Thanks Bess. I love it! Any idea if it's been updated at all since 2013 though? Pretty great ideas especially for back then.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #2622  
Old Posted Apr 22, 2020, 9:10 AM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 8:27 PM.
Reply With Quote
     
     
  #2623  
Old Posted Apr 22, 2020, 12:25 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 8:27 PM.
Reply With Quote
     
     
  #2624  
Old Posted Apr 22, 2020, 12:45 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 8:28 PM.
Reply With Quote
     
     
  #2625  
Old Posted Apr 22, 2020, 1:09 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 8:28 PM.
Reply With Quote
     
     
  #2626  
Old Posted Apr 22, 2020, 4:35 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,330
Given that there has been a lot of talk here about the new Saskatoon Public Library building, I thought I'd share a bit of information regarding the status of the project.

In March of this year, the City of Saskatoon issued an RFP for owner's Representation Services. Those proposals were due on April 20th with the successful proponent to be selected by mid-May.

Among the duties of the Owner's Rep (likely a Project Management firm) to occur in Phase 1 of their duties is the development of a detailed project plan, a schedule and an budget. Procurement of Design Services isn't until Phase 2 of the Owner's Rep's services. Oversight of Design Services and Procurement of Construction Services are Phases 3 & 4 of their duties.

The RFP goes on to list some milestones that will be of interest to most of us:
  • Procurement of Design Services: June 20 - Fall 20
  • Oversight of Design Services: Fall 2020 - Winter 2022
  • Procurement of Construction Services: Winter 2022 - Spring 2023
  • Oversight of Construction Services: Summer 2023 - Fall 2025
  • Logistics for Occupancy: Spring 2025 - Winter 2026
  • Post-Occupancy Review: Early 2026 - Early 2027

So, looks like a new Library opening is likely sometime in 2026.
Reply With Quote
     
     
  #2627  
Old Posted Apr 23, 2020, 12:30 AM
Temperance Temperance is offline
Registered User
 
Join Date: Mar 2009
Location: Winnipeg
Posts: 471
Quote:
Originally Posted by Crisis View Post

The RFP goes on to list some milestones that will be of interest to most of us:
  • Procurement of Design Services: June 20 - Fall 20
  • Oversight of Design Services: Fall 2020 - Winter 2022
  • Procurement of Construction Services: Winter 2022 - Spring 2023
  • Oversight of Construction Services: Summer 2023 - Fall 2025
  • Logistics for Occupancy: Spring 2025 - Winter 2026
  • Post-Occupancy Review: Early 2026 - Early 2027

So, looks like a new Library opening is likely sometime in 2026.
Thanks for the update! So it looks like we're a ways off. Glad to see it proceeding, at any rate.
Reply With Quote
     
     
  #2628  
Old Posted Apr 23, 2020, 12:31 AM
Roquentin Roquentin is offline
Registered User
 
Join Date: Aug 2008
Posts: 269
Lots of thought-provoking ideas being shared here these days! With plans for a new library in the works, I wonder what will happen to the current building. Is the building itself still in reasonably good shape? Could it see continued use for other purposes, possibly for community-oriented groups/events? Or is it likely to be demolished? If so, what would people like to see in its place? I live in Saskatoon Tower, and the library is a nice boost of vibrancy and activity for the area. When the library moves, I hope that level of activity can be maintained by whatever takes its place. Maybe a residential tower with shops and offices in the base? What would you all like to see there?
Reply With Quote
     
     
  #2629  
Old Posted Apr 23, 2020, 2:56 AM
phone's Avatar
phone phone is offline
Unregistered User
 
Join Date: Oct 2012
Location: Saskatoon
Posts: 745
How reusable is the building? Would it have to be gutted to bring it to code, or could it just be used for offices? i.e. are the fire code violations specific given the building's use or generally applicable? I'd like to keep the building there. It could do for a River Quarry treatment. Preferably one that reflects the heritage of the building. Like it or not, it is iconographic for Saskatoon. Would be a shame to lose it as much as it was to lose the Ross Building or other pre-war downtown blocks.
Reply With Quote
     
     
  #2630  
Old Posted Apr 24, 2020, 6:27 PM
one_brick_at_a_time's Avatar
one_brick_at_a_time one_brick_at_a_time is offline
Registered User
 
Join Date: Apr 2009
Location: Regina/Toronto
Posts: 2,389
Quote:
Originally Posted by one_brick_at_a_time View Post
What is the current update of the Delta Bessborough rebranding to Autograph Collection? Are they done the renovations yet?
Anyone?
Reply With Quote
     
