  #7081  
Old Posted Oct 20, 2020, 6:39 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,944
^^^Early morning in mid June?
Reply With Quote
     
     
  #7082  
Old Posted Oct 20, 2020, 7:49 PM
Winnipeg Grump's Avatar
Winnipeg Grump Winnipeg Grump is offline
Registered User
 
Join Date: Nov 2015
Location: Winnipeg
Posts: 710
Freshly laid pavers on a concrete base bouncing around loose while they work to get the other lane done.

Reply With Quote
     
     
  #7083  
Old Posted Oct 20, 2020, 7:59 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,681
Construction for Wawanesa has an anticipated start date of January 4th 2021 with a completion date of July 2023 which is also the expected completion date for Sutton Place.
Reply With Quote
     
     
  #7084  
Old Posted Oct 20, 2020, 8:00 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Looks like —. The asphalt patches in the paving stones is also hilarious.
Reply With Quote
     
     
  #7085  
Old Posted Oct 20, 2020, 8:00 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Jan. 4th coming up real quick.
Reply With Quote
     
     
  #7086  
Old Posted Oct 20, 2020, 8:44 PM
plrh plrh is offline
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 948
Pavers for Graham is the worst material you could use there. It's gotta be 11" of concrete. Tint it and stamp it if you want. Save the pavers for sidewalk accents.
Reply With Quote
     
     
  #7087  
Old Posted Oct 20, 2020, 9:08 PM
Winnipeg Grump's Avatar
Winnipeg Grump Winnipeg Grump is offline
Registered User
 
Join Date: Nov 2015
Location: Winnipeg
Posts: 710
Quote:
Originally Posted by Wpg_Guy View Post
Construction for Wawanesa has an anticipated start date of January 4th 2021 with a completion date of July 2023 which is also the expected completion date for Sutton Place.
Be kinda wild seeing three cranes at the same time along that stretch of Carlton.
Reply With Quote
     
     
  #7088  
Old Posted Oct 20, 2020, 9:19 PM
BAKGUY BAKGUY is offline
Registered User
 
Join Date: Oct 2014
Posts: 1,432
Quote:
Originally Posted by esquire View Post
TNS II ranks #9 on the diagram, so if Wawanesa is taller than it has to be at least in 9th place. The question is whether it will be tall enough to surpass MTS Place and CMHR to jump up to 7th. Just eyeballing it, I would have to imagine it will exceed MTS Place which is (again, according to the diagram) as tall as TNS II. But it isn't clear whether it will hit the 100 m height of CMHR.

But that said, this is just going by the diagrams and I'm not sure how accurate that information is. According to the thread title, TNS II is 86.9 m but the diagram puts it between the 94 m Fort Garry Place and the 96 m MTS Place.

Man, it's been a long time since I've had a good discussion like this about heights and rankings
Same here.
I love to see the once in a blue moon race for top 10 in the city. lol.
I have always been fascinated by skyscrapers and architecture.
I do still appreciate older buildings with nice detailing as well.
Reply With Quote
     
     
  #7089  
Old Posted Oct 20, 2020, 10:52 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Maybe Wawanesa has 2 cranes with the size of the building.

Remind me again, the ballet residence has relocated into TNS?
Reply With Quote
     
     
  #7090  
Old Posted Oct 20, 2020, 11:49 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,681
Quote:
Originally Posted by bomberjet View Post
Maybe Wawanesa has 2 cranes with the size of the building.

Remind me again, the ballet residence has relocated into TNS?
They will be, and a new residence will be constructed where the open air parkade is at the RWB building on Edmonton.
Reply With Quote
     
     
  #7091  
Old Posted Oct 21, 2020, 12:35 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,382
Thanks. If construction is to start in January (Ie: demolition), they need to be moving now.
Reply With Quote
     
     
  #7092  
Old Posted Oct 21, 2020, 1:41 AM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
Quote:
Originally Posted by bomberjet View Post
Maybe Wawanesa has 2 cranes with the size of the building.

Remind me again, the ballet residence has relocated into TNS?
I imagine with seeing how much 300 Main is being held up by only having one crane, Wawa will have two.


Side note, I was mistaken a while back when I said Skip was taking up the commercial in 223 Carlton, they are taking 95,000 sqft in 242 Hargrave. Their getting pretty close to being done construction, but move-in date is up in the air due to COVID.
Reply With Quote
     
     
  #7093  
Old Posted Oct 21, 2020, 12:03 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by Wpg_Guy View Post
They will be, and a new residence will be constructed where the open air parkade is at the RWB building on Edmonton.
Is the residence going over top of the parkade, or is the parkade coming down to make way for a new build? It looks at first glance as though the parkade was designed to be built over top of, but it isn't clear to me.

