Quote:
Derek Ellis
@deellisd


I think the blasting for this station might be all done #ottLRT


https://twitter.com/deellisd/status/1294417314574737409

7:35 PM · Aug 14, 2020·Twitter for Android
https://twitter.com/deellisd/status/1294417314574737409
Reply With Quote
     
     
  #2042  
Old Posted Aug 28, 2020, 9:42 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Reply With Quote
     
     
  #2043  
Old Posted Aug 28, 2020, 10:50 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day.

A slightly more comprehensive description of the work in Dow's Lake Tunnel specifically:

Project Spotlight: Upgrades for the Dows Lake Trillium Line Tunnel

https://ottawa.ca/en/planning-developmen...-upgrades-dows-lake-trillium-line-tunnel

EnJoy!
Reply With Quote
     
     
  #2044  
Old Posted Aug 29, 2020, 12:57 PM
qprcanada qprcanada is offline
Registered User
 
Join Date: Apr 2018
Posts: 145
Quote:
Originally Posted by PHrenetic View Post
Good Day.

A slightly more comprehensive description of the work in Dow's Lake Tunnel specifically:

Project Spotlight: Upgrades for the Dows Lake Trillium Line Tunnel

https://ottawa.ca/en/planning-developmen...-upgrades-dows-lake-trillium-line-tunnel

EnJoy!
What are the two inner rails on the track for that are shown in the photo ?
Reply With Quote
     
     
  #2045  
Old Posted Aug 29, 2020, 1:07 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,113
Quote:
Originally Posted by qprcanada View Post
What are the two inner rails on the track for that are shown in the photo ?
They're guard rails: https://en.wikipedia.org/wiki/Guard_rail_(rail)
Reply With Quote
     
     
  #2046  
Old Posted Sep 1, 2020, 5:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Update video from OC Transpo.

Video Link
Reply With Quote
     
     
  #2047  
Old Posted Sep 1, 2020, 5:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
I did not realize there was a FEDCO meeting today. Presentation can be found on O-Train Fans, with plenty of images, far more for Trillium than on the video.

https://otrain.railfans.ca/news/stage-2-lrt
Reply With Quote
     
     
  #2048  
Old Posted Sep 2, 2020, 8:59 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,113
I noticed that in the PA there's an Operations Service Plan titled "Trillium Interim Substantial Completion - Bayview to Greenboro Only".

I guess they're prepared for the possibility of having to partially open the line, although tbh if any part is going to hold up the relaunch of the line it'll be the Bayview to Greenboro section.

Of note, it says that 5 trains would operate on this schedule instead of the 4 we're used to. My guess is that trains would dwell at Bayview and alternate platforms or something.


Also, no more 15 minute operations. It'll be 12 minutes at all times which means that there will be times that the Trillium Line operates more frequently than the Confederation Line. Everyone complaining about frequency can shut up now!
Reply With Quote
     
     
  #2049  
Old Posted Sep 2, 2020, 11:44 PM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
Quote:
Originally Posted by OCCheetos View Post
I noticed that in the PA there's an Operations Service Plan titled "Trillium Interim Substantial Completion - Bayview to Greenboro Only".

I guess they're prepared for the possibility of having to partially open the line, although tbh if any part is going to hold up the relaunch of the line it'll be the Bayview to Greenboro section.

Of note, it says that 5 trains would operate on this schedule instead of the 4 we're used to. My guess is that trains would dwell at Bayview and alternate platforms or something.


Also, no more 15 minute operations. It'll be 12 minutes at all times which means that there will be times that the Trillium Line operates more frequently than the Confederation Line. Everyone complaining about frequency can shut up now!
Restoring service to Carleton University as soon as possible is probably one of the biggest factors.
Reply With Quote
     
     
  #2050  
Old Posted Sep 3, 2020, 1:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
I would love to see Stage 2 Trillium operate from Bayview to Greenboro only for a few weeks/months, so we can really see the impact of the additional suburban service and airport spur.
Reply With Quote
     
     
  #2051  
Old Posted Sep 3, 2020, 1:21 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Quote:
Originally Posted by OCCheetos View Post
I noticed that in the PA there's an Operations Service Plan titled "Trillium Interim Substantial Completion - Bayview to Greenboro Only".
Thanks for sharing... what I find interesting are the preceding 4 pages which break down the Bayview-Limebank and South Keys-Airport service...

