Photos from Sep 13
Looks like the balcony frosted glass dividers are up now. Also, the waterfall display has red paint or something. Wonder what that is.
Outer paint looks completed now too.
There's also a pile of material in front of the waterfall display. Could that be the glass doors for the 1-bedrooms that was missing during the walk-throughs?