  #381  
Old Posted Aug 30, 2018, 5:06 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 410
Quote:
Originally Posted by roger1818 View Post
I believe those costs were not assuming any other work will be done on the street or the wiring. The street will be dug up to replace the water mains and all of the poles and wires likely need to be replaced as part of the street work anyway, so the actual cost will be lower, especially when you only consider the incremental cost.

According to this article, "An underground circuit typically costs anywhere from 1 to 2.5 times the equivalent overhead circuit." With the city already digging up the street, I suspect the costs will be on the lower end.
From a risk mitigation standpoint alone (given our crappy winters/wild stromy summers) O/H circuits should be buried when major renewal work is being carried out - everywhere.
Reply With Quote
     
     
  #382  
Old Posted Aug 30, 2018, 5:51 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by hwy418 View Post
From a risk mitigation standpoint alone (given our crappy winters/wild stromy summers) O/H circuits should be buried when major renewal work is being carried out - everywhere.
The 1998 ice storm really pointed this out. Parts of the city with underground wiring generally had little or no power outages.
Reply With Quote
     
     
  #383  
Old Posted Aug 30, 2018, 8:31 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by lrt's friend View Post
The 1998 ice storm really pointed this out. Parts of the city with underground wiring generally had little or no power outages.
Yup. I lived in an apartment at the time on Richmond close to Pinecrest, and our power didn't even flicker.
Reply With Quote
     
     
  #384  
Old Posted Aug 31, 2018, 3:13 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by roger1818 View Post
Yup. I lived in an apartment at the time on Richmond close to Pinecrest, and our power didn't even flicker.
Being in a valley, both Ottawa and Montreal are very prone to ice storms. It is only a matter of time before a 1998 level storm repeats again. We need to build our city to be less vulnerable over time.
Reply With Quote
     
     
  #385  
Old Posted Nov 22, 2018, 8:42 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
I received the following in an email just now:

Quote:

Project update: Elgin Street Renewal



The City of Ottawa is undertaking the design and construction for the renewal of Elgin Street from Gloucester Street to Isabella Street. It also includes some underground work on Waverley Street from Elgin Street to Metcalfe Street, through Jack Purcell Park.

Pedestrian access to businesses willremain open at all times and people are encouraged to continue to support Elgin area businesses during construction.

The project limits are in the Key Map PDF.

Project update
November Public Information Session

The City of Ottawa is hosting a Public Information Session at City Hall on Wednesday, November 28. This information session will provide an opportunity to review the final design for the projectand learn about the upcoming construction, road closure and traffic and transit detours. Details regarding the final design, transportation management, hydro utility update, public art and more will be presented. The project team will be available to discuss the project and answer questions.

Details:
Wednesday, November 28, 2018
4 pm to 8 pm (drop-in style with apresentation at 6 pm)
Jean Pigott Place / Council Chambers at City Hall
110 Laurier Avenue West

Can’t attend the session? The City of Ottawa will share a recording of the session online and content from the display boards will be posted on the project webpage after the event.

Public Art update

The City’s Public Art Program is pursuing the “Artist in Residence” program for the art installation on Elgin Street. This competitive assignment has been awarded to Montreal-based artist Francis Montillaud.

Photo 1: Samples of previous artwork by Francis Montillaud



Beginning this winter, the artist in residence will create a series of opportunities for collaboration and interaction with the Elgin Street community. The artwork created for the Elgin Street Renewal project will integrate visually significant elements that provide identity and a distinctive character to the public space. As a legacy of the Artist in Residence, the artwork will enhance the street and its surrounding areas by creating an environment that is aesthetically interesting and engaging for the community, pedestrians and drivers. Artwork installation is scheduled for spring 2020.

For more information, visit the Public Art webpage or email [email protected].

Hydro Ottawa update

Hydro Ottawa has commenced the first phase of the work to bury the overhead hydro lines, which includes the expansion of existing live duct banks along the east side of Elgin Street between Argyle Avenue and Lisgar Street.

