Old Posted Jun 17, 2020, 9:51 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
COVID might be a perfect opportunity to pull the plug in the RTG and send the trains back to Alstom for a refund. Normally this wouldn’t be feasible as we needed the system, but ridership is so low these days and will be reduced for the forceable future.
     
     
  #14562  
Old Posted Jun 17, 2020, 10:31 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,677
OC Transpo boss remains doubtful LRT will be reliable by Labour Day
RTG says 15 trains will run by Aug. 4, but hasn't offered date for final fix

Joanne Chianello · CBC News
Posted: Jun 17, 2020 4:35 PM ET | Last Updated: 2 hours ago


Ottawa's transit boss remains skeptical the Confederation Line will be running reliably by Labour Day, despite a promise from the light rail system's builder to finally have 15 trains running a month before.

John Manconi, Ottawa's general manager of transportation services, had told LRT constructors Rideau Transit Group (RTG) and its maintenance arm that the city wanted the myriad issues plaguing the Confederation Line fixed by the end of August, so that the $2-billion light rail system would be running smoothly by the time the local economy recovers from the current pandemic.

But three months after being issued a notice of default by the city for allegedly failing to meet some of its contractual obligations, RTG still hasn't given the city a date for reliability.

"We are not confident that they're tracking to the end of August," Manconi told transit commission members on Wednesday.

According to the transit boss, there is some disagreement between RTG and the French train provider, Alstom, over which issues are outstanding.

"They're blaming each other, and our position is we really don't care, we didn't buy a system whereby we're in the middle of you folks," Manconi told the commissioners. "We bought a service that is very simple and straightforward. We bought an outcome and that's service ... that's trains every day, reliably."

There was some good news in the LRT update: RTG has promised to run 15 double-car trains beginning the morning rush hour of Aug. 4.

In fact, Manconi had told councillors and the public for a year that the Confederation Line would run 15 trains during the peak hours, with two trains in reserve as spares. But just a month before the LRT launch last September, Manconi announced that the city would only be running 13 trains during rush hour — although even providing that number proved to be a challenge for RTG on many occasions during the past 10 months.

But the commission heard that 37 light rail cars are now ready for use, with a 38th on the way. That translates to 19 two-car trains that should theoretically be available for service on the Confederation Line.





RTG did not immediately respond to a request for comment about when fixes to the Confederation Line might be complete, but Manconi said the consortium has made progress on a number of fronts, including a major upgrade to the software that runs the doors.

One outstanding problem has to do with the switch heaters, which caused problems earlier this year. It appears the city would like RTG to upgrade the Confederation Line heaters from electric to gas-powered, like the ones used on the Trillium Line, but the consortium may be reluctant to spend the money.

Manconi said RTG has not been paid since a $4.5-million cheque sent to them late last year for September service.

"They call [city manager] Steve Kanellakos and myself every second day looking for money, and we keep telling them the easiest way that council will support us giving you money is if you give us the service," Manconi said Tuesday.

The city may owe RTG some money for service provided in December and the spring, Manconi said, but is also looking to hold back millions in payments because, it argues, RTG hasn't lived up to the service it was supposed to provide under the contract.

An update on the legal and financial dispute between RTG and the city will be given to councillors in camera at the July 15 meeting. Councillors are also expected to hear what other options, if any, are available to the city if it believes RTG is still not living up to its obligations.

https://www.cbc.ca/news/canada/ottawa/oc-transpo-boss-doubful-lrt-fix-labour-day-1.5615671
     
     
  #14563  
Old Posted Jun 18, 2020, 6:58 PM
DarthVader_1961 DarthVader_1961 is offline
Registered User
 
Join Date: Jun 2009
Posts: 478
Apparently heat causing issues on the confederation line

     
     
  #14564  
Old Posted Jun 18, 2020, 7:16 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,116
At the transit commission meeting last fall it was mentioned that the Trillium Line hasn't encountered a rail crack in the cold. I can't remember if it was explicitly stated whether the Trillium Line has received slow orders because of the heat though?

