HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture


    The St. Regis Chicago in the SkyscraperPage Database

• Building Data Page   • Comparison Diagram   • Chicago Skyscraper Diagram

• Map Location
• Chicago Projects & Construction Forum

Reply

 
Thread Tools Display Modes
     
     
  #7481  
Old Posted Sep 19, 2020, 3:51 PM
chris08876's Avatar
chris08876 chris08876 is online now
 
Join Date: Jul 2013
Posts: 49,410
Reply With Quote
     
     
  #7482  
Old Posted Sep 20, 2020, 3:36 AM
SIGSEGV's Avatar
SIGSEGV SIGSEGV is offline
 
Join Date: Jun 2018
Posts: 6,686
Crain's has a bit of a bearish take here (well no —, there's a — global pandemic...)
https://www.chicagobusiness.com/resident...ings-success-then-things-got-complicated
Reply With Quote
     
     
  #7483  
Old Posted Sep 20, 2020, 1:59 PM
sentinel's Avatar
sentinel sentinel is online now
 
Join Date: Oct 2004
Posts: 4,821
Edit.
Reply With Quote
     
     
  #7484  
Old Posted Sep 21, 2020, 12:29 AM
kolchak's Avatar
kolchak kolchak is offline
 
Join Date: Mar 2008
Posts: 880
I took these a couple of days ago. Sorry for the poor quality. Are they really finished with the mechanical coverings? Looked unfinished to me - like brackets for additional panels. I know this has been discussed but seeing the vents/mechanical floor coverings in person for the first time in a while makes me think they are not finished. I also noticed these strange metal panels covering certain curtain wall sections. Are these temporary?

Is it possible that the glass delivery is again behind schedule? The NW corner of the building's glass installation is totally stalled - no work recently as far as I can tell maybe a couple of weeks or more.

Sure looks spectacular from below - her best profile





Reply With Quote
     
     
  #7485  
Old Posted Sep 21, 2020, 2:56 PM
ivi237 ivi237 is offline
 
Join Date: Feb 2019
Posts: 19
Quote:
Originally Posted by kolchak View Post
I took these a couple of days ago. Sorry for the poor quality. Are they really finished with the mechanical coverings? Looked unfinished to me - like brackets for additional panels. I know this has been discussed but seeing the vents/mechanical floor coverings in person for the first time in a while makes me think they are not finished. I also noticed these strange metal panels covering certain curtain wall sections. Are these temporary?

Is it possible that the glass delivery is again behind schedule? The NW corner of the building's glass installation is totally stalled - no work recently as far as I can tell maybe a couple of weeks or more.

Sure looks spectacular from below - her best profile
NW glass install is not stalled anymore. You can see the progress in the last few weeks through the webcam images. They are installing glass from the bottom up.

https://public.earthcam.net/vista/vista_tower/lake_point_tower_view/view_1
Reply With Quote
     
     
  #7486  
Old Posted Sep 21, 2020, 4:08 PM
ardecila's Avatar
ardecila ardecila is offline
 
Join Date: Jun 2006
Posts: 17,006
Quote:
Originally Posted by the urban politician View Post
^ Wow, this looks stunning--a stylish entry to an urban cave. I hope they do a good job with the lighting.

I look forward, some day, to a walk from the LSE park to the Riverwalk through this. Definitely a huge plus that building this was a part of the program.

For all of you people dissing Vista as some sort of failure by the developer, sure everything isn't perfect but Vista is a HUGE boost to this area. Not only for the tower and the (eventual) restaurant with that kick — multi-story restaurant/viewing space that will be very popular in the post-Covid world, but also the infrastructure improvements. The north south road and pedestrian connections are a substantial upgrade to the cityscape.
Oh, so they didn't go with a mirrored material as suggested in renderings. Probably a good change IMO, the mirrored would have sucked more light into the "cave" but would look really chintzy and be difficult to clean. There is a slight sheen to the final material though, not sure if this is fiber cement with a glossy finish or if it's truly metallic like an Apple Store.

Agreed that the infrastructure in this project is key. Not only does it provide a dignified connection from the Riverwalk to LSE Park but it also finally completes the upper level road "loop" with a link from Upper Wacker to Harbor Drive, and provides a finished cap on the raw stump of Upper Wacker left over from the S-curve project in the 80s. IIRC there is even some public plaza space and a fountain at the end of that Upper Wacker deck. Nice place to sit and enjoy the urban canyon.
Reply With Quote
     
     
  #7487  
Old Posted Sep 21, 2020, 4:11 PM
Skyguy_7 Skyguy_7 is offline
 
Join Date: Dec 2012
Posts: 2,657
Quote:
Originally Posted by kolchak View Post

She really must tower over you from this vantage point. What a unique design with the round paneling. Gotta love a lady with curves!

