  #2201  
Old Posted Nov 6, 2020, 2:51 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by J.OT13 View Post
Quick question on the Stadler FLIRT for anyone who might know. I know it's an electric train with a diesel generator (the "Power Pack") and could one day run on catenaries. Would it be possible to run it as a dual mode? For example, if we moved Dow's Lake station under Carling and built the new Civic Hospital over the trench, could the FLIRT run electric in the Dow's Lake tunnel and under the Civic but remain diesel along the rest of the line? Similarly, back when the old N/S line was close to reality, Carleton mused at building a student centre on top of Carleton station. Could they do that with the FLIRTs running electric for a few hundred meters?
Because the dwell times are so long at the ends of the line, I'd imagine at that point it may be easier just to convert the power packs to full battery-electric and build charging stations at Limebank, Bayview, South Keys, and Airport. Potentially also Carleton.

I don't have a proper answer to your question though.
Reply With Quote
     
     
  #2202  
Old Posted Nov 6, 2020, 2:55 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by J.OT13 View Post
Quick question on the Stadler FLIRT for anyone who might know. I know it's an electric train with a diesel generator (the "Power Pack") and could one day run on catenaries. Would it be possible to run it as a dual mode? For example, if we moved Dow's Lake station under Carling and built the new Civic Hospital over the trench, could the FLIRT run electric in the Dow's Lake tunnel and under the Civic but remain diesel along the rest of the line? Similarly, back when the old N/S line was close to reality, Carleton mused at building a student centre on top of Carleton station. Could they do that with the FLIRTs running electric for a few hundred meters?
Bi-modal versions of the FLIRT exist, but my understanding is that the train can't be in motion when switching modes, but I don't actually know how it would work.. Carleton station would need to be electrified and then the switch could happen there.

Likewise, it would need to switch somewhere North of Carling (presumably) so the entire stretch from Gladstone to Carleton would need to be electrified at a minimum.


As Multi-modal mentioned, there's also a battery-electric version of the FLIRT. With the way the Trillium Line operates, those might actually be better because they can be charged at terminal stations (via overhead lines) and then run on battery the rest of the time. The only question is how we'll they'd handle the cold..
Reply With Quote
     
     
  #2203  
Old Posted Nov 6, 2020, 2:58 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Thanks for the responses! It answers my questions, and then-some.
Reply With Quote
     
     
  #2204  
Old Posted Nov 6, 2020, 3:55 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by OCCheetos View Post
Bi-modal versions of the FLIRT exist, but my understanding is that the train can't be in motion when switching modes, but I don't actually know how it would work.. Carleton station would need to be electrified and then the switch could happen there.

Likewise, it would need to switch somewhere North of Carling (presumably) so the entire stretch from Gladstone to Carleton would need to be electrified at a minimum.


As Multi-modal mentioned, there's also a battery-electric version of the FLIRT. With the way the Trillium Line operates, those might actually be better because they can be charged at terminal stations (via overhead lines) and then run on battery the rest of the time. The only question is how we'll they'd handle the cold..
The perspective is that you aren't switching modes, you're starting and shutting down a Diesel engine. Bi-Mode works for Amtrak into GCT because the locomotive can make a station stop and fire up the engine when it's clear of the tunnel. It makes less sense on a transit line where you'd be cycling the engine on and off constantly. While you could design for it, large diesels like to start and keep running, so you would have issues cycling them constantly.

Finally, it's easy enough to run combustion vehicles through a building, the Transitway already goes under Riverside hospital. No reason a rail line would be different.
Reply With Quote
     
     
  #2205  
Old Posted Nov 6, 2020, 4:03 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by Catenary View Post
The perspective is that you aren't switching modes, you're starting and shutting down a Diesel engine. Bi-Mode works for Amtrak into GCT because the locomotive can make a station stop and fire up the engine when it's clear of the tunnel. It makes less sense on a transit line where you'd be cycling the engine on and off constantly. While you could design for it, large diesels like to start and keep running, so you would have issues cycling them constantly.

