  #2821  
Old Posted Jun 29, 2020, 2:47 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
The main issue with Bishop Grandin altogether is the proximity of the hydro lines.

At River Road the hydro line is down the centre. So they'd have to push Bishop over top of River, while keeping adequate distance away from the hydro lines. Should be able to figure something out that works.

Maybe raise Bishop a bit and run River Rd underneath. Either way it'd have to be a condensed diamond, with retaining walls between the mainline and the off ramps, specifically on the south side.
     
     
  #2822  
Old Posted Jun 29, 2020, 3:27 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
For now they should just close off the River Rd crossing, make it RIRO on both sides, and add in those centre median U-Turn merge lanes that we have some other places for people wanting to go left.
     
     
  #2823  
Old Posted Jun 30, 2020, 12:04 AM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,174
Quote:
Originally Posted by buzzg View Post
For now they should just close off the River Rd crossing, make it RIRO on both sides, and add in those centre median U-Turn merge lanes that we have some other places for people wanting to go left.
Exactly, add the median U turn that was there during construction for north bound to west bound flow. South bound to east bound can go through the existing Pembina/Bishop intersection. Close Bishop at River to through traffic. Quick and affordable fix.
     
     
  #2824  
Old Posted Jun 30, 2020, 3:46 AM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
There's actually one already there just east of River, so it'd be so easy to do this. It's all already there, just close the intersection.

https://www.google.ca/maps/@49.8240388,-97.137542,540m/data=!3m1!1e3
     
     
  #2825  
Old Posted Jun 30, 2020, 3:58 AM
Andy6's Avatar
Andy6 Andy6 is online now
Starring as himself
 
Join Date: Mar 2002
Location: Toronto Yorkville
Posts: 9,762
My guess is that that would cause a lot of accidents. Slow-moving traffic edging into the roadway and then immediately having to slip over into the right-hand lane, likely slowing down if traffic is too heavy, to wait for a chance to move over (otherwise you're stuck going across the bridge and taking a roundabout 10-minute drive back to give it another try).

The current setup is a minor annoyance but not worth worrying about in my opinion. It really does need a grade separation, ideally, but it's hard to see why it would be a priority.
__________________
crispy crunchy light and snappy
     
     
  #2826  
Old Posted Jun 30, 2020, 12:06 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
I think the existing intersection is acceptable, it could just use some adjustments to get more cars through on River's green light sequences. As things stand, not many cars can turn left from River to Bishop Grandin (either direction) on a single green light during busier hours, which leads to backups.
     
     
  #2827  
Old Posted Jun 30, 2020, 2:08 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,174
Quote:
Originally Posted by Andy6 View Post
The current setup is a minor annoyance but not worth worrying about in my opinion. It really does need a grade separation, ideally, but it's hard to see why it would be a priority.
Just as low volume, low access roads on the south Perimeter need to be closed so will some access points on the ring road network if we truly ever want that to happen. The easiest one of those to close is River Rd at Bishop. It has reasonable, low cost alternatives and could have a significant stretch of free flowing road from Scurfield to St Marys with the addition of a single grade separation at Waverly. That is exactly the sort of major win the ring road needs to get traction and the combined improvements at Waverly, River and St Marys and the Perimeter would put pressure on grade separation for Bishop@ St Marys/Dakota.

Speaking on that intersection, I still think the solution is to raise the through lanes with access roads running along side at ground level. So through traffic is raised over both Dakota and St Marys. If you want to access either road you take a single exit to an access road that still have lights at both intersections. Yes not an ideal solution but it places the emphasis on the part that needs to most improvement -- through traffic on Bishop, while acknowledging that upgrades to the other routes would have localized impacts at best.
     
     
  #2828  
Old Posted Jun 30, 2020, 2:15 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
^ That would be a perfect solution IMO for St. Mary's and Dakota... basically two diamonds fused together.

As for River, a flyover could work but I think that can only happen in conjunction with an interchange at St. Mary's and Dakota as the increased traffic loads from closing access at River would really strain those intersections as they are now.
     