Currently, Hydro Ottawa is working along the east side of Elgin between Waverley Street and Lisgar Street. On-street parking on both sides of Elgin is prohibited within these blocks.

The Hydro Ottawa work is expected to be completed in time for the closure of Elgin Street in January 2019. Pedestrian access to businesses will be maintained at all times. Regular updates on traffic impacts are also posted to ottawa.ca/elginstreet.

Photo 2: Existing clay duct tile has been eliminated and cables are now being encased in PVC duct



Bell Canada construction update

Bell Canada has been rehabilitating their underground infrastructure since March 2018. This infrastructure has reached the end of its lifecycle and requires repair before the City begins its underground infrastructure renewal in 2019.

Bell is currently completing construction between Cooper Street and Gloucester Street and between McLeod Street and Isabella Street. Work is well underway and is expected to be completed late this fall.

Photo 3: The completed manhole at Elgin Street and Argyle Avenue is being backfilled



Community corner

I DIG ELGIN is a community campaign featuring the people, places and events on and around Ottawa’s Elgin Street. Check out their website to learn more.



Mobility & you

Stay informed about capital infrastructure projects. Check out the City’s interactive traffic map and traffic report or call 3-1-1 for updates about when and where construction is happening.

Stay in the know
  • Visit us on the web at ottawa.ca/elginstreet
  • Follow our City social media accounts:
    • Twitter: @ottawacity
    • Instagram: @cityofottawa
    • Facebook: City of Ottawa / @cityofottawa

Contact us






City of Ottawa, 110 Laurier Ave. W., Ottawa, Ontario K1P 1J1, Canada

© 2001-2018 City of Ottawa

Visit ottawa.ca for a full list of newsletters

ottawa.ca | 3-1-1

TTY 613-580-2401

Email Marketing by ActiveCampaign
Reply With Quote
     
     
  #386  
Old Posted Nov 29, 2018, 12:45 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
City unveils final design for Elgin Street renewal
Construction will close downtown street to vehicles for all of 2019

Matthew Kupfer · CBC News
Posted: Nov 29, 2018 6:48 AM ET | Last Updated: an hour ago




City officials unveiled the final design for the Elgin Street revitalization at city hall Wednesday evening.

The design included tweaks made after an earlier consultation in May and the decision in late August to bury electrical poles along the busy downtown street.

At the direction of council, the 1.2 kilometres of Elgin Street between Gloucester Street and the Queen Elizabeth Driveway being redesigned will be reduced from four lanes to two, with turning lanes.

The sidewalks are being widened and parking is being reduced from 120 spaces to 90.

This will require Elgin Street to be closed to vehicles for all of 2019, with occasional lane closures or full road closures in 2020 to finish it off.

The project is costing $36.3 million.

Alain Gonthier, the city's director of infrastructure services, said the city reduced the use of cobblestone-style rough pavers on the sidewalk based on feedback from people concerned about mobility.

He said the city won't be able to add gradients, which are essentially ramps, to the entrance of each building.

"What we've made sure is that Elgin Street itself would not be a barrier from an accessibility perspective," Gonthier said.



The redesign for Elgin does not include separated or painted bike lanes, but so-called "super sharrows."

The installation of the bright green painted boxes led to confusion for both motorists and cyclists on Holland Avenue when they were installed this past summer as part of a detour for the Harmer Bridge.

Coun. Catherine McKenney said sharrows are not infrastructure, but there are other measures that will make Elgin inviting for cyclists.



"What makes Elgin different than Holland certainly is that it is … the first arterial really in the city that is designed for an operating speed of 30 km/h," McKenney said.

"Not just signs — the design will ensure that we have traffic calming."

Gonthier said raised intersections will help slow vehicles.

Some residents at the meeting also raised concerns that the city was making it too hard for vehicles to come downtown between the lane reductions on Elgin and O'Connor Street.

One asked whether the possibility of a parkade was considered.

An official at the meeting said that idea had not come up in prior consultations and that free parking is being provided on evenings and weekends in the city hall parking garage for the duration of road work.