I remember Catenary mentioned that the ties are anchored fairly well, but I'm foggy on the details.
     
     
  #14565  
Old Posted Jun 18, 2020, 7:18 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
Slow orders in hot weather does not seem to be something unusual with rail systems.

https://www.itv.com/news/2019-07-25/why-does-hot-weather-cause-disruption-to-rail-travel/
     
     
  #14566  
Old Posted Jun 18, 2020, 10:53 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 29,109
Quote:
Originally Posted by J.OT13 View Post
The owner of Happy Goat Coffee was on CTV Morning Live. They expect to start construction on the Confederation Line kiosks within the next few days after a long delay due to Covid-19.

https://ottawa.ctvnews.ca/video?clipId=1975337&binId=1.1487308&playlistPageNum=1
Are they going to make enough to pay rent?
     
     
  #14567  
Old Posted Jun 19, 2020, 1:13 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
At the transit commission meeting last fall it was mentioned that the Trillium Line hasn't encountered a rail crack in the cold. I can't remember if it was explicitly stated whether the Trillium Line has received slow orders because of the heat though?

I remember Catenary mentioned that the ties are anchored fairly well, but I'm foggy on the details.
The Trillium line trains likely aren't fast enough to be affected by a slow order as its top speed is probably lower than the slow order would require.
     
     
  #14568  
Old Posted Jun 19, 2020, 2:47 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,116
Quote:
Originally Posted by roger1818 View Post
The Trillium line trains likely aren't fast enough to be affected by a slow order as its top speed is probably lower than the slow order would require.
Both lines have(had) approximately the same top speed of around 80km/h. Stage 2 will actually add a short section between South Keys and Leitrim where trains will hit 100km/h.
     
     
  #14569  
Old Posted Jun 19, 2020, 3:01 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
Both lines have(had) approximately the same top speed of around 80km/h.
Really? The stations on the existing line seem too close together for them to get up to 80km/h, especially with DMUs.

Quote:
Stage 2 will actually add a short section between South Keys and Leitrim where trains will hit 100km/h.
That section isn’t open yet so who knows if it will be affected by a slow order.
     
     
  #14570  
Old Posted Jun 19, 2020, 11:02 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,116
Quote:
Originally Posted by roger1818 View Post
Really? The stations on the existing line seem too close together for them to get up to 80km/h, especially with DMUs.
I know for sure that Mooney's to Carleton would exceed 50km/h, but the top speed areas were in the Dow's Lake tunnel (so, immune to the sun), and then between Carling and Gladstone.
     
     
  #14571  
Old Posted Jun 19, 2020, 12:24 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
O-Train Fans posted this from August 2016, when GO was under a slow order due to a heat wave:

https://globalnews.ca/news/2872715/go-transit-trains-under-3-day-slow-order-due-to-heat-wave/
     
     
  #14572  
Old Posted Jun 19, 2020, 10:39 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
OC Transpo Live
@OCTranspoLive
·
8h
O-Train Line 1: System wide holds currently in place while an issue is being resolved at Pimisi station. Please allow extra travel time. We apologize for the inconvenience. https://octranspo.com/en/alerts/#alerts-29854
Failure was also reported on CTV Ottawa news at 6 p.m.
     
     
  #14573  
Old Posted Jun 20, 2020, 11:52 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by OCCheetos View Post
At the transit commission meeting last fall it was mentioned that the Trillium Line hasn't encountered a rail crack in the cold. I can't remember if it was explicitly stated whether the Trillium Line has received slow orders because of the heat though?

I remember Catenary mentioned that the ties are anchored fairly well, but I'm foggy on the details.
I don't recall any noticeable slow orders due to heat on the Trillium Line, but there have been some due to the spring thaw and other issues.

