Quote:
Originally Posted by Migrant_Coconut
That's why it's a bad idea in most of Metro Van: you're spending near-SkyTrain levels of money to get RapidBus levels of service... and you're losing the buses' flexibility. On-road trains are in an unfortunate "master of nothing" position in most of North America.
Key word, "underground." Or over-ground. Vancouver was built for 1-car trams going at 20 km/h... and horse carriages. Times have changed, and so have the streets.
Worth noting is that Link Light Rail is lagging behind SkyTrain in terms of ridership, even with Seattle's generous grade separation.
Could've been quantified better, but just because you can run a 4-car surface train on Broadway doesn't mean you should. It'd be a very tight squeeze even when it clears the intersections.
|
At this point, I think I agree with you. I've been reading and re-reading various documents and capacity constraints within the entire transit system. Some points:
1. r4 41 rapidbus will obtain 4400 pphpd. That seems like a good test bed for the 99 to become a rapid bus and achieve more or less the same and that will buy a lot of time for the eventual build out of the skytrain.
2. From council meeting minutes, it is obvious that the skytrain to ubc is not a regional priority anymore. This is because they mention that funding must come from the municipal level (aka not regional priority). Since UBC has tonnes of land and the university is in the black because of land management, maybe this will be the case. If they don't use federal funds, they don't have to worry about rentals and can build all the condos they want. For federal funding, I'm guessing you have to have latent demand already, which is clearly not the case for the UBC skytrain.
3. It's clear from the CP rail sale, that COV lost that battle. It's also clear that it will be a streetcar with a one car train travelling slowly at 8 minute headways into downtown.
4. The first phase of the streetcar from Arbutus to Main St Science world may come before the UBC skytrain. It's between a local bus and and rapid transit. So, on it's own it won't have the development potential and is more like medium density or missing middle build out. However from Arbutus to Main, it will beat the 99 b-line ridership (both directions) and will alleviate the most congested part of the system (stadium-chinatown to commercial) and connect all three rapid transit lines
5. The Jan 2019 document on UBC rapid transit study is a sham of assumptions, but translink is not answerable to anyone and can never be legally punished (and suprisingly I find people commenting my exact same sentiments throughout the web about how translink can continuously create documents with different assumptions and not have to legally worry about it). However, it appears to me that due to #2 that anything but RapidBus is off the table. Meaning that COV is stable and predictable and it's more about politics (see point #3), but do I share the regions vision?
::Having said all that, it seems that the eventual answer is Rapid Bus from Arbutus for now, but I'm guessing it will be Skytrain in the future (but RapidBus buys a lot of time and planning for whatever technology is chosen and it will likely be underground and rapid).
So, even if the process seems political, I think the answer is right. RapidBus from Arbutus come 2025, and a streetcar type service for the corridor (high frequency, low capacity, low speed) in the future. It's right because we should follow demand and not create it. It's a risk that is unnecessary. The eventual build out of the lands has not occurred in UBC and there should be a long planning process for integrate transportation and land use and funding. I like streetcars and I think having a european slow moving one down the corridor and into downtown is the right approach for the city and I'm glad it was forced into it by CP. It seems safer and more manageable for the city.
What will be interesting is the capacity of the Arbutus Corridor from Milton Parcel to Arbutus station. They can run really long trains if they want as they are not constrained by street crossing. They can get large capacity, moving very slowly, if they wanted to. Initially it will be a one car train I suspect.
Because of point #3, I don't think the arbutus corridor will convert to rapid transit for a very long time.
In terms of Broadway becoming a great street, I think they will make it look more like greektown and have some very high buildings (28 stories is not the cap). Especially between Laurel to Cambie. Downtown goes up the broadway and between Main and Granville (the Urban Core that is part of downtown), so it comes over the bridges now. Broadway will change in the Central part of it and quite a bit.
Having said all that, I'm happy with where I think the city is going. It seems to make sense. I share the vision. I guess we will see parts of this vision mid next year. I think what will be interesting is how translink eventually becomes a player in the development field. How this pans out for Vancouver compared to the global asian context will be interesting.
It's interesting that they are choosing a streetcar type of service for the corridor all the way to Milton Parcel. It can still be high volume. Just make it an 8 car train that moves slow. You have the space for that.