Quote:
Originally Posted by Klazu
Thanks for posting! I also wish the tallest tower would be the first phase, but I will be happy to have a 45-floor tower go up here. It will be truly transformational for this corner of Metrotown.
I wonder how nobody has mentioned the 400-meter running track around the podium roof which is a first for Metro Vancouver. I think it is quite pointless, though, as Metrotown has plenty of tracks and side streets to run on and is perfectly safe even after dark.
|
I think they're all the same phase (Phase I) and will be constructed together if I had to bet.
It's just that based on schedules and the tower heights themselves, the central one will be completed first and way ahead of the taller one which is 20 floors taller and will take more weeks to complete.
At least that's what a shared podium like that suggests.
Why the shortest one will not be completed first, I don't really know.
If anything, that's the one that's being delayed or put off (based on what scheduling might suggest) - but then again that might also be according to scheduling plan because if they started constructing the tower stems at the same time (assuming the completion of the podium), the shortest tower would be completed way way ahead of the other two and I don't imagine they want to have it completed possibly several weeks or months earlier while the other two still have a ton time left to complete.
Ideally you'd like to have all three completed at roughly the same time space as each other since I imagine they'll be shared amenity facilities on that podium that all three towers might need access to.
I don't believe they'll have any trouble at all selling out the tallest tower (especially as the tallest tower in Metrovan when it completes) so really no urgency in that regard to get it completed early.