HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #161  
Old Posted Aug 17, 2020, 5:46 PM
CanadaGoose CanadaGoose is offline
Registered User
 
Join Date: Sep 2014
Posts: 260
Quote:
Originally Posted by OTownandDown View Post
I still have a problem with the logic of keeping the bridge 4-lanes of car traffic, when the 'before' and 'after' in both directions is cut down to just two lanes. Yes, during rush hour there's 4 lanes on Montreal Road, but most of the time only two lanes are available. Would reducing the bridge to 2 lanes *really* create a pinch point that would shut down traffic?

At locations where left and right turns are needed, expand the traffic lanes. Otherwise why do we need 4 lanes?
It’s only the eastbound lanes getting used to get on Sussex Dr heavily.

I don’t think anyone would care if the westbound lanes between Sussex to Mackenzie Ave was reduced.

But that section needs a complete revision to get rid of the dangerous bike situation, the awful underpass, etc etc.
Reply With Quote
     
     
  #162  
Old Posted Aug 17, 2020, 8:48 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by CyrusKafaiwu View Post
It’s only the eastbound lanes getting used to get on Sussex Dr heavily.

I don’t think anyone would care if the westbound lanes between Sussex to Mackenzie Ave was reduced.

But that section needs a complete revision to get rid of the dangerous bike situation, the awful underpass, etc etc.
I think the previous comment was referring to Cummings Bridge.

But yes, the Colonel By-Sussex-Rideau-Wellington-Mackenzie intersections could use some work. The Rideau cycle track will now stop a block short of the Mackenzie cycle track, and the NCC has plans for Wellington. It's just a question of what gets done when and in what order.
Reply With Quote
     
     
  #163  
Old Posted Aug 18, 2020, 12:58 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,636
Quote:
Originally Posted by Catenary View Post
I think the previous comment was referring to Cummings Bridge.

But yes, the Colonel By-Sussex-Rideau-Wellington-Mackenzie intersections could use some work. The Rideau cycle track will now stop a block short of the Mackenzie cycle track, and the NCC has plans for Wellington. It's just a question of what gets done when and in what order.
You raise a good point as well. Picture my commute from Montreal Road to Portage: If I'm on my bike, coming west and up the Cummings bridge (after just barely losing my life in the right hand lanes at the top of the bridge where the bike lane ends), I'm probably going to say 'screw it' (or something worse) and continue down hill on Rideau, because the parking lane provides some width for me to continue, and the hill looks nice and enticing (compared to the stop-and-go nature of Sandy Hill residential streets, which is a huge PITA). When I reach King Eddy, I'm likely not going to jaunt around and around, crossing Rideau twice, just to continue westward. There's just no efficiency in it. And efficiency when biking is king. (Same thing happens when I bike towards an intersection where a bike path meets a signalized corner. The City puts up 'walk your bike' signs when the intersection hasn't been designed for cyclists. You think I actually come to a stop, dismount, and friggin walk? F*ck no. lol Neither does anyone else!)

moving on...

Continuing West, after the single block of nice new in-front-of-the-rideau-centre-only bikeway, I find myself in the curb lane ascending Wellington and trying not to get crushed (thankfully, with less STO buses), and perhaps even up on the bumpy granite sidewalk outside of tourist hours. Upon cresting the hill in front of parliament, trying not to get flattened by buses, I find myself again in a protected bike lane for the much-easier downhill and over the bridge, with a fully protected bike lane.

Would it be so hard to just say that every street that crosses the river and/or canal should have east-west bikeway priority?
Reply With Quote
     
     
  #164  
Old Posted Aug 18, 2020, 3:06 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,606
Quote:
Originally Posted by OTownandDown View Post
You raise a good point as well. Picture my commute from Montreal Road to Portage: If I'm on my bike, coming west and up the Cummings bridge (after just barely losing my life in the right hand lanes at the top of the bridge where the bike lane ends), I'm probably going to say 'screw it' (or something worse) and continue down hill on Rideau, because the parking lane provides some width for me to continue, and the hill looks nice and enticing (compared to the stop-and-go nature of Sandy Hill residential streets, which is a huge PITA). When I reach King Eddy, I'm likely not going to jaunt around and around, crossing Rideau twice, just to continue westward. There's just no efficiency in it. And efficiency when biking is king. (Same thing happens when I bike towards an intersection where a bike path meets a signalized corner. The City puts up 'walk your bike' signs when the intersection hasn't been designed for cyclists. You think I actually come to a stop, dismount, and friggin walk? F*ck no. lol Neither does anyone else!)

moving on...

Continuing West, after the single block of nice new in-front-of-the-rideau-centre-only bikeway, I find myself in the curb lane ascending Wellington and trying not to get crushed (thankfully, with less STO buses), and perhaps even up on the bumpy granite sidewalk outside of tourist hours. Upon cresting the hill in front of parliament, trying not to get flattened by buses, I find myself again in a protected bike lane for the much-easier downhill and over the bridge, with a fully protected bike lane.

Would it be so hard to just say that every street that crosses the river and/or canal should have east-west bikeway priority?
Point taken about going down Rideau. Personally, I'd probably duck into the slower, safer streets and stick to the bike lane after Cumberland, but no doubt lots of cyclists will take the direct route. That's a concern.

