Quote:
Originally Posted by Hybrid247 View Post

If the Sparks tunnel gets built, I wonder if it would be possible to eventually extend Trillium line eastward to interline with the Gatineau LRT in the downtown core.

It is possible, as long as the bridge decision isn't final.
Reply With Quote
     
     
  #902  
Old Posted Sep 7, 2020, 1:36 AM
Hybrid247 Hybrid247 is offline
Registered User
 
Join Date: Oct 2009
Posts: 1,320
Quote:
Originally Posted by corynv View Post
I'd highly doubt that, you'd either need to build the downtown stations with multiple platforms (low ones for STO high ones for Trillium), buy trains with multi-level doors (i'd imagine this wouldn't go to well with accessibility requirements) or completely rebuild the trillium line to go low-floor.
Ya, I should've clarified that it would certainly necessitate a switch to low-floor rolling stock on T-line. It's kind of too bad they didn't consider doing that as part of the current Stage 2 plans.
Reply With Quote
     
     
  #903  
Old Posted Sep 7, 2020, 2:12 AM
The Conductor The Conductor is offline
BANNED
 
Join Date: May 2016
Location: On The Tracks
Posts: 230
Quote:
Originally Posted by Gat-Train View Post
Trams on Wellington would be nice, but would be interrupted by all the protests, parades and ambassador motorcades. Underground means more reliability, also shelter from the elements.
So let's focus on the subway tunnel instead of this tram talk!

Love your avatar by the way!
Reply With Quote
     
     
  #904  
Old Posted Sep 7, 2020, 2:13 AM
The Conductor The Conductor is offline
BANNED
 
Join Date: May 2016
Location: On The Tracks
Posts: 230
Quote:
Originally Posted by caboose View Post
It is possible, as long as the bridge decision isn't final.
That would be exciting!
Reply With Quote
     
     
  #905  
Old Posted Sep 7, 2020, 2:38 AM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
Quote:
Originally Posted by The Conductor View Post
That would be exciting!
As a Gatineau resident, I would insist that this connection doesn't happen until the Trillium Line is at least partially electrified. It wouldn't be ok running diesel trains in our city, especially behind residential neighbourhoods nearby to the alignment.
Reply With Quote
     
     
  #906  
Old Posted Sep 7, 2020, 2:53 AM
The Conductor The Conductor is offline
BANNED
 
Join Date: May 2016
Location: On The Tracks
Posts: 230
Quote:
Originally Posted by caboose View Post
As a Gatineau resident, I would insist that this connection doesn't happen until the Trillium Line is at least partially electrified. It wouldn't be ok running diesel trains in our city, especially behind residential neighbourhoods nearby to the alignment.
I agree - big oil has had its way too long. We need it double track and electric
Reply With Quote
     
     
  #907  
Old Posted Sep 7, 2020, 2:56 AM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
Quote:
Originally Posted by The Conductor View Post
I agree - big oil has had its way too long. We need it double track and electric
Diesel is worse that gasoline. On a recent trip to London, I had asthma attacks because of all the diesel cars. Keep that crap out of my city please!
Reply With Quote
     
     
  #908  
Old Posted Sep 7, 2020, 12:37 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,934
Quote:
Originally Posted by Hybrid247 View Post
Ya, I should've clarified that it would certainly necessitate a switch to low-floor rolling stock on T-line. It's kind of too bad they didn't consider doing that as part of the current Stage 2 plans.
Why would they have done that?

There's never been any plan to interline. So it's extra capital costs for no justifiable reason.

Last edited by Truenorth00; Sep 7, 2020 at 2:01 PM.
Reply With Quote
     
     
  #909  
Old Posted Sep 7, 2020, 1:18 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by passwordisnt123 View Post
I don't mind the Sparks Street tunnel to be honest.

If they do a very shallow cut and cover, this will constrain the STO tunnel to stay in centretown since it can't cross the canal, which is a good thing. This provides an opportunity down the road for the STO tunnel to eventually extend either south at Bank street (if it can negotiate a sharp turn there) into something that resembles this forum's beloved Bank Street Subway or it could be extended across Sparks to Elgin and then south for pretty much as far as the imagination can take you. City Hall? Pretoria Bridge? Lansdowne? Carling O-train station via Queen Elizabeth Drive?

