While they have traffic totally fucked there, they should also do the Hamilton/Highbury intersection improvements at the same time.
Reply With Quote
     
     
  #1222  
Old Posted Dec 20, 2019, 9:21 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Thumbs down

York in front of VIA has FINALLY completed and been opened. City needs to sit down with contractors and engineering dept and do a post implementation report on why these projects are taking too long. Clearly there is something wrong with processes and planning that results in these being late. And it is not just weather excuses.
Reply With Quote
     
     
  #1223  
Old Posted Dec 20, 2019, 10:34 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Surprised to see it open, considering the work they were doing when I went up Richmond about 10am. Still, considering it was dirt moonscape a few days ago, I'm impressed. I assume this isn't it with this street though? Are they going east to Wellington next year, or up Clarence?
Reply With Quote
     
     
  #1224  
Old Posted Dec 21, 2019, 2:57 PM
BIGGUY2891 BIGGUY2891 is offline
Registered User
 
Join Date: Nov 2010
Location: London
Posts: 41
Quote:
Originally Posted by Djeffery View Post
Surprised to see it open, considering the work they were doing when I went up Richmond about 10am. Still, considering it was dirt moonscape a few days ago, I'm impressed. I assume this isn't it with this street though? Are they going east to Wellington next year, or up Clarence?
I believe the sewer separation on York is planned to continue until they reach Lyle. Richmond will be torn up next year to either King or Dundas, can't remember which at the moment.
Reply With Quote
     
     
  #1225  
Old Posted Jan 10, 2020, 1:46 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,481
Not in the