In fairness, Wellington will have a protected lane from Sussex west. The real question is whether they will do something about that single block from Rideau and Sussex to the N-S lane that ends at Mackenzie and Wellington. It seems crazy not to complete that link right away, rather than pouring cyclists into that massive intersection.
Reply With Quote
     
     
  #165  
Old Posted Sep 12, 2020, 7:53 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
Rideau Street 2020 september 12


Reply With Quote
     
     
  #166  
Old Posted Sep 12, 2020, 8:00 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
The trees are gonna be a nice touch.
Reply With Quote
     
     
  #167  
Old Posted Sep 13, 2020, 12:37 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Thanks for providing regular updates!

Looking forward to the finished product. It will be a huge improvement over the last 30 years of neglect.
Reply With Quote
     
     
  #168  
Old Posted Sep 13, 2020, 2:21 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 29,105
What's the timeline to finish this?
Reply With Quote
     
     
  #169  
Old Posted Sep 13, 2020, 8:51 PM
Brannwagon Brannwagon is offline
Registered User
 
Join Date: Nov 2019
Location: Ottawa, ON
Posts: 103
Quote:
Originally Posted by Truenorth00 View Post
What's the timeline to finish this?
Per the City’s website:

Quote:
Project timeline

- Construction on Rideau Street from Dalhousie Street to Sussex Drive commenced in April 2020 and the majority of the work is expected to be completed by the end of 2020. Rideau Street will reopen to traffic, transit and cyclists by the end of 2020.
- Construction on William Street will commence in September 2020 and the majority of the work expected to be completed in December 2020.
- Surface course asphalt and minor landscaping work will be performed in spring 2021.
Reply With Quote
     
     
  #170  
Old Posted Sep 18, 2020, 2:50 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Reply With Quote
     
     
  #171  
Old Posted Sep 18, 2020, 3:36 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,091
Quote:
Originally Posted by kevinbottawa View Post
The trees are gonna be a nice touch.
They'll be an even nice touch if, unlike most urban trees planted in Ottawa street rebuilds, they aren't murdered by our salt addiction within a year or two.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #172  
Old Posted Sep 18, 2020, 3:42 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,250
Quote:
Originally Posted by Uhuniau View Post
They'll be an even nice touch if, unlike most urban trees planted in Ottawa street rebuilds, they aren't murdered by our salt addiction within a year or two.
The vandals will take care of them long before that kills them off.
Reply With Quote
     
     
  #173  
Old Posted Sep 18, 2020, 3:43 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Quote:
Originally Posted by Uhuniau View Post
They'll be an even nice touch if, unlike most urban trees planted in Ottawa street rebuilds, they aren't murdered by our salt addiction within a year or two.
They seem further away from the street than most trees usually are.

I hope these trees get proper protection cages (not like the flimsy-🞵🞵🞵 🞵🞵🞵🞵 ones on Queen).
Reply With Quote
     
     
  #174  
Old Posted Sep 23, 2020, 12:19 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,091
Quote:
Originally Posted by J.OT13 View Post
They seem further away from the street than most trees usually are.

I hope these trees get proper protection cages (not like the flimsy-🞵🞵🞵 🞵🞵🞵🞵 ones on Queen).
The sidewalks get oversalted, too.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #175  
Old Posted Sep 23, 2020, 12:21 AM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by Uhuniau View Post
The sidewalks get oversalted, too.
Especially transit stops...
Reply With Quote
     
     
  #176  
Old Posted Sep 23, 2020, 1:49 AM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,394
I've got no hope for the trees. They are doomed.
At least until they change their winter maintenance standards.
Reply With Quote
     
     
  #177  
Old Posted Sep 23, 2020, 4:53 PM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
Why the heck couldn't they have done this renewal project at the same time as building the Confederation Line? They had it all ripped up then.
Reply With Quote
     
     
  #178  
Old Posted Sep 24, 2020, 3:40 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by Gat-Train View Post
Why the heck couldn't they have done this renewal project at the same time as building the Confederation Line? They had it all ripped up then.
This is the project to clean up after the Confederation Line construction. It was supposed to be done last year, but things got pushed back too far and it got bumped.
Reply With Quote
     
     
  #179  
Old Posted Sep 24, 2020, 5:22 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 29,105
Why the heck can't they speed this up? That's my question.

6 months should be plenty. Shouldn't need 8 months.

I'm watching them build a path from to Cyrville Station from Aviation and Ogilvie. Just vegetation to remove and soilwork. They did that over a month ago. And since then they have managed to lay down just 10% of the concrete pavement. Easily go a week without any activity at the site. I don't get this.
Reply With Quote
     
     
  #180  
Old Posted Sep 24, 2020, 5:32 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Quote:
Originally Posted by Truenorth00 View Post
Why the heck can't they speed this up? That's my question.

6 months should be plenty. Shouldn't need 8 months.

I'm watching them build a path from to Cyrville Station from Aviation and Ogilvie. Just vegetation to remove and soilwork. They did that over a month ago. And since then they have managed to lay down just 10% of the concrete pavement. Easily go a week without any activity at the site. I don't get this.
I can't speak to Rideau (though it seems like they've done quite a bit since April; remember there was underground work and watermain work completed by RTG as well).

But I see similar slow progress with pathway construction in my neighbourhood as a number of small pathways were dug up and re-built. (I'm talking several weeks to rebuild a 100m pathway). My only explanation for the slow process is the contractor is moving their resources amongst all the various projects they have on the go.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.