  #1921  
Old Posted May 14, 2020, 12:38 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
I think so, looks familiar though I wouldn't be able to pin down exactly which meeting/presentation it was from.

Bayview station.
Reply With Quote
     
     
  #1922  
Old Posted May 14, 2020, 1:22 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by OCCheetos View Post
I think so, looks familiar though I wouldn't be able to pin down exactly which meeting/presentation it was from.

Bayview station.
Right. Might have been one of the renderings shown when Stage 2 winners were annouced in February 2019.

That's a pretty major addition to Bayview. Not sure how well it goes with the existing station. My quesiton is, how can they build the Trinity pedestrian bridge without the Trinity complex?
Reply With Quote
     
     
  #1923  
Old Posted May 14, 2020, 1:50 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Video on R2 bus service, similar to the Rideau rehab bus service.

• Video Link
Reply With Quote
     
     
  #1924  
Old Posted May 14, 2020, 4:46 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Kind of neat that they updated some of the renders with the new livery, but...

They bothered to fix the livery for the Walkley station render, but not the extra second track?
Reply With Quote
     
     
  #1925  
Old Posted May 20, 2020, 2:53 PM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 321
Stage 2 LRT - Get Involved - Share your Snapshot Updates

The O-Train Fans Snapshot Updates (https://www.otrainfans.ca/snapshot) are our way of documenting, archiving and sharing the history of the O-Train station construction sites.

Over the coming years, we wish to continue this important project which also helps to inform citizens and residents of the work and progress being made at all of the station work sites. As the territory that the new extensions cover stretches across most of the city, O-Train Fans has developed a plan to enhance our coverage which would increase the frequency of updates.

The answer... our loyal rail fans and followers!

We want you to be part of this important time in Ottawa's history, by volunteering your time in helping us visit the station sites, taking photos and writing short descriptions of what is going on, and what is being shown in the images.

All you need is a camera or smartphone to take photos and ideally some basic photo editing skills (to adjust or enhance the photos taken).

If you'd like to know more, please follow the link : https://www.otrainfans.ca/news/stage-2-lrt-get-involved-share-your-snapshot-updates

Thank you very much for your time and consideration.
Reply With Quote
     
     
  #1926  
Old Posted May 21, 2020, 7:20 PM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 321
Memo / Incident - Stage 2 Construction Site Ottawa Airport

Just before 10:30 am this morning there was an incident at one of the Stage 2 South Extension construction sites near the Ottawa International Airport.

Preliminary information indicates that the workers were hurt while working on a rebar cage. Five workers were injured. One person was treated on site and four have been taken to hospital.

Ottawa Police, the contractor, TransitNext and Ministry of Labour are at the site of the incident and all activities has been stopped while an investigation into this incident occurs.

TransitNext will respond to any media inquiries regarding the incident.

Thank you,

John Manconi
General Manager, Transportation Services Department


https://www.otrainfans.ca/news/memo-incident-stage-2-construction-site-ottawa-airport
Reply With Quote
     
     
  #1927  
Old Posted May 21, 2020, 10:24 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,705
Five hurt on Trillium Line construction site

Jon Willing, Ottawa Citizen
Publishing date: 5 minutes ago • 1 minute read




Five workers were hurt on a Trillium Line construction site near the Ottawa International Airport on Thursday.

John Manconi, the general manager of transportation services, told council that just before 10:30 a.m. the workers were injured while working on a cage of reinforcing steel.

One worker was treated at the site and the others were taken to hospital, Manconi said. There was no information about the types of injuries and the condition of the workers in hospital.

Manconi said Ottawa police and the Ontario Ministry of Labour are with the contractor at the construction site. All construction activities have been stopped during the investigation, he said.

Mandy Downes of SNC-Lavalin provided more details.

“I can confirm that an accident occurred this morning at the Ottawa Airport, at the construction site for the future Airport Station and elevated guideway as part of the Trillium Line South Extension. Crews were assembling rebar cages when one collapsed onto five workers who were assembling the cage from the inside,” Downes said in an email.

“One of the workers was uninjured and the remaining four were taken to the hospital for assessment and treatment for injuries sustained.”