Finally, it's easy enough to run combustion vehicles through a building, the Transitway already goes under Riverside hospital. No reason a rail line would be different.
That's all true. Probably not worth the effort.
Reply With Quote
     
     
  #2206  
Old Posted Nov 6, 2020, 4:03 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
https://twitter.com/RiverWardRiley/status/1324743529701265419

Demolition of the Sawmill Creek bridge is apparently beginning today.
Reply With Quote
     
     
  #2207  
Old Posted Nov 6, 2020, 8:52 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
There is supposed to be a detour for the MUP right around where the former pedestrian crossing across the tracks used to be (at Brookfield), but according to staff (via Riley Brockington) that detour still isn't open because the lighting is incomplete.

But, apparently the MUP is still open despite the bridge overhead being disassembled. I wonder how that works.
Reply With Quote
     
     
  #2208  
Old Posted Nov 6, 2020, 9:16 PM
On Edge On Edge is offline
Registered User
 
Join Date: Oct 2012
Posts: 159
Quote:
Originally Posted by OCCheetos View Post
There is supposed to be a detour for the MUP right around where the former pedestrian crossing across the tracks used to be (at Brookfield), but according to staff (via Riley Brockington) that detour still isn't open because the lighting is incomplete.

But, apparently the MUP is still open despite the bridge overhead being disassembled. I wonder how that works.
They haven't quite started on the bridge yet, but they have moved some equipment into place. And doing caissons right at the bridge.
Reply With Quote
     
     
  #2209  
Old Posted Nov 7, 2020, 3:45 PM
TheMatth69 TheMatth69 is offline
Registered User
 
Join Date: Apr 2019
Posts: 158
Probably has been mentioned before, but are they replacing the Rideau River bridge between Carleton and Mooney's Bay station?
I'm not certain I've read anything about this
Reply With Quote
     
     
  #2210  
Old Posted Nov 7, 2020, 3:57 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by On Edge View Post
They haven't quite started on the bridge yet, but they have moved some equipment into place. And doing caissons right at the bridge.
Yeah, I biked by last night and nothing had really changed.

Quote:
Originally Posted by TheMatth69 View Post
Probably has been mentioned before, but are they replacing the Rideau River bridge between Carleton and Mooney's Bay station?
I'm not certain I've read anything about this
They aren't replacing it, but I believe they are supposed to be doing structural repair work at some point.
Reply With Quote
     
     
  #2211  
Old Posted Nov 8, 2020, 5:06 PM
sgera sgera is offline
Registered User
 
Join Date: Apr 2002
Posts: 207
Went by today - construction equipment is gone. What is left is a plastic enclosed pillar and a bunch of fencing. Looks like this was prep work for phase of lrt.
Reply With Quote
     
     
  #2212  
Old Posted Nov 9, 2020, 1:34 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
A handful of interesting renders of the Airport Station from an SNCL article on using VR to collaborate from home: https://www.snclavalin.com/en/beyond-engineering/virtual-reality-meetings-from-home

(album with full size images: https://imgur.com/a/r20XGMR)



Reply With Quote
     
     
  #2213  
Old Posted Nov 11, 2020, 4:27 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Reply With Quote
     
     
  #2214  
Old Posted Nov 11, 2020, 8:56 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
It looks like TNEXT is cleaning up the Trinity side of the pedestrian bridge. The caisson looks complete. Who knows when the pier will be poured. It looks like they're cleaning up the gravel pad, so maybe not that soon... but maybe a ground-breaking is around the corner...?

https://imgur.com/a/dRkPq8i


Reply With Quote
     
     
  #2215  
Old Posted Nov 13, 2020, 9:41 PM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 321
O-Train memo regarding milestones achieved on the O-Train Stage 1 Confederation Line and Stage 2 Confederation Line and Trillium Line extension projects in Q3 2020.

https://go.railfans.ca/q3-2020
Reply With Quote
     
     
  #2216  
Old Posted Nov 15, 2020, 3:41 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
There's a small tower crane at South Keys now. I only saw it from a distance, but I'm guessing it's a portable type with a large counterweight rather than a full foundation.
Reply With Quote
     
