Quote:
Originally Posted by SteveD
Based on the diamond pattern on the left hand side I think the floor being framed right now will be the top floor. Renderings show three full diamonds and that floor is the one that's needed to fit in the third one.
|
Think we’ve got a few more than that. The floor worked on is 3/8 out of the top “X”. Think we have 2-3 additional floors to go, then the additional for the crown bracing.
X (25-32)
X (17-24)
X (9-16)
v (5-8)
(0-4 or 1-3 depending on your perspective, where 0 is on the NW corner and nonexistent on the SW corner)