A Labour Ministry spokesperson said the injured workers’ employer is subcontractor Man Steel. A labour inspector attended the scene and the investigation is ongoing.

The Trillium Line expansion is being built by SNC-Lavalin under the name TransitNEXT.

The job includes extending the Trillium Line to the airport and Riverside South.

The workplace injuries are the first reported to council during the Stage 2 O-Train expansion project.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...cm/1a666e65-5b34-40bd-9023-5e202e3ef39b/
Reply With Quote
     
     
  #1928  
Old Posted May 22, 2020, 8:22 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
I biked along most of the existing line yesterday. The most activity is occurring within the Gladstone Station and Highway 417 area (mostly Highway 417 work I think). Other notable activity:

There was some geotechnical drilling going on at the Rideau River bridge (approximately where they will locate the new pedestrian/cycling bridge):



All the tracks and ties have been ripped up from the Ellwood Diamond to Mooney's Bay Station:



And there is a giant staging area already prepped adjacent to the Ellwood Diamond, east of the Airport Parkway and south of Heron Road:

Reply With Quote
     
     
  #1929  
Old Posted May 24, 2020, 12:30 AM
MountainView MountainView is offline
Registered User
 
Join Date: Feb 2011
Posts: 2,185
Quote:
Originally Posted by Multi-modal View Post
I biked along most of the existing line yesterday. The most activity is occurring within the Gladstone Station and Highway 417 area (mostly Highway 417 work I think).
That 417 overpass is scheduled to be demolished and replaced (rapidly) the weekend following Canada Day. If there wasn't a pandemic... the traffic chaos having the 417 closed from Thursday into the weekend would have been crazy!

Thanks for the updates!
Reply With Quote
     
     
  #1930  
Old Posted May 25, 2020, 8:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Reply With Quote
     
     
  #1931  
Old Posted Jun 10, 2020, 8:12 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Rock blasting started today at Gladstone.
https://twitter.com/deellisd/status/1270807466687827970
Reply With Quote
     
     
  #1932  
Old Posted Jun 10, 2020, 8:17 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by OCCheetos View Post
Rock blasting started today at Gladstone.
https://twitter.com/deellisd/status/1270807466687827970



https://twitter.com/deellisd/status/1270808301664690178
Reply With Quote
     
     
  #1933  
Old Posted Jun 12, 2020, 12:11 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day. FYI.

City has posted a brief bit on "Tracking Stage 2 Trillium Line Rail Bridge Work"

https://ottawa.ca/en/planning-developmen...g-stage-2-trillium-line-rail-bridge-work

Quote:
Tracking Stage 2 Trillium Line Rail Bridge Work

The Stage 2 Trillium Line South Extension project will provide a fast, efficient, affordable, accessible, and environmental commuting option for Canada’s fast-growing capital city.In addition to further stimulating the city’s development, this project will keep Ottawa’s residents, businesses, and visitors moving in multiple ways through the creation of 19 new bridges.

About the bridges:
One of the most interesting aspects of the Stage 2 project is that the entire O-Train system will be grade separated, meaning trains will travel within a dedicated guideway that crosses over or under roads, paths, and other transportation routes. In order to achieve this, 17 new bridges will be constructed and 2 bridges will be rehabilitated on the Trillium Line South Extension project that will benefit the community in multiple ways.

New pedestrian bridges will be constructed at Bayview Station, the Rideau River, and Hunt Club Road providing pedestrians and cyclists with new, convenient and safe active transportation choices.

Construction of seven rail-over-road bridges along the extension will allow the LRT to pass seamlessly over vehicular traffic. The rail bridges over Limebank and Bowesville Roads will have two tracks to enhance the operational efficiency of the line.

A new rail bridge will be constructed at Ellwood Diamond allowing VIA Rail trains to safely pass below the Trillium Line without any impacts to O-Train operations. .

Finally, a new pedestrian/wildlife bridge will be constructed at High Road between Leitrim and Bowesville Station, allowing for pedestrians and wildlife to connect the natural areas that would be otherwise divided by the alignment.