Businesses on Elgin are working to remind people that, despite the year-long road closure, they will still be accessible on foot during construction.

"I'm quite excited at what it's going to look like afterward. I think it's going to completely transform Elgin Street into this friendly community," said Robin Coull, the owner of Pot and Pantry.

https://www.cbc.ca/news/canada/ottawa/elgin-street-revitalization-plans-schedule-1.4924973
Reply With Quote
     
     
  #387  
Old Posted Nov 29, 2018, 7:02 PM
SkeggsEggs SkeggsEggs is offline
Registered User
 
Join Date: May 2016
Posts: 410
Are those parking spots the same level of the sidewalk? I really like the way they do it on King Street in Downtown Kitchener and hope the replicate it here. Not a huge fan of how they did the parking at Rideau and Dalhousie.

I imagine having them at sidewalk level would make it easier to install patios in the summertime.
Reply With Quote
     
     
  #388  
Old Posted Nov 29, 2018, 10:10 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
Quote:
Originally Posted by SkeggsEggs View Post
Are those parking spots the same level of the sidewalk? I really like the way they do it on King Street in Downtown Kitchener and hope the replicate it here. Not a huge fan of how they did the parking at Rideau and Dalhousie.

I imagine having them at sidewalk level would make it easier to install patios in the summertime.
You can go to Queen street and see those "flex spaces" yourself. They'll all be flexibly occupied by cars though.
Reply With Quote
     
     
  #389  
Old Posted Jan 7, 2019, 5:47 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
Everything you need to know about the Elgin Street renewal in 2019 — and beyond

Taylor Blewett, Ottawa Citizen
Updated: January 7, 2019




Seven days into 2019, the city is kicking off Phase 2 of a 1.2-kilometre, $36-million dollar construction project to renew Elgin Street.

The completed project is slated to transform 16 blocks between Gloucester and Isabella Streets with wider sidewalks, infrastructure upgrades and streetscaping, among other changes. But in the meantime, it’s going to seriously disrupt traffic in the area.

To help you navigate Elgin Street in 2019 — when the bulk of the construction is slated to occur — we’ve created a guide laying out the changes you can expect, along with a look at how the community is feeling about Elgin Street’s facelift.

The Project

Drawing on public consultation and a council-approved functional design plan, the city started preliminary work on Elgin Street’s renewal last year. 2019 marks the bulk of the construction phase, with some final work scheduled between spring and fall 2020.

The changes will include wider sidewalks that conform to accessibility standards, flexible parking spaces that can also be used for streetside restaurant patios, public art, bicycle racks and streetscape elements such as tree planting and seating areas.

Sewers and watermains — some of which are more than 100 years old — will undergo reconstruction. The street’s overhead utility lines will be buried underground, a contested decision that Elgin business owner Minoo Banaei said changed her outlook on the whole project.

“That was my No. 1,” Banaei said, adding that she attended every public meeting on the Elgin Street renewal, and fought to have the hydro lines buried. The cost of doing so was raised as a counter-argument but in the end the city decided it was worth the multimillion-dollar price tag, in this particular case.

“Now I’m just quiet and patient … before I was angry,” she said of the year of construction that will close the section of Elgin on which her business, Bel Fiore Flowers, is located.

“It is a job that has to be done, hopefully they do it on time, that’s all I can say.”

On the streets, pavement and road structure will be upgraded and traffic calming measures such as a reduced speed limit and narrowing lanes will be implemented.

Waverley Street between Elgin and Metcalfe Streets, and Isabella Street between Elgin Street and Queen Elizabeth Driveway will also see some upgrades.

“We’re very happy about it. We’re looking forward to nice pedestrian areas,” said neighbourhood resident Hugh Finsten. “We live around the corner, so we’re less concerned about parking and things like that.”



Traffic

Area drivers, however, should be prepared for a major change in 2019. Starting Jan. 7, Elgin Street between Somerset and Catherine Streets will be closed to traffic.

