How do you spend hundreds of millions and cheap out on this.
Reply With Quote
     
     
  #242  
Old Posted Oct 6, 2020, 2:52 PM
montydawg montydawg is offline
Registered User
 
Join Date: May 2016
Location: NYC
Posts: 911
Quote:
Originally Posted by shivtim View Post
Wait - that gap is for a bioswale? And then with the powerlines the sidewalk on the left becomes completely un-usable?
That is not a bioswale- they just haven't put any landscaping there yet. There is no way for water to enter, and it isn't deep enough. In looking at the utility pole, the electric service has already been moved off, so it is just telephone and maybe cable at this point. The fact they have the sidewalk abruptly ending tells me they anticipate that pole being removed, and they are waiting on AT&T to get in there and bury their lines. AT&T always waits until the power has been removed, and from my observation, they always take way longer to remove the wires. I think you will see that pole gone once the building opens....
Reply With Quote
     
     
  #243  
Old Posted Oct 6, 2020, 2:53 PM
NYbyWAYofGA's Avatar
NYbyWAYofGA NYbyWAYofGA is offline
Registered User
 
Join Date: Nov 2010
Location: NYC
Posts: 693
Quote:
Originally Posted by atlHawks View Post
How do you spend hundreds of millions and cheap out on this.
Classic Atl negligence and oversight...smdh.
Reply With Quote
     
     
  #244  
Old Posted Oct 6, 2020, 3:58 PM
Martinman Martinman is offline
Registered User
 
Join Date: Jul 2015
Posts: 1,641
It was reported that the Interlock would fund the complete street plan for Howell Mill around the project. I don't know where the bioswale talk is coming from.

Quote:
“So we are removing all the power poles,” Garrison said. “We are integrating these large sidewalks. We’re creating these pedestrian crossings. We are timing the signals.”

Garrison added, “Renew Atlanta has really set the stage for a complete streets project that is going to transform Howell Mill from colliers down to Marietta and we are trying to fit in to that and also create there vision here on the corner.”
Reply With Quote
     
     
  #245  
Old Posted Oct 6, 2020, 10:02 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,813
Quote:
Say goodbye to those big old power lines. Our team is burying the existing power lines to improve the line of sight in the corridor.

https://www.instagram.com/p/CGBD6foJXGk/
Reply With Quote
     
     
  #246  
Old Posted Oct 6, 2020, 11:09 PM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Quote:
Originally Posted by Martinman View Post
It was reported that the Interlock would fund the complete street plan for Howell Mill around the project. I don't know where the bioswale talk is coming from.
I used my eyes and compared the long rectangular gap with bioswales implemented elsewhere. I’d rather see functional bioswales and protection from the street instead of something split in the sidewalk, similar to the following:


As I’m not sure anyone feels comfortable on the small sliver of sidewalk near a busy street, I’d rather push the greenery and additional function to capture stormwater runoff adjacent the street

Reply With Quote
     
     
  #247  
Old Posted Oct 7, 2020, 12:48 AM
atlHawks atlHawks is offline
Registered User
 
Join Date: Apr 2019
Posts: 454
Quote:
Originally Posted by smArTaLlone View Post
That's right, they saw my comment and took action.
Reply With Quote
     
     
  #248  
Old Posted Oct 7, 2020, 12:52 AM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Quote:
Originally Posted by atlHawks View Post
That's right, they saw my comment and took action.
Keep up the great work!!
Reply With Quote
     
     
  #249  
Old Posted Oct 7, 2020, 1:19 PM
Martinman Martinman is offline
Registered User
 
Join Date: Jul 2015
Posts: 1,641
Quote:
Originally Posted by Street Advocate View Post
I used my eyes and compared the long rectangular gap with bioswales implemented elsewhere. I’d rather see functional bioswales and protection from the street instead of something split in the sidewalk, similar to the following:
Did you not notice the fire hydrant that would sit squarely in center of the new sidewalk? I assume the gap is because of utility work that still had to be done at the time of the photo. The Howell Mill complete street plan to my knowledge, does not include bioswales.
Reply With Quote
     