How are they built?
Crews will start by drilling caissons, which are usually solid, deep foundations constructed from reinforced concrete to support the bridge superstructure above. Caissons are an important element of the construction industry because they can be designed to distribute the load of a structure evenly to a solid and sound rock base, which provides stability to the structure. As part of the Trillium Line south extension, approximately 74 caissons will be drilled to an average depth of 30 metres. To date, 32 of the 74 caissons have been completed, using approximately 2,270 cubic metres of concrete. The TransitNEXT team is close to completing the caissons that will form the substructure for rail bridges over Leitrim Road, Lester Road and Bowesville Road as well as for the airport elevated guideway. Caisson work will soon start at Mosquito Creek and Ellwood Diamond.

Above the completed caissons, crews pour concrete columns and pier caps that ultimately support the pre-fabricated concrete girders that create the bridge deck. The girders used on the Trillium Line South Extension are approximately 40 metres long, requiring a 300-tonne-crane to hoist them into place before they are secured using concrete diaphragms.

Construction of the rail bridges over Uplands Drive, Bowesville Road and Airport Parkway has advanced to the point where concrete girders are schedule for installation in June.
EnJoy!
Reply With Quote
     
     
  #1934  
Old Posted Jun 12, 2020, 2:28 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
I'm confused. They are claiming 19 new bridges, but 2 of those bridges are existing structures that will be rehabilitated. And I'm pretty sure one of those "bridges", is a tunnel.
Reply With Quote
     
     
  #1935  
Old Posted Jun 12, 2020, 2:38 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by J.OT13 View Post
I'm confused. They are claiming 19 new bridges, but 2 of those bridges are existing structures that will be rehabilitated. And I'm pretty sure one of those "bridges", is a tunnel.
The line crosses over 3 bridges; the river and the SE Transitway twice. The SE Transitway bridge is just south of the VIA diamond, so it will be rolled into the new flyover. That leaves the one just north of Greenboro maybe?
Reply With Quote
     
     
  #1936  
Old Posted Jun 12, 2020, 2:43 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Catenary View Post
The line crosses over 3 bridges; the river and the SE Transitway twice. The SE Transitway bridge is just south of the VIA diamond, so it will be rolled into the new flyover. That leaves the one just north of Greenboro maybe?
Oh yeah... For some reason, I thought the original line was road over rail the entire way.
Reply With Quote
     
     
  #1937  
Old Posted Jun 13, 2020, 1:57 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
I drove from Leitrim to Barrhaven today. The Line 2 bridge structure is now over Bowesville Road.
Reply With Quote
     
     
  #1938  
Old Posted Jun 13, 2020, 1:10 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Reply With Quote
     
     
  #1939  
Old Posted Jun 13, 2020, 1:47 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
It is too bad we are not doing this all the way to the Dow's Lake tunnel. Get it done once and for all. I know, it is costly. Inevitably, we face another lengthy shutdown at some point in the future. Each time we shut down the Trillium Line, it impacts more riders and this will result in a loss of ridership at least temporarily. Post Phase 2, this is no longer the 'student train'. The city has to change its attitude. Long-term shut downs will no longer be acceptable.
Reply With Quote
     
     
  #1940  
Old Posted Jun 13, 2020, 2:11 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by lrt's friend View Post
It is too bad we are not doing this all the way to the Dow's Lake tunnel. Get it done once and for all. I know, it is costly. Inevitably, we face another lengthy shutdown at some point in the future. Each time we shut down the Trillium Line, it impacts more riders and this will result in a loss of ridership at least temporarily. Post Phase 2, this is no longer the 'student train'. The city has to change its attitude. Long-term shut downs will no longer be acceptable.
Competently agree. This is the urban part of the line. The only part where you can't efficiently double track without at lest some shut-downs. It will serve, within 15 years, some of the highest density in the city and a major hospital. It will be (up to Carleton) the only section of the line that will have consistent all day ridership. Spending an extra $50-$100 million on a $650 million project would have been more worth it. Hopefully, the City plans to double track the Trillium all the way to the tunnel at the same time they replace the Carling overpass. Maybe even electrify the north section at that time.

Anyone have an idea how it might be before the Carling overpass has to be replaced?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:02 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.