Quote:
Originally Posted by LRTeverywhere View Post
I'm sorry if I'm out of the loop this is the first I'm hearing of this overpass, I knew they would be going over the via line but I didn't realize they were building new bridges, are they double tracking this portion aswell?
This is the same overpass over the VIA line, but in order to gain the elevation needed to fly over the line it needs to start basically at the end of the Brookfield passing track, and therefore requiring the demolition of the old bridges over the creek and Transitway.

The flyover will be built for a single track.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:06 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.