     
  #2217  
Old Posted Nov 16, 2020, 3:41 AM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
On Saturday I was on my way back to the inner city from Riverside South, and decided to a tour of the Trillium Line construction. My phone was dead though, so no pictures. Here is a brief summary:
  • Limebank Station: Lots of work still to be completed here. The embankment on the west side of Limebank Road looks complete, but very unfinished. Lots of caissons/columns but only a couple pier caps (if I remember correctly) and no girders.
  • Earl Armstrong Station to Hunt Club Road: No station construction but all the rail over road overpasses are structurally complete with pier caps and girders. Still working on some of the substantial embankments.
  • Hunt Club Road:Caisson drilling is underway.
  • South Keys Station:As noted by Catenary, there is now a small tower crane setup with a counterweight.
  • Walkley Station:Not much going on.
  • Via Rail, Transitway, and Sawmill Creek Overpass:They look to be staging equipment for Sawmill Creek bridge demolition. The Brookfield pathway is closed and detoured.
  • Airport Station: They are getting close to completing the major structural work for the approach to Airport Station. It looks quite impressive - I wish I could have gotten a picture. Several girder spans are in place with only a couple remaining to bridge Paul Benoit Driveway. The embankment on the east side of Paul Benoit Driveway is complete.
Reply With Quote
     
     
  #2218  
Old Posted Nov 16, 2020, 4:56 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
From the Q3 memo, it seems like all station construction is pending design approvals from the city. Plenty of guideway work happening all along the corridor though! (obviously)

Walkley seems like the odd one out since almost nothing has been done on that site yet other than rail removal, but I suppose it is one of the simplest stations to build. No rock blasting required, just some pile driving (eventually) and then a basic elevator and platform setup.
Reply With Quote
     
     
  #2219  
Old Posted Nov 16, 2020, 5:26 PM
Baybreeze12 Baybreeze12 is offline
Registered User
 
Join Date: Aug 2018
Posts: 48
Is anyone else wondering if the September 2022 opening will stick? That leaves 22ish months of work. In that time:
  • Stations need to go from drawing board to finished and accepted without major deficiencies
  • The new Walkley yard will need to be sufficiently finished in six-ish months to begin receiving trains
  • Trains need to be delivered (planned mid-2021) from Switzerland and tested/commissioned - granted this will be simpler than the electrified/STO Spirits
  • All supporting structures (flyovers, Dow's tunnel rehab) need to be finished
  • The guideway needs to be re-graded (I think?), laid and commissioned


That seems like pretty tight timing. At the rate things are going now, I'm not sure if they can manage it all. Maybe I'm just feeling pessimistic.
Reply With Quote
     
     
  #2220  
Old Posted Nov 17, 2020, 12:17 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Baybreeze12 View Post
Is anyone else wondering if the September 2022 opening will stick? That leaves 22ish months of work. In that time:
  • Stations need to go from drawing board to finished and accepted without major deficiencies
  • The new Walkley yard will need to be sufficiently finished in six-ish months to begin receiving trains
  • Trains need to be delivered (planned mid-2021) from Switzerland and tested/commissioned - granted this will be simpler than the electrified/STO Spirits
  • All supporting structures (flyovers, Dow's tunnel rehab) need to be finished
  • The guideway needs to be re-graded (I think?), laid and commissioned


That seems like pretty tight timing. At the rate things are going now, I'm not sure if they can manage it all. Maybe I'm just feeling pessimistic.
It's probably good to be pessimistic, but they don't seem off schedule. The trillium line stations aren't very elaborate and shouldn't take more than a few months to build. The biggest piece of work really is the elevated guideway to the airport which seems on track. If memory serves they have to complete all the work on the airport lands by next May, so that will be a good indicator of progress. At South keys at least, if you go up close they seem to be starting foundation work of the station itself. I think it and airport station will be the first ones completed.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:07 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.