Quote:
Originally Posted by Corndogger
What a load of — their reasoning is for a two year delay.
The South leg of the project was supposed to start construction this spring so starting in the summer should hardly warrant a two year delay. If the utility line has been moved what's the real reason for the delay?
|
The utility situation and timing of construction with the SW contractor near Highway 8 is pretty complicated and I would believe it. They can start this summer but probably can't go near Highway 8 for a long time.
Quote:
Originally Posted by Corndogger
I'd also like to know how much is going to be cut back because initially this part of the project was expected to cost at least $500 million. I can see bids coming in a lot lower under the current economic environment but ~50% lower?
|
Usually the big savings are changing designs to be more efficient. With the ring road, that means less bridges. I haven't seen the winning bid's plans but if they can simplify Highway 8 then that's the big ticket saved.