Detours through surrounding streets have been established for traffic travelling in both directions. “Please be patient, plan ahead and expect delays,” the city suggests on its webpage for everything related to the Elgin project.

Drivers should also note some impacts between Laurier Avenue and Somerset Street. From Somerset Street to Nepean Street, Elgin’s northbound lane will be closed, while one southbound lane will remain open from Laurier Avenue to Somerset Street.

There will be a number of designated east-west street crossings along Elgin in both directions.

Parking will be prohibited on southbound Elgin between Laurier Avenue and Catherine Street, and on northbound Elgin between Catherine Street and Gloucester Street.

To alleviate some of this inconvenience, the city has offered up free parking at the City Hall parking garage at 110 Laurier Ave. West on weekdays after 6 p.m. and all day on weekends. The arrangement is scheduled to remain in place until the end of the year, which Christa Blaszczyk, owner-operator of Elgin’s boogie + birdie and The Gifted Type stores, called “really huge” for local businesses.

The city started providing this free parking in July when some of the construction was already underway. “So far, even the work that’s been done leading up to Christmas, we’ve seen customers still come out and support their favourite restaurants and their favourite shops,” Blaszczyk said.

As construction progresses, the city will transition to the full closure of Elgin Street between Laurier Avenue and Catherine Street. According to the city, a date for that transition will be communicated once it’s established.

The full road closure is set to lift come 2020, replaced by periodic road closures or lane reductions.

Pedestrians, Cyclists, Transit

For pedestrians, access to both sides of Elgin Street will be maintained at all times, either though a sidewalk or pedestrian clearway alongside building facades or down the centre of the street.

For cyclists, there will be a signed detour route.

OC Transpo routes 5 and 14, which usually travel down Elgin, will be detoured around the road closure with bus stops and shelters temporarily relocated along the detour routes.

Losing these Elgin-travelling buses is a concern, said Julia Norris, manager at The Ministry of Coffee.

“We rely heavily on foot traffic and a lot of people who work downtown take the bus and just get off here and then walk,” she explained. “The buses won’t be coming down this street, so it’s definitely going to affect us.”

Neighbourhood resident Barry Rooke said he’s looking forward to the traffic-calming aspects of the project.

“The road and the driving issues have always been a challenge, especially if you’re a pedestrian here.”

Commercial

Facing a more than a year of construction and closures on their section of Elgin Street, some business are feeling apprehensive.

Pat Garand is an employee at Sir John A Pub at Elgin and MacLaren streets.

“We’re not really 100-per-cent sure what the effect is going to be, but I remember when Bank Street closed, there was a whole whack of businesses that closed on Bank Street as well,” he recalled. “Bit leery about what might happen.”

In part, it’s this uncertainty that prompted a group of Elgin Street business owners to come together to launch “I Dig Elgin,” the tongue-in-cheek name for a social media-driven campaign designed to support area commerce and community during the construction-filled months to come.

Blaszczyk is one of the people behind the campaign. The idea is to foster a direct dialogue between businesses, consumers and community residents, she explained, sharing information about shops that are having sales, or the location of local trivia nights.

“For a lot of people, this is where they work and live … they come to the restaurants, they come to the gym or their yoga place, because this is their bubble,” she said.

“We want to talk with our customers directly … and say, ‘Why do you love Elgin? Why do you come to Elgin? We still want you to come to Elgin through the whole process.’”

https://ottawacitizen.com/news/local-new...-elgin-street-renewal-in-2019-and-beyond
Reply With Quote
     
     
  #390  
Old Posted Jan 8, 2019, 3:39 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day. FYI.

This CBC article contains better mapping as to the closures and detours.

Quote:
Elgin Street is closed: Here's what you need to know

Busy downtown strip closed from Somerset to Catherine streets as reconstruction kicks into high gear

CBC News · Posted: Jan 07, 2019
https://www.cbc.ca/news/canada/ottawa/elgin-street-closed-traffic-parking-1.4966241

EnJoy.
Reply With Quote
     
     
  #391  
Old Posted Jan 8, 2019, 5:52 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
Quote:
Originally Posted by PHrenetic View Post
Good Day. FYI.

