Quote:
Originally Posted by roger1818
It depends who is paying for the Ottawa extension. If it is Gatineau/Quebec, then you are correct. If it is being payed for by the Feds, then the extension should be built for the convenience of all passengers.
|
That's a fair assessment.
Quote:
|
Is it? The trains will have less than half the capacity of the Confederation line trains and will be a lot less frequent. As a result, I expect the number of passengers that would be travelling across the river to be smaller than the number of people currently using either Lyon or Parliament stations.
|
Frequency will be better than Line 1, as the STO envisions 25 trains per hour, so every two a half minutes roughly. And at 7,500 per hour coming into Ottawa (call it 6,500 due to a reduced workforce in the downtown post-covid), that's about half the volume of Confederation one way, on a train half the size (taking into consideration the higher frequency).
Quote:
|
I figured the extension was to get more passengers closer to their destination without having to transfer.
|
STO pointed to both the convenience and volume as the reasoning for the number of stations.
Quote:
|
But Spark street is pedestrian only. It would not be difficult to maintain pedestrian access to the businesses along it. I don't see this being any more disruptive than the Elgin Street Renewal (probably a lot less).
|
Not to minimize the pain that retailers and restaurants on Bank, Elgin, Preston and others have gone through, a cut-and-cover tunnel is far more disruptive. We also need to consider terraces. While Elgin restaurants have small terraces on the street, Sparks restaurants' are far larger, so the impact of losing them would be more pronounced. And we now know more than ever how important terraces are.
Quote:
|
Even with the tunnel, I don't see looping around to the Alexandra Bridge as being impossible. The turn radius would be no smaller than shown coming off of the Portage bridge onto Spark Street. Sure they would need to tunnel under the War Memorial and the canal to just north of The Chateau, but that wouldn't be all that difficult.
|
I agree with this, but at this point, STO is only considering a loop for the surface option. And that's my concern; will they have the foresight to build the tunnel in a way that maintains that option?
Ottawa built not just the tunnel, but the entire system in a way that limits future expansions beyond east-west; no stub at Rideau to extend to Vanier, terrible layout at Bayview that limits extension to Gatineau and makes it impossible to interline Trillium, layout and positioning of Hurdman makes it impossible to interline future Hospital line or S/E conversion. Even at Blair, I'm not sure how the Cumberland LRT will plug-in.