     
  #2631  
Old Posted Apr 24, 2020, 7:16 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Quote:
Originally Posted by one_brick_at_a_time View Post
What is the current update of the Delta Bessborough rebranding to Autograph Collection? Are they done the renovations yet?
I know that at one point, the schedule had them well underway in Jan, but they had not started by Feb. I know this because an aquaintance got a fantastic deal for one of the ballrooms in Jan... greatly discounted because of the anticipated construction, but there was none. As far as I know they still have not started yet, but I am not 100% certain which is why I was reluctant to answer.
Reply With Quote
     
     
  #2632  
Old Posted Apr 25, 2020, 5:41 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 8:28 PM.
Reply With Quote
     
     
  #2633  
Old Posted Apr 27, 2020, 3:49 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 8:29 PM.
Reply With Quote
     
     
  #2634  
Old Posted Apr 27, 2020, 4:51 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,330
Quote:
Originally Posted by Ricopedra View Post
Just take the remnants from the first library, strip the art and wood, pooh corner, etc., incorporate it and cart it over to the new site. The precast concrete, the 2 floor height, etc... there's nothing else to salvage. Let it go. Get on with it. There's nothing sacred here. Thanks for understanding the balance of past, present and future. Now f@#k off.
Thank you, Ricky Gervais.

Seriously, though, I am in agreement with you. That building has never been much to look at and most people would question its historical significance. On a related note, I just heard that those involved with the Library Board on their new facility and have found them extremely challenging to work with. Secondhand information, but I don't doubt it. Publicly funded boards seem to want everything, especially when spending taxpayer money.
Reply With Quote
     
     
  #2635  
Old Posted Apr 27, 2020, 4:54 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 8:29 PM.
Reply With Quote
     
     
  #2636  
Old Posted Apr 27, 2020, 4:59 PM
Ricopedra Ricopedra is offline
Registered User
 
Join Date: Nov 2008
Posts: 729
edit

Last edited by Ricopedra; Jun 7, 2021 at 8:29 PM.
Reply With Quote
     
     
  #2637  
Old Posted Apr 29, 2020, 7:19 PM
Echoes's Avatar
Echoes Echoes is online now
Registered User
 
Join Date: Oct 2006
Location: Saskatoon, SK
Posts: 4,523
Drove past Baydo's 25th Street site and they appear to be constructing a covered construction walkway on the sidewalk.
__________________
SASKATOON PHOTO TOURS
2013: [Part I] [Part II] | [2014] | [2016] | [2022-25]
Reply With Quote
     
     
  #2638  
Old Posted Apr 29, 2020, 8:34 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
Quote:
Originally Posted by Echoes View Post
Drove past Baydo's 25th Street site and they appear to be constructing a covered construction walkway on the sidewalk.
As a reminder, I believe this is the last rendering we saw for this lot... I have previously posted my opinion of the architectural merits of these buildings and will not repeat them here.

Reply With Quote
     
     
  #2639  
Old Posted Apr 29, 2020, 10:40 PM
SaskE30 SaskE30 is offline
Registered User
 
Join Date: Oct 2014
Posts: 182
[QUOTE=alt_center;8907762]As a reminder, I believe this is the last rendering we saw for this lot... I have previously posted my opinion of the architectural merits of these buildings and will not repeat them here.

It's especially disappointing/annoying because before the property was put up for sale, the city hired a local architectural firm to create a set of Architectural control guidelines for that site:

(Search "410" in the document and you should find all of the relevant sections related to that site that were discussed at the meeting as well as the actual report (Pages 84-119))

https://www.saskatoon.ca/sites/default/f...ees/agendas-minutes/2016/a_fi_051216.pdf

It does say that the developer would have to submit a proposal that would comply with the architectural guidelines as a condition of the sale.

If you look at section 4 of the report (page 101 of the PDF), it lists several guidelines related to the exterior appearance. I would say Baydo's current rendering wouldn't comply with more than a couple of them.
Reply With Quote
     
     
  #2640  
Old Posted Apr 29, 2020, 11:38 PM
905er's Avatar
905er 905er is offline
Registered User
 
Join Date: Jan 2016
Location: Mississauga
Posts: 1,412
is that rendering a complete joke?.. was it a quarantine homeschooling project for an 8 year old child?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:31 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.