     
  #250  
Old Posted Oct 7, 2020, 2:52 PM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Quote:
Originally Posted by Martinman View Post
Did you not notice the fire hydrant that would sit squarely in center of the new sidewalk? I assume the gap is because of utility work that still had to be done at the time of the photo. The Howell Mill complete street plan to my knowledge, does not include bioswales.
Do you have a site plan or engineering drawings of either? Without either, speculation on what it is and constructive criticism of what it could be is generally what makes a city better.
Reply With Quote
     
     
  #251  
Old Posted Oct 7, 2020, 8:41 PM
atlHawks atlHawks is offline
Registered User
 
Join Date: Apr 2019
Posts: 454
Echo Street West’s First Known Tenant, Guardian Works, Unveiled


Quote:
Novare Events is bringing Guardian Works to Echo Street West, the first-known tenant for the now-under-construction mixed-use development, according to the company’s website. Comprising a 6,000-square-foot indoor reception space, an almost 5,000-square-foot covered patio area, with an additional 23,000-square-foot green space, the Guardian Works venue can comfortably accommodate up to 1,500 guests and can be configured for virtually any event.

With site restoration underway, Guardian Works is scheduled for completion in the Spring of 2021, along with a few other community activations, like an artist and makers colony, more outdoor gathering areas, and an open-air bar and dining experience just off the BeltLine.


This project seems to be MOVING. Exciting times for the Bankhead/English Avenue if you have been bullish on this area.
Reply With Quote
     
     
  #252  
Old Posted Oct 7, 2020, 11:24 PM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Seems like they will have some amazing outdoor spaces over there.
Reply With Quote
     
     
  #253  
Old Posted Oct 10, 2020, 6:59 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,813
8 West, Interlock, 788 West Midtown, Star Metals

Reply With Quote
     
     
  #254  
Old Posted Oct 10, 2020, 7:12 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,813
Reply With Quote
     
     
  #255  
Old Posted Oct 10, 2020, 7:45 PM
PhunkyPho PhunkyPho is offline
Registered User
 
Join Date: Jun 2017
Location: Atlanta-ish
Posts: 333
Quote:
Originally Posted by smArTaLlone View Post
Wow! Those skyline views!
Reply With Quote
     
     
  #256  
Old Posted Oct 12, 2020, 3:41 PM
Martinman Martinman is offline
Registered User
 
Join Date: Jul 2015
Posts: 1,641
Those views are impressive.
Reply With Quote
     
     
  #257  
Old Posted Oct 13, 2020, 2:45 AM
atlHawks atlHawks is offline
Registered User
 
Join Date: Apr 2019
Posts: 454
Investment firm Brookfield partners on 300-unit townhome development near Bellwood Quarry


Quote:
Brookfield Holdings LLC bought into the 24-acre project, which is being built at 1615 Johnson Road, for $17.5 million, according to Fulton County property deeds.

Brookfield will partner with homebuilder Ashton Woods on the new development known as ParkVue. It will include 293 townhomes.

When the project was presented to the city last year, the developer estimated units could cost up to $600,000, but Ashton Woods' Mike Busher said pricing has not been established yet.
Good to see this moving forward after Brock tried to stop them.
Reply With Quote
     
     
  #258  
Old Posted Oct 13, 2020, 3:59 PM
Martinman Martinman is offline
Registered User
 
Join Date: Jul 2015
Posts: 1,641
Unfortunately this will likely be another development in subdivision form.
Reply With Quote
     
     
  #259  
Old Posted Oct 13, 2020, 5:46 PM
NYbyWAYofGA's Avatar
NYbyWAYofGA NYbyWAYofGA is offline
Registered User
 
Join Date: Nov 2010
Location: NYC
Posts: 693
Quote:
Originally Posted by Martinman View Post
Unfortunately this will likely be another development in subdivision form.
Hopefully not gated.....
Reply With Quote
     
     
  #260  
Old Posted Oct 13, 2020, 7:42 PM
atlHawks atlHawks is offline
Registered User
 
Join Date: Apr 2019
Posts: 454
Quote:
Originally Posted by NYbyWAYofGA View Post
Hopefully not gated.....
I don't think you can gate a subdivision inside city limits. I was told this by one of Brocks builders and I'm pretty sure Brock would of have done that with a few of his.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta
Forum Jump



Forum Jump


All times are GMT. The time now is 1:04 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.