LeBreton Flats redevelopment faces delay risks because of pandemic
Jon Willing, Ottawa Citizen
Publishing date: 50 minutes ago • 5 minute read
<snip>
New park on Chaudière Island scheduled to open in 2021
A small park at the western edge of Chaudière Island called Pangishimo Park is scheduled to open in spring 2021, according to the NCC.
The board approved the design during the meeting.
According to the NCC, Pangishimo Park will have an open grass area, naturalized play elements for children, a universally accessible pathway network, a boardwalk and lookouts to watch the sunset.
There are three new parks in the planning stages as part of the massive Zibi mixed-use development along the Ottawa River.
The other parks are Mòkaham Park and Tesasini Park at the eastern tip of Chaudière Island and along the Gatineau shoreline, respectively. The NCC is working on a project to protect the shorelines from flooding in those areas, so the design approvals are pending.
The Zibi developer has agreed to fund the parks. Windmill Developments came up with the vision and now Dream has the controlling interest in the project.
The NCC is able to begin developing Pangishimo Park because the area isn’t prone to flooding.
The agency chose the names of the parks after consulting with the Algonquins. Pangishimo means sunset, Mòkaham means sunrise and Tesasini means flat rock.
<snip>
[email protected]
twitter.com/JonathanWilling
https://ottawacitizen.com/news/local-new...cm/137f07f0-acab-4637-9696-c83026e46abe/