Quote:
Originally Posted by acottawa
fair point, but there has not been passenger service on that line in decades, and the continental service was probably never useful for locals. Not sure when local service ran on that line, probably the 1950s.
|
Passenger Rail service has been withdrawn with the Mulroney cuts on January 15, 1990. The (restored, but still operating over its traditional CP route) Canadian operated between Ottawa and Sudbury via Carleton Place - Pembroke - Chalk River - North Bay. The journey between Montreal and Sudbury (approx. 10 hours) was always during daylight for the 5 years for which transcontinental service was revived through Ottawa Valley (i.e. between June 1985 and January 1990):

Source: VIA timetable (effective 1989-04-30)
In terms of local services through the "Ottawa Valley" (i.e. passenger trains other than transcontinental services extending beyond Ottawa or Sudbury), CP operated two all-stop passenger trains per day between Chalk River and Ottawa (making no less than 22 stops on the 129.8 mile long route via Hull, Carleton Place, Renfew and Pembroke) until April 1957, when the service was replaced with a once-daily RDC ("Dayliner") service, which survived until October 1961:

Source: CP timetable (effective 1956-09-30)

Source: CP timetable (effective 1961-04-30)
As for CN, I could only find "Mixed trains" (i.e. combined passenger-freight trains), which operated once per week between Ottawa and Pembroke (until October 1960) and twice per week between Pembroke and Brent (until October 1964):

Source: CN timetable (effective 1960-04-24)
Quote:
Originally Posted by acottawa
interesting, they must have restored the supercontinental before cutting it again.
|
Quote:
Originally Posted by roger1818
that would have been the canadian. I’m the 80’s (before it was cut by mulroney) (and the supercontinental was renamed to the canadian), the canadian ran from montreal to vancouver via ottawa.
|
The Super-Continental (traveling on CN via Capreol-Hornepayne-Winnipeg-Saskatoon-Edmonton-Jasper-Kamloops) and the Canadian (travelling on CP via Sudbury-Thunder Bay-Winnipeg-Regina-Calgary-Banff-Kamloops) both operated through the Ottawa valley until October 1978, when the Sudbury-Montreal branch of the Canadian was discontinued together with the Capreol-Toronto branch of the Super-Continental. In June 1979, however, the two branches were swapped, with Vancouver-Montreal now being served by the Canadian and Vancouver-Toronto by the Super-Continental.
This arrangement lasted until the Pepin cuts of November 1981, when the Super-Continental was replaced through a string of local services (Capreol-Winnipeg, Winnipeg-Regina-Saskatoon, Saskatoon-Edmonton and the Skeena extended beyond Jasper to Edmonton) and cancelled altogether between Jasper and Vancouver, whereas the Canadian was rerouted via Toronto and attached to a Corridor train via Kingston to Montreal.
Until the Sudbury-Montreal branch and the Winnipeg-Edmonton-Vancouver segment of the Super-Continental were revived and added to the Canadian in June 1985, an RDC operated on the CP route from Ottawa to Sudbury, leaving Ottawa on Monday, Wednesday and Friday and returning from Sudbury the following day:

Source: VIA Rail timetable (effective 1984-10-28)
Quote:
Originally Posted by lrt's friend
My mother took local passenger service via CN to Pembroke back in the 1940s on occasion. She had to transfer at Golden Lake and that service was cancelled in 1956.
|
Just stumbled across that service by accident, must have been this one:

Source: CN timetable (effective 1954-04-25)
Quote:
Originally Posted by truenorth00
2:45 from ottawa to toronto just seems like a stretch. Unless that train has no stops at all en route. But i would think there's limited value in a service which doesn't at least serve the suburban stops in toronto and ottawa.
|
Just because a rail transport option is provided for 2:45, that doesn't prove that there is an intention to build such an option. It can also be used to prove that the additional demand for such a short travel time does not justify the incremental capital costs required for achieving it...