  #2221  
Old Posted Oct 5, 2020, 1:05 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Reply With Quote
     
     
  #2222  
Old Posted Oct 10, 2020, 2:46 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,890
Has there ever been any discussion about covering the trench from Bayview to the Parkway? It was open topped because diesel buses were running on it but all the hard work for a cut and cover tunnel is already done now that electric trains will be running on it. It would make a lovely linear park and would eliminate a hard barrier in several neighbourhoods. It would also help to keep the ice and snow off the tracks in the section that is hardest to clear.
Reply With Quote
     
     
  #2223  
Old Posted Oct 10, 2020, 12:22 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by Harley613 View Post
Has there ever been any discussion about covering the trench from Bayview to the Parkway? It was open topped because diesel buses were running on it but all the hard work for a cut and cover tunnel is already done now that electric trains will be running on it. It would make a lovely linear park and would eliminate a hard barrier in several neighbourhoods. It would also help to keep the ice and snow off the tracks in the section that is hardest to clear.
I fully agree with you, but no, there haven't been any discussions. With all of the new towers going up along Parkdale and Scott, covering the trench to add much needed green space seems like an easy win.
Reply With Quote
     
     
  #2224  
Old Posted Oct 13, 2020, 1:16 PM
ottawa881 ottawa881 is offline
Registered User
 
Join Date: Dec 2019
Posts: 1
I fully agree as well, perhaps we could lobby Jeff Leiper and some of the local politicians on a Highline Style park

https://www.thehighline.org/history/



Quote:
Originally Posted by Harley613 View Post
Has there ever been any discussion about covering the trench from Bayview to the Parkway? It was open topped because diesel buses were running on it but all the hard work for a cut and cover tunnel is already done now that electric trains will be running on it. It would make a lovely linear park and would eliminate a hard barrier in several neighbourhoods. It would also help to keep the ice and snow off the tracks in the section that is hardest to clear.
Reply With Quote
     
     
  #2225  
Old Posted Oct 13, 2020, 4:10 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Harley613 View Post
Has there ever been any discussion about covering the trench from Bayview to the Parkway? It was open topped because diesel buses were running on it but all the hard work for a cut and cover tunnel is already done now that electric trains will be running on it. It would make a lovely linear park and would eliminate a hard barrier in several neighbourhoods. It would also help to keep the ice and snow off the tracks in the section that is hardest to clear.
To keep it within the bounds of Stage 2, it could certainly be done west of Tunnies. One issue from a cost perspective is that the transitway trench is quite a bit wider than what is being dug for the O-Train, and covering that wider trench would be considerably more expensive (the longer the cross supports, the stronger they need to be, so the cost does not increase linearly).

East of Tunnies the trench only extends for a few hundred meters until about Stirling Ave (after that it comes to the surface and crosses above Bayview Station Rd. With bridges at Holland, Parkdale, Hinchey, and Carruthers, the benefit for covering the trench east of Tunnies is reduced.
Reply With Quote
     
     
  #2226  
Old Posted Oct 13, 2020, 5:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
I would prioritize covering the trench between Kichi Sibi station and Lanark Avenue, where most of the new towers are u/c or proposed. That's about a kilometer.

I would encourage the City to work with the Feds to cover the trench in front of Tunney's Pasture as it seems like a logical step that could be linked with the broader redevelopment and better connect with the community to the south. This is 850 meters.

If noise continues to be an issue for high-rise residents between Parkdale and Stirling, then we might have to cover that stretch as well. The fact that we already have a few streets going over might make that stretch a bit cheaper to complete. It' also only 300 meters.

Lanark to Northwestern could be the final phase, at 660 meters.

The three stations would have to remain open air to avoid expensive ventilation.
Reply With Quote
     
     
  #2227  
Old Posted Oct 13, 2020, 8:41 PM
passwordisnt123 passwordisnt123 is offline
Registered User
 
Join Date: Mar 2015
Location: Ottawa (Centretown)
Posts: 643
Quote:
Originally Posted by Harley613 View Post
Has there ever been any discussion about covering the trench from Bayview to the Parkway? It was open topped because diesel buses were running on it but all the hard work for a cut and cover tunnel is already done now that electric trains will be running on it. It would make a lovely linear park and would eliminate a hard barrier in several neighbourhoods. It would also help to keep the ice and snow off the tracks in the section that is hardest to clear.
There's never been any discussion so far as I know for two reasons: (1) the people in that area are poor and thus don't deserve nice things in Watson's Ottawa; and two: (2) the people in that area don't donate to Watson's re-election campaign.