Since the Confederation Line and Trilium Line are more suburban oriented, I find it ironic that one of the best chances we may get at good, high-quality urban transportation in Ottawa might come about because of STO.
The STO's Sparks tunnel will never become part of the Bank Subway for several reasons:

Jurisdictional reasons: the STO would never build and operate a subway under Bank Street. Their #1 goal is to serve the residents of Gatienau.

Capacity: the STO tram is a, well, tram for most of its route in Gatineau. That means limited length of trains, and limited capacity, which would make tunneling beyond and using the rolling stock as a tradition subway would make little sense. The best we can hope for is a loop back to Gatineau using the Alexandra Bridge.

Logistics: with the Gatineau tram tunnel being under Sparks, the tunnel would have to turn nearly 90 degrees, pass under several deep foundation buildings and over the Confederation Line. It would be extremely expensive to somehow build a new tunnel between office building parking garages and the Confederation Line (if there's even enough space).

Quote:
Originally Posted by The Conductor View Post
So let's focus on the subway tunnel instead of this tram talk!

Love your avatar by the way!
This is the West Gatineau LRT Project. The West Gatineau LRT is a tram.

Please take the fantasy Bank Street Subway discussion to the Fantasy Bank Street Subway thread.
Reply With Quote
     
     
  #910  
Old Posted Sep 7, 2020, 1:34 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by Truenorth00 View Post
Why would they have done that?

There's never been any plan to interline. So it's extra capital costs for video justifiable reason.
There's no plan, but they've definitely left protections to ensure that it's possible should they ever go ahead with that terrible idea.
Reply With Quote
     
     
  #911  
Old Posted Sep 7, 2020, 2:03 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,934
Quote:
Originally Posted by OCCheetos View Post
There's no plan, but they've definitely left protections to ensure that it's possible should they ever go ahead with that terrible idea.
Protections don't cost much. Just planning.

Tearing down and rebuilding platforms on the other hand. That has a cost.
Reply With Quote
     
     
  #912  
Old Posted Sep 7, 2020, 2:03 PM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
Quote:
Originally Posted by J.OT13 View Post
The STO's Sparks tunnel will never become part of the Bank Subway for several reasons:

Capacity: the STO tram is a, well, tram for most of its route in Gatineau. That means limited length of trains, and limited capacity, which would make tunneling beyond and using the rolling stock as a tradition subway would make little sense. The best we can hope for is a loop back to Gatineau using the Alexandra Bridge.

Logistics: with the Gatineau tram tunnel being under Sparks, the tunnel would have to turn nearly 90 degrees, pass under several deep foundation buildings and over the Confederation Line. It would be extremely expensive to somehow build a new tunnel between office building parking garages and the Confederation Line (if there's even enough space).
Agreed, they are two separate projects. One is proposed, one is fantasy. And a turn of 90 degrees is not feasible. I don't think the loop back will ever happen. I think that there is no chance that any tunnelling beyond the end of Sparks Street will ever be feasible or even accepted by Ottawa. I'm still really surprised that Ottawa is accepting any kind of tunnelling or on street streetcars from Gatineau.

I would argue that the feds should cover the parts in downtown Ottawa and downtown Gatineau. Interprovincial traffic goes both ways.
Reply With Quote
     
     
  #913  
Old Posted Sep 7, 2020, 2:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by caboose View Post
Agreed, they are two separate projects. One is proposed, one is fantasy. And a turn of 90 degrees is not feasible. I don't think the loop back will ever happen. I think that there is no chance that any tunnelling beyond the end of Sparks Street will ever be feasible or even accepted by Ottawa. I'm still really surprised that Ottawa is accepting any kind of tunnelling or on street streetcars from Gatineau.

I would argue that the feds should cover the parts in downtown Ottawa and downtown Gatineau. Interprovincial traffic goes both ways.
The only way they could loop the line with the tunnel option would be to use the Château Laurier tunnel (which would mean demolishing the Committee Rooms) and go down the former railway RoW at the base of Major's Hill Park. Since this is all Federal and NCC land, the City would have little say. Gatineau would need to plan and build its tunnel with this possibility in mind though, which is essential to expand future capacity.

I agree that the Feds need to step-up with funding. I don't see the Province of Québec or the City of Gatineau investing a single cent into a tunnel on the Ottawa side, nor do I see the City of Ottawa investing a single cent in the project. The Feds will have to fund 100% of the Ottawa portion of this project, which is fair as they are responsible for interprovincial mobility.