If the parkade gets demolished, will the RWB replace the parking spaces? With all the activity going on around there, I would think the parking situation is going to be a lot tighter in a few years, and staff with parking spaces won't be thrilled about having to give them up. Although who knows, with the effects of covid it's possible that demand for parking could be depressed for years to come...
Reply With Quote
     
     
  #7094  
Old Posted Oct 21, 2020, 12:58 PM
Winnipeg Grump's Avatar
Winnipeg Grump Winnipeg Grump is offline
Registered User
 
Join Date: Nov 2015
Location: Winnipeg
Posts: 710
Quote:
Originally Posted by bomberjet View Post
Thanks. If construction is to start in January (Ie: demolition), they need to be moving now.
Don't know if they're 'all' in TNS 2 but I know at least some of them are.

When the weather was nicer, groups of them would gather around the plaza staircase and do stretching, and you'll see them going in/out of the building carrying their outfits.
Reply With Quote
     
     
  #7095  
Old Posted Oct 21, 2020, 1:04 PM
Winnipeg Grump's Avatar
Winnipeg Grump Winnipeg Grump is offline
Registered User
 
Join Date: Nov 2015
Location: Winnipeg
Posts: 710
Quote:
Originally Posted by buzzg View Post
I imagine with seeing how much 300 Main is being held up by only having one crane, Wawa will have two.


Side note, I was mistaken a while back when I said Skip was taking up the commercial in 223 Carlton, they are taking 95,000 sqft in 242 Hargrave. Their getting pretty close to being done construction, but move-in date is up in the air due to COVID.
Skip has floors 5 - 8 at 242 Hargrave and the move-in date had been early December. What I hear is that they're slowing down the construction schedule as they're in no rush to bring all of those staff into the building right now.

Ceridian staff (3rd floor) are all remote now.
Reply With Quote
     
     
  #7096  
Old Posted Oct 21, 2020, 1:29 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Have there been any changes at the TNS food hall? I hear it's dead in there. I would imagine sales must be way, way off the projected amounts.
Reply With Quote
     
     
  #7097  
Old Posted Oct 21, 2020, 1:47 PM
GreyGarden GreyGarden is offline
Registered User
 
Join Date: Mar 2017
Posts: 761
I have no idea what the numbers are so this is purely anecdotal but I work nearby and will drop into the food hall for a coffee or food occasionally. I wouldn't say its dead. Its socially distanced so the size of the space makes it feel kind of dead but I'd say theres always a healthy amount of people eating/drinking there. But nothing like pre-covid, so obviously I suspect their sales are way lower than what they were hoping for.
Reply With Quote
     
     
  #7098  
Old Posted Oct 21, 2020, 1:57 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,944
My guess is Wawanesa will only require 1 crane. The building is fairly small (footprint)...I actually think that 2 cranes wouldn't fit. The majority of high rises get built with 1 crane. It is all about scheduling.
Reply With Quote
     
     
  #7099  
Old Posted Oct 21, 2020, 4:15 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
Quote:
Originally Posted by Winnipeg Grump View Post
Skip has floors 5 - 8 at 242 Hargrave and the move-in date had been early December. What I hear is that they're slowing down the construction schedule as they're in no rush to bring all of those staff into the building right now.
They haven't pursposely slowed down, I was in there yesterday. Occupancy is Nov 1 and the move-in date is still Dec 1 – and they're well on track for that – but they're pretty much operating under the assumption they aren't going in til January at earliest. They've just not making the decision official til November in case restrictions ease before then.

Quote:
Originally Posted by esquire View Post
Have there been any changes at the TNS food hall? I hear it's dead in there. I would imagine sales must be way, way off the projected amounts.
Quote:
Originally Posted by GreyGarden View Post
I have no idea what the numbers are so this is purely anecdotal but I work nearby and will drop into the food hall for a coffee or food occasionally. I wouldn't say its dead. Its socially distanced so the size of the space makes it feel kind of dead but I'd say theres always a healthy amount of people eating/drinking there. But nothing like pre-covid, so obviously I suspect their sales are way lower than what they were hoping for.
I was there Monday at 11am and we were one of 3 tables. I was there for dinner 2 weeks ago on a Tuesday and we were the only table not in Gusto.

They are getting obliterated. "Luckily" for them, TN is a partner in the overall operations so they can manage rent better, and the 3rd-party vendors' rent is strictly based on sales for the first 2 or 3 years, so they're OK as well.
Reply With Quote
     
     
  #7100  
Old Posted Oct 21, 2020, 4:28 PM
GreyGarden GreyGarden is offline
Registered User
 
Join Date: Mar 2017
Posts: 761
Ouch, that's brutal ^. I've typically been in only during the 12-1 hour. But now that I think of it, the time I went in the evening (around 5-6) I was probably one of the only people.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:07 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.