It's the same reason Westboroites get the full buried treatment yet on the East end, Jasmine Crescent doesn't even get a stop even though it's 3km between Blair station and Montreal station.
Reply With Quote
     
     
  #2228  
Old Posted Oct 14, 2020, 12:35 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
The first closure of the Transitway for Stage 2 is happening today.

The segment between Lincoln Fields and Iris is being closed. Buses will be detoured via Woodroffe and Carling.

https://www.octranspo.com/en/alerts/#alerts-35467
Reply With Quote
     
     
  #2229  
Old Posted Oct 14, 2020, 1:24 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
The first closure of the Transitway for Stage 2 is happening today.

The segment between Lincoln Fields and Iris is being closed. Buses will be detoured via Woodroffe and Carling.

https://www.octranspo.com/en/alerts/#alerts-35467
Strange they are closing it in the fall. How much work do the expect to get done in the winter? Seems to be a case of maximum inconvenience for minimum gain.
Reply With Quote
     
     
  #2230  
Old Posted Oct 14, 2020, 1:35 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Quote:
Originally Posted by roger1818 View Post
Strange they are closing it in the fall. How much work do the expect to get done in the winter? Seems to be a case of maximum inconvenience for minimum gain.
It appears to just be a single overnight closure.
Reply With Quote
     
     
  #2231  
Old Posted Oct 14, 2020, 1:36 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by bradnixon View Post
It appears to just be a single overnight closure.
Ahh. That makes more sense then.
Reply With Quote
     
     
  #2232  
Old Posted Oct 14, 2020, 1:38 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by roger1818 View Post
Strange they are closing it in the fall. How much work do the expect to get done in the winter? Seems to be a case of maximum inconvenience for minimum gain.
The detour is only happening for a single night (Oct 14th at 10:00 PM to Oct 15th at 5:00 AM). Its probably needed to make some reconfiguration of the Iris/Transitway intersection as construction continues. I'm sure after October 15th the buses will be moved back onto the Transitway.

*Edit - bradnixon beat me to it.
Reply With Quote
     
     
  #2233  
Old Posted Oct 14, 2020, 4:07 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Ah, I hadn't noticed it was only a night. Makes more sense now!
Reply With Quote
     
     
  #2234  
Old Posted Oct 16, 2020, 8:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Images of the Lincoln Fields flyover posted on Watson's Twitter. The aerial is outdated, taken sometime in summer, but the other were probably taken a few days apart this month.






https://twitter.com/JimWatsonOttawa/status/1317188426907721728
Reply With Quote
     
     
  #2235  
Old Posted Nov 5, 2020, 1:42 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Reply With Quote
     
     
  #2236  
Old Posted Nov 9, 2020, 5:43 AM
TheMatth69 TheMatth69 is offline
Registered User
 
Join Date: Apr 2019
Posts: 158
Asking myself what will happen to the structure and overall entirety of Queensway station ? Is it going to become Ottawa's "ghost station" or will it be entirely dismantled (concrete structures included).

Last edited by TheMatth69; Nov 10, 2020 at 12:19 AM.
Reply With Quote
     
     
  #2237  
Old Posted Nov 9, 2020, 3:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
My money is on full demolition.
Reply With Quote
     
     
  #2238  
Old Posted Nov 9, 2020, 7:59 PM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
Quote:
Originally Posted by J.OT13 View Post
My money is on full demolition.
Shame. It's currently a good interchange for the 101/103 and transitway.
Reply With Quote
     
     
  #2239  
Old Posted Nov 9, 2020, 8:20 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by Gat-Train View Post
Shame. It's currently a good interchange for the 101/103 and transitway.
What areas did those routes serve?

I imagine Lincoln Fields will take over that role.
Reply With Quote
     
     
  #2240  
Old Posted Nov 9, 2020, 8:58 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by J.OT13 View Post
What areas did those routes serve?

I imagine Lincoln Fields will take over that role.
It was a cross-town route that started at Moodie (approximately) and traveled along the 417, then down Carling eventually making its way adjacent to the 417 to Lees, and now as the 55 it continues to Elmvale.

You're right that Lincoln Fields will take over because the 55 is the future Carling LRT, er.. for the most part that is.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:49 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.