This CBC article contains better mapping as to the closures and detours.



https://www.cbc.ca/news/canada/ottawa/elgin-street-closed-traffic-parking-1.4966241

EnJoy.
Elgin Street is closed: Here's what you need to know
Busy downtown strip closed from Somerset to Catherine streets as reconstruction kicks into high gear

CBC News · Posted: Jan 07, 2019 4:00 AM ET | Last Updated: January 7


The reconstruction of Elgin Street has entered a new phase today: the downtown strip is now closed to all vehicular traffic from Somerset to Catherine streets.

Sidewalks will remain open to pedestrians.

The first phases of the $36-million project saw lane closures and parking restrictions along Elgin, which is lined with shops, bars and restaurants.

Replacing underground infrastructure and revamping the streetscape, including burying power lines, requires the full closure of the street.

That work is expected to last all year. Here's what to expect:

For drivers

The approximately 700-metre stretch between Somerset and Catherine will be transformed into a construction site. Northbound lanes of Elgin will also be closed from Somerset to Nepean streets.

One southbound lane of Elgin will remain open south of Laurier Avenue, but there won't be any parking. Drivers travelling north and south through the downtown are encouraged to use Metcalfe and O'Connor streets, respectively.

Crossing Elgin in a vehicle will only be possible both ways at Somerset, westbound at Lewis and McLeod streets, and eastbound at Gladstone Avenue.

There's free parking at Ottawa City Hall after 6 p.m. on weekdays, and all day on weekends and holidays, during construction.



For transit users

OC Transpo Routes 5 and 14 will be detoured onto Metcalfe and Cartier streets.

Southbound buses will still pick up passengers at a stop at Elgin and Gloucester streets.

Route 14 will take McLeod and Metcalfe to Gladstone Avenue.

Route 5 will use the Queen Elizabeth Driveway and McLeod between Cartier and Hawthorne Avenue.



For cyclists

Cyclists are encouraged to use the Rideau Canal pathways or the O'Connor Street bike lane during the Elgin Street closure.

Remember, you won't be able to cross Elgin at some intersections, even on two wheels.



For pedestrians

Sidewalks will remain open at all times to allow access to businesses along Elgin Street.

Again, you won't be able to cross Elgin at every intersection.

All done in 2020

Partial lane closures are expected through to the fall of 2020 while workers put the finishing touches on the surface work, including lighting and public art.

https://www.cbc.ca/news/canada/ottawa/elgin-street-closed-traffic-parking-1.4966241
Reply With Quote
     
     
  #392  
Old Posted Jan 8, 2019, 7:37 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day.

Thx, rocketphish.

EnJoy!
Reply With Quote
     
     
  #393  
Old Posted Mar 26, 2019, 11:35 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
Another section of Elgin Street to close Monday

Julia Lennips, Ottawa Citizen
Updated: March 26, 2019


The southbound lane on Elgin Street from Laurier Avenue to Somerset Street will be closed starting Monday as part of the major construction work along the Centretown street.

Elgin is currently undergoing construction from Gloucester Street to Isabella Street. This includes underground work on Waverley Street from Elgin Street to Metcalfe Street, and through Jack Purcell Park.

The finished project will provide 16 blocks between Gloucester and Isabella Streets with wider sidewalks, infrastructure upgrades, streetscaping and more.

For all traffic, transit and cyclist detour maps, visit ottawa.ca/elginstreet.

The city hall parking garage will remain open. Motorists will only be able to turn right when exiting the parking garage. City hall has free parking on weekdays after 6 p.m., and all day on weekends and statutory holidays.

For northbound and southbound traffic, there are designated street crossings to provide east-west access to destinations that are next to the construction zone.

OC Transpo routes 5 and 14 currently using the southbound lane on Elgin Street from Laurier Avenue to Somerset Street will use the O’Connor Street detour route instead.