     
  #2829  
Old Posted Jun 30, 2020, 3:22 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,174
^^^ It isn't "close River" but convert it to right in, right out with a planned uturn in the median for left turns. It is a much cheaper solution than any grade separation and the volume of traffic on River doesn't really warrant grade separation. Also the wider than average medians have the space to support this design and further it was even used during repairs to the bridge when exactly what I am suggesting was the status quo.
     
     
  #2830  
Old Posted Jun 30, 2020, 3:42 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
We talked about having Dakota and St. Mary's as a combined interchange previously. And someone, maybe Biff, mentioned that is/was the plan. But nothing is really out there in the public. It would basically be a long diamond with access to Bishop east of Dakota and west of St. Mary's. With a connected road in between running parallel to both sides of Bishop.
     
     
  #2831  
Old Posted Jun 30, 2020, 5:52 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,881
^^^Yes the conceptual design for that interchange (St Mary's/Dakota) is exactly as you said - an elongated diamond.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
     
     
  #2832  
Old Posted Jul 3, 2020, 1:29 AM
dam_well's Avatar
dam_well dam_well is offline
Registered User
 
Join Date: Dec 2019
Posts: 105










Interpretive Centre renos are starting up at FortWhyte.
The Buffalo Crossing part of the project is apparently being redesigned which is probably a good thing based on the renders.
__________________
Selling one parachute
Used once
Never opened
Small stain
     
     
  #2833  
Old Posted Jul 3, 2020, 3:30 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
That looks much better than the original renderings that were released.
     
     
  #2834  
Old Posted Jul 3, 2020, 8:13 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
The City is reviewing the michigan left turn on Bishop at River.
http://clkapps.winnipeg.ca/DMIS/permalink.asp?id=A20200707(RM)PW-49
     
     
  #2835  
Old Posted Jul 3, 2020, 8:27 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
Quote:
Originally Posted by bomberjet View Post
The City is reviewing the michigan left turn on Bishop at River.
http://clkapps.winnipeg.ca/DMIS/permalink.asp?id=A20200707(RM)PW-49
Interesting though that it doesn't mention anything about enhancing it in order to close of the intersection. Doesn't talk about the intersection at all.
     
     
  #2836  
Old Posted Jul 3, 2020, 9:05 PM
borkborkbork's Avatar
borkborkbork borkborkbork is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,711
Thank god they got rid of the green hardie board monstrosity they had planned, glad to see the recladding will use materials that are a bit more of a fit with the building
     
     
  #2837  
Old Posted Jul 4, 2020, 2:37 AM
Spocket's Avatar
Spocket Spocket is offline
Back from the dead
 
Join Date: Feb 2006
Location: Edmonton
Posts: 3,616
My question is why that turn off is there in the first place. I mean, it's pretty easy to just allow traffic to turn at River and considering there's a set of lights there, it just doesn't make any sense to me that they'd have that thing sitting there. Would it even be used without the government requiring it?
__________________
Giving you a reason to drink and drive since 1975.
     
     
  #2838  
Old Posted Jul 4, 2020, 5:21 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 14,976
sucks to lose the cedar siding.

Last edited by trueviking; Jul 4, 2020 at 6:16 PM.
     
     
  #2839  
Old Posted Jul 4, 2020, 5:24 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 14,976


Looks like clip art. ‘Upon city approval’. Not sure what that means.
     
     
  #2840  
Old Posted Jul 4, 2020, 7:58 PM
pspeid's Avatar
pspeid pspeid is offline
Registered User
 
Join Date: Aug 2018
Posts: 2,597
Quote:
Originally Posted by trueviking View Post


Looks like clip art. ‘Upon city approval’. Not sure what that means.
Maybe it referred to the discussion around whether the McLaren hotel would be given a full heritage designation. Correct me if I'm wrong (and I am certain someone in the group will do that) from what I remember the owners have said full heritage protection would make this project difficult to do, as part of the project involves some interior work in the hotel itself. I think the city settled on preservation of the north and east facades, but not the entire structure. Supposedly this makes the project workable (??).

Even if it's not an official rendering, it's nice to see what something in that space might look li.e
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:48 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.