Bayview-Limebank:
Round-trip run time = 62 minutes
So, One-way run time = 31 minutes

South Keys-Airport
Round-trip run time=15 minutes
So, One-way run time = 7.5 minutes

Those numbers seem a lot more reasonable than what was indicated earlier by the Stage 2 office.
Reply With Quote
     
     
  #2052  
Old Posted Sep 3, 2020, 1:42 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Quote:
Originally Posted by bradnixon View Post
Thanks for sharing... what I find interesting are the preceding 4 pages which break down the Bayview-Limebank and South Keys-Airport service...

Bayview-Limebank:
Round-trip run time = 62 minutes
So, One-way run time = 31 minutes

South Keys-Airport
Round-trip run time=15 minutes
So, One-way run time = 7.5 minutes

Those numbers seem a lot more reasonable than what was indicated earlier by the Stage 2 office.
Here are those numbers provided by the Stage 2 office again:

Bayview-Limebank 37 mins
Bayview-South Keys 25 mins
South Keys-Airport 13 mins


Yup, the report provides far better run-times.
Reply With Quote
     
     
  #2053  
Old Posted Sep 3, 2020, 1:49 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,066
I wonder how much twinning and electrification could improve speeds in the future. These speeds basically make it a 1 hr commute from Riverside South, with the feeder bus ride. Even a small 5-6 min improvement would be impactful here.
Reply With Quote
     
     
  #2054  
Old Posted Sep 3, 2020, 8:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Quote:
Originally Posted by Truenorth00 View Post
I wonder how much twinning and electrification could improve speeds in the future. These speeds basically make it a 1 hr commute from Riverside South, with the feeder bus ride. Even a small 5-6 min improvement would be impactful here.
Not sure about electric vs diesel, but twinning would result in significant improvements with trains no longer having to wait at passing tracks for the previous train to go by.
Reply With Quote
     
     
  #2055  
Old Posted Sep 4, 2020, 12:01 AM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Quote:
Originally Posted by J.OT13 View Post
Not sure about electric vs diesel, but twinning would result in significant improvements with trains no longer having to wait at passing tracks for the previous train to go by.
Really the only place that will happen is at the Brookfield siding though...twinning Walkley station (so the trains pass each other there instead) might save a couple minutes on the round trip?
Reply With Quote
     
     
  #2056  
Old Posted Sep 4, 2020, 12:57 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,066
Electrification should normally save 10-20s per station, enough to add up to 2-3 minutes over the whole route. Added in 2-3 minutes from twinning and Bayview to Limebank could be brought down to 25 mins. Enough to make a commute from Riverside South to most of downtown Ottawa about an hour. Right now, it's easily over an hour.
Reply With Quote
     
     
  #2057  
Old Posted Sep 4, 2020, 4:03 AM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
Quote:
Originally Posted by Truenorth00 View Post
Electrification should normally save 10-20s per station, enough to add up to 2-3 minutes over the whole route. Added in 2-3 minutes from twinning and Bayview to Limebank could be brought down to 25 mins. Enough to make a commute from Riverside South to most of downtown Ottawa about an hour. Right now, it's easily over an hour.
what would be the cost of electrification of the line?
Reply With Quote
     
     
  #2058  
Old Posted Sep 4, 2020, 7:35 AM
TheMatth69 TheMatth69 is offline
Registered User
 
Join Date: Apr 2019
Posts: 158
Considering the fact that the FLIRTs are Diesel-Electric and powered by a power pack, there's virtually no difference between the performance of a FLIRT in electric mode and the ones we're going to have. Even the noise they generate when accelerating will be very similar (almost). However different story for the LINTs.
Reply With Quote
     
     
  #2059  
Old Posted Sep 4, 2020, 11:52 AM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,037
Quote:
Originally Posted by TheMatth69 View Post
Considering the fact that the FLIRTs are Diesel-Electric and powered by a power pack, there's virtually no difference between the performance of a FLIRT in electric mode and the ones we're going to have. Even the noise they generate when accelerating will be very similar (almost). However different story for the LINTs.
Right, the FLRT is an electric train powered by an onboard diesel generator and not a diesel train in the traditional sense like the LINT or Talent. That's always been my interpretation.
Reply With Quote
     
     
  #2060  
Old Posted Sep 4, 2020, 11:57 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,066
The GO train locos are diesel-electric. Their math on electrification had notable speed gains. Why would it be different in Ottawa? EMUs have more traction and accelerate quicker. This is known. The question on benefit is one of station spacing. GO benefits because stations are 5 km apart. At 2-3 km apart, the savings for Trillium won't be be more than 10-20s per stop.

Acceleration would be an ancillary benefit of electrification. Not the reason for it.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:35 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.