EDIT: I am mesmerized by the tower in this photo. I came back to the thread and can't stop staring at it. So much detail!

Last edited by Skyguy_7; Sep 21, 2020 at 7:20 PM.
Reply With Quote
     
     
  #7488  
Old Posted Sep 21, 2020, 6:35 PM
kolchak's Avatar
kolchak kolchak is offline
 
Join Date: Mar 2008
Posts: 880
Quote:
Originally Posted by ivi237 View Post
NW glass install is not stalled anymore. You can see the progress in the last few weeks through the webcam images. They are installing glass from the bottom up.

https://public.earthcam.net/vista/vista_tower/lake_point_tower_view/view_1
Well I don't know how I missed that but its good news. I guess we're stuck with the vent panels as is then. Sure look unfinished, though..
Reply With Quote
     
     
  #7489  
Old Posted Sep 21, 2020, 9:41 PM
harryc's Avatar
harryc harryc is offline
 
Join Date: Jun 2007
Posts: 14,941
Sept 21

Reply With Quote
     
     
  #7490  
Old Posted Sep 21, 2020, 9:50 PM
Chi-Sky21 Chi-Sky21 is offline
 
Join Date: Jul 2013
Posts: 1,357
Now THAT is an awesome shot.
Reply With Quote
     
     
  #7491  
Old Posted Sep 21, 2020, 11:29 PM
Bill_Ding Bill_Ding is offline
 
Join Date: Mar 2020
Posts: 27
The black mechanical louvers are complete. There are no plans to do anything else with them.
Reply With Quote
     
     
  #7492  
Old Posted Sep 22, 2020, 7:55 AM
Marshal Marshal is offline
 
Join Date: Dec 2015
Posts: 1,493
Turning out great. The overall form is way more elegant than I thought it was going to be.
Reply With Quote
     
     
  #7493  
Old Posted Sep 22, 2020, 12:19 PM
kolchak's Avatar
kolchak kolchak is offline
 
Join Date: Mar 2008
Posts: 880
Quote:
Originally Posted by Bill_Ding View Post
The black mechanical louvers are complete. There are no plans to do anything else with them.
Perhaps since you seem to have the knowledge, you can help me understand - why are the vent coverings so deeply recessed?
Reply With Quote
     
     
  #7494  
Old Posted Sep 22, 2020, 2:14 PM
harryc's Avatar
harryc harryc is offline
 
Join Date: Jun 2007
Posts: 14,941
Sept 22

from Oak Park
Reply With Quote
     
     
  #7495  
Old Posted Sep 22, 2020, 6:31 PM
Darude_Sandstorm Darude_Sandstorm is offline
 
Join Date: Feb 2020
Posts: 52
Quote:
Originally Posted by SIGSEGV View Post
Crain's has a bit of a bearish take here (well no —, there's a — global pandemic...)
https://www.chicagobusiness.com/resident...ings-success-then-things-got-complicated
I can't read it. Does it mention the louvers? Blaim Kamin somehow didn't mention them in his piece about the building.
Reply With Quote
     
     
  #7496  
Old Posted Sep 22, 2020, 7:28 PM
Skyguy_7 Skyguy_7 is offline
 
Join Date: Dec 2012
Posts: 2,657
^ No. But they did mention a "design flaw" in the headline, which got me wondering what could be this new issue...

I read through the article to find a single sentence on the flaw, better known as the blow-through. Crains just deceptively trying to sell papers.
Reply With Quote
     
     
  #7497  
Old Posted Sep 23, 2020, 9:18 PM
Darude_Sandstorm Darude_Sandstorm is offline
 
Join Date: Feb 2020
Posts: 52
Quote:
Originally Posted by Skyguy_7 View Post
^ No. But they did mention a "design flaw" in the headline, which got me wondering what could be this new issue...

I read through the article to find a single sentence on the flaw, better known as the blow-through. Crains just deceptively trying to sell papers.
Baited by Crain's again. I think the louvers are far and away the real design flaw. The blow-thru doesn't necessarily break the building. The louvers absolutely do. The louvers are what tourists will say "are they still constructing this building?" about.
Reply With Quote
     
     
  #7498  
Old Posted Sep 23, 2020, 11:11 PM
KWillChicago's Avatar
KWillChicago KWillChicago is offline
 
Join Date: Mar 2015
Posts: 1,146
Amazing train shot harry.
Reply With Quote
     
     
  #7499  
Old Posted Sep 25, 2020, 2:59 AM
bhawk66 bhawk66 is offline
 
Join Date: Mar 2019
Posts: 553
deleted

Last edited by bhawk66; Sep 25, 2020 at 4:13 PM.
Reply With Quote
     
     
  #7500  
Old Posted Sep 28, 2020, 10:55 PM
PittsburghPA PittsburghPA is offline
 
Join Date: Jun 2012
Posts: 948
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
   
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 6:48 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.