chapel has an extended pre-development history. Originally conceived six years ago with a retail and commercial podium anchored by a large grocer, the project was approved by the then-Ontario Municipal Board but did not proceed due to slow market conditions. It has since gone through multiple revisions.

“With the removal of the grocer, we were able to phase the development,” Laing said. “We have a clear-cut line to build Phase I now, and build Phase II when market conditions are right.”

Situated a few hundred metres from one of Ottawa’s new downtown LRT stations, Rideau and Chapel is in an established neighbourhood with no significant rental or condo builds in recent years. Trinity and Timbercreek hope to attract residents from several demographics – students, new residents, young professionals and older couples looking to downsize, to name a few.

“This is definitely an area that is underserved by the type of product that we are bringing forward,” Laing said. “With Ottawa now being over a million people, and more people moving into the city, a) there are new people looking for places to live, but b) there is (also) a circular market where people will tend to go to the newest thing.”

The addition of Timbercreek as a partner in the project stems from the two firms’ joint venture in purchasing the Main and Main portfolio of properties and development sites early in 2018.

“That was our first deal together. We formed a really good relationship with them and it just evolved from there,” Laing said.

Both have long track records in Ottawa and know the market well. “It was just natural progression that we do this project together,” Laing added. “It’s rental, it fits within their portfolio, it’s a great kickoff project.”

**SNIP**
https://renx.ca/trinity-begins-building-its-huge-ottawa-development-pipeline/
Reply With Quote
     
     
  #138  
Old Posted Aug 15, 2020, 1:46 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
2020 august 15




Reply With Quote
     
     
  #139  
Old Posted Sep 12, 2020, 8:02 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
2020 September 12




Reply With Quote
     
     
  #140  
Old Posted Nov 14, 2020, 9:04 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
2020 November 14
A lot cables...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 10:48 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.