I think the line benefits from a few things. First, there is the tunnel and trench at the north end to shade the tracks. More importantly, I don't think there are any stretches with a significant length of track without gaps or other places that would adsorb some expansion. There's 2 diamonds, multiple switches and jointed rail over the Rideau River bridge that would all hep. Combine all this with the relatively lightweight and slow rolling stock and it would have to be very hot to have problems.
     
     
  #14574  
Old Posted Jun 22, 2020, 3:17 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,677
O-Train Line 1 will be closed all week – and it 'may be further extended'

Megan Gillis, Ottawa Citizen
Publishing date: 2 hours ago • 1 minute read


The O-Train Line 1 is now scheduled to be shut down until the end of the week, but the closure for work to boost the troubled train’s performance could last even longer.

“We are continuing to work closely with (Rideau Transit Group), as this current closure may be further extended, or additional closures may be required over the summer,” general manager of transportation services John Manconi said in memo to city councillors Sunday.

“The focus remains on improving service reliability for our customers.”

OC Transpo staff will be on hand to direct riders to replacement buses that will be running along the Confederation Line during a fourth closure for work since the beginning of May.

The nine-month-old line had been scheduled to shut down Sunday, then have partial service running between uOttawa and Blair Stations through Wednesday. But an extension was approved to “expedite” the work.

RTG planned to implement updated train control software that was tested during a previous temporary closure and continue infrastructure work on the track and overhead catenary power supply system, according to an earlier memo.

Residents may see trains running and a variety of high-rail track equipment undertaking inspections and adjustments along the track.

https://ottawacitizen.com/news/local-new...cm/08969d92-1de7-4395-bb85-9c8464cecb09/
     
     
  #14575  
Old Posted Jun 22, 2020, 9:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Wonder if it's because they can get more done or if the work is dragging.
     
     
  #14576  
Old Posted Jun 22, 2020, 9:31 PM
Andrew_G Andrew_G is offline
Registered User
 
Join Date: Mar 2011
Location: Ottawa, ON
Posts: 48
https://ottawacitizen.com/news/local-news/rideau-transit-group-ceo-leaving-job

Rideau Transit Group CEO Peter Lauch leaving job.
     
     
  #14577  
Old Posted Jun 22, 2020, 9:34 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,677
Quote:
Originally Posted by Andrew_G View Post

Rideau Transit Group CEO Peter Lauch leaving job

Jon Willing, Ottawa Citizen
Publishing date: 6 minutes ago • 1 minute read


The chief executive of the Rideau Transit Group is leaving the company.

Peter Lauch’s last day with the City of Ottawa’s LRT contractor is July 10.

Lauch’s plan to leave the company has been in the works for about a month and city management was notified late last week.

Lauch has been CEO of RTG since 2018. The RTG partners named Lauch CEO of Rideau Transit Maintenance, the maintenance arm of RTG, last November.

In a statement, Lauch said: “When I accepted the challenge to head up RTG, my primary objective was to oversee the transition into revenue service. The RTM role was taken to quarterback the restructuring of Rideau Transit Maintenance. It was always my intention to stay on for the time necessary to complete those undertakings.”

According to a statement by RTG, the partners — ACS Infrastructure, EllisDon and SNC-Lavalin — “reluctantly accepted Mr. Lauch’s decision” to leave the company.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-news/rideau-transit-group-ceo-leaving-job
     
     
  #14578  
Old Posted Jun 22, 2020, 9:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
I'm shocked he lasted this long. And the companies that oversee RTG/RTM didn't want him to leave..?
     
     
  #14579  
Old Posted Jun 22, 2020, 9:59 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,116
Unrelated... but I never realized RTG had their own website.

They've actually got some pretty interesting (and recent) photos on there: https://rtg-rtm.com/en/news/photos-and-videos/
     
     
  #14580  
Old Posted Jun 22, 2020, 10:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Quote:
Originally Posted by OCCheetos View Post
Unrelated... but I never realized RTG had their own website.

They've actually got some pretty interesting (and recent) photos on there: https://rtg-rtm.com/en/news/photos-and-videos/
Also had not clue. Thanks for posting.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.