During construction, pedestrians will still be able to access businesses on both sides of Elgin Street. Crosswalks along Elgin are being maintained where possible, the city says.

https://ottawacitizen.com/news/local-news/another-section-of-elgin-street-to-close-monday
Reply With Quote
     
     
  #394  
Old Posted Nov 28, 2019, 2:23 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
Elgin Street to reopen next month
Stretch of commercial strip had been closed to 2-way traffic since January

Trevor Pritchard · CBC News
Posted: Nov 27, 2019 1:24 PM ET | Last Updated: 4 hours ago




A closed-off stretch of Elgin Street is expected to reopen to two-way traffic next month for the first time since January.

Ottawa Mayor Jim Watson tweeted Wednesday he was "very excited" to ann

Elgin Street is in the midst of a multi-million-dollar streetscape rehabilitation project that includes burying the power lines and introducing more bike- and pedestrian-friendly infrastructure.

The stretch of Elgin between Somerset and Catherine streets was closed to drivers in January 2019, and has since essentially been one large construction site — to the chagrin of some local business owners.

OC Transpo routes 5, 14 and 114 will also resume running along Elgin as of Dec. 16, the city said.

While traffic has returned, that doesn't mean the project itself is about to wrap up. Construction will resume early next year, as hydro poles still need to be removed along the street's west side, buildings need to be connected to underground services, and other streetscaping elements need to be completed.

In an update Wednesday, the City of Ottawa noted the project's cost had risen to roughly $40 million — an increase from the $36.3 million it was initially pegged at.

"This was the original estimate prior to finalizing the design and full scope of the project. As with all projects, the preliminary and detailed design were refined and the cost estimates updated to become more accurate," said Carina Duclos, manager of design and construction, in an email to CBC News.

The work on Elgin is still expected to wrap up before the end of 2020, the city said.

I Dig Elgin, a group formed by local merchants and residents after the project was announced, tweeted Wednesday that while there might still be some lane reductions next year, no road closures are scheduled.

A motion to extend free parking at Ottawa City Hall on evenings and weekends through the 2020 construction season will be brought forward at city council.

https://www.cbc.ca/news/canada/ottawa/elgin-street-closed-traffic-reopening-december-1.5375425
Reply With Quote
     
     
  #395  
Old Posted May 27, 2020, 5:29 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,688
8:41 AM · May 27, 2020
Hydro Ottawa @hydroottawa · 4h

A look at Elgin Street this morning as we work to remove the overhead service. #ottcity @cmckenney




https://twitter.com/hydroottawa/status/1265624262209044482
Reply With Quote
     
     
  #396  
Old Posted May 27, 2020, 5:57 PM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
Angry

No transit priority whatsoever... :sigh:
Reply With Quote
     
     
  #397  
Old Posted May 27, 2020, 6:07 PM
DarthVader_1961 DarthVader_1961 is offline
Registered User
 
Join Date: Jun 2009
Posts: 478
Sidewalks are pretty wide now. Looks tight.
Reply With Quote
     
     
  #398  
Old Posted May 27, 2020, 8:45 PM
trhgr's Avatar
trhgr trhgr is offline
Registered User
 
Join Date: May 2012
Location: Downtown Ottawa
Posts: 145
Quote:
Originally Posted by DarthVader_1961 View Post
Sidewalks are pretty wide now. Looks tight.
Don't be fooled by the extensive light-grey surface. There's a lot of it that's not sidewalks (parking spots and access to bus stops). Definitely much better than it was, though.
Reply With Quote
     
     
  #399  
Old Posted May 27, 2020, 8:55 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
All we need are trams re-installed going to the old Clegg Street loop (the little parkette where the old loop used to be is still present).
Reply With Quote
     
     
  #400  
Old Posted May 27, 2020, 8:58 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,828
Oh wow, the removal of the poles will be most welcomed on Elgin. And the redesign looks nice, larger sidewalks look better as well vs the previous tiny sidewalks.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:44 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.