At the moment, Gatineau is hoping for a 40/60 funding formula (Feds/Province) for their tramway. Only the province committed to the 60%.
Reply With Quote
     
     
  #914  
Old Posted Sep 7, 2020, 2:21 PM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
Quote:
Originally Posted by J.OT13 View Post
I agree that the Feds need to step-up with funding. I don't see the Province of Québec or the City of Gatineau investing a single cent into a tunnel on the Ottawa side, nor do I see the City of Ottawa investing a single cent in the project. The Feds will have to fund 100% of the Ottawa portion of this project, which is fair as they are responsible for interprovincial mobility.

At the moment, Gatineau is hoping for a 40/60 funding formula (Feds/Province) for their tramway. Only the province committed to the 60%.
As a Gatineau taxpayer, I'd rather Gatineau and the province spend zero on any part outside of Quebec. The main employer for interprovincial transit is the federal government, they need to pay for it.
Reply With Quote
     
     
  #915  
Old Posted Sep 7, 2020, 2:22 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by caboose View Post
As a Gatineau taxpayer, I'd rather Gatineau and the province spend zero on any part outside of Quebec. The main employer for interprovincial transit is the federal government, they need to pay for it.
Agreed.
Reply With Quote
     
     
  #916  
Old Posted Sep 7, 2020, 2:32 PM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
I don't think the crossing will ever happen either. There's an underlying hostility in Ottawa to Gatineau, that has stopped any new bridge or transit project dating back 40 years. No Deschenes Rapids Bridge. No to a third lane on Champlain Bridge. Reducing SJAM parkway to two lanes. No Kettle Island Crossing. Complaining about trucks on King Edward. Bayview Station doesn't have the capacity for Gatineau transfers. I think it's all rooted in the language divide in this country, and I don't think even the niceties of holding joint transit zoom meetings will change that...
Reply With Quote
     
     
  #917  
Old Posted Sep 7, 2020, 3:42 PM
The Conductor The Conductor is offline
BANNED
 
Join Date: May 2016
Location: On The Tracks
Posts: 230
Quote:
Originally Posted by caboose View Post
I don't think the crossing will ever happen either. There's an underlying hostility in Ottawa to Gatineau, that has stopped any new bridge or transit project dating back 40 years. No Deschenes Rapids Bridge. No to a third lane on Champlain Bridge. Reducing SJAM parkway to two lanes. No Kettle Island Crossing. Complaining about trucks on King Edward. Bayview Station doesn't have the capacity for Gatineau transfers. I think it's all rooted in the language divide in this country, and I don't think even the niceties of holding joint transit zoom meetings will change that...
A number of years ago there was serious discussion of an Aylmer to Kanata bridge crossing which I still fully support!
Reply With Quote
     
     
  #918  
Old Posted Sep 7, 2020, 4:01 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,934
Quote:
Originally Posted by J.OT13 View Post
At the moment, Gatineau is hoping for a 40/60 funding formula (Feds/Province) for their tramway. Only the province committed to the 60%.
Gatineau doesn't want to contribute anything?

Ballsy.

My hopes for this project just went down.
Reply With Quote
     
     
  #919  
Old Posted Sep 7, 2020, 4:20 PM
GradualFuture's Avatar
GradualFuture GradualFuture is offline
Registered User
 
Join Date: Jun 2020
Posts: 72
Quote:
Originally Posted by The Conductor View Post
A number of years ago there was serious discussion of an Aylmer to Kanata bridge crossing which I still fully support!
Unfortunately, the Aylmer Kanata bridge crossing is outside of any official plans outlined in the proposed Gatineau West LRT that is discussed here, and therefore would be Fantasy and should be ignored as outlined by those in charge of make believe city planning on this forum.
Reply With Quote
     
     
  #920  
Old Posted Sep 7, 2020, 4:41 PM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
Quote:
Originally Posted by GradualFuture View Post
Unfortunately, the Aylmer Kanata bridge crossing is outside of any official plans outlined in the proposed Gatineau West LRT that is discussed here, and therefore would be Fantasy and should be ignored as outlined by those in charge of make believe city planning on this forum.
There's an interprovincial bridge thread here: https://skyscraperpage.com/forum/showthread.php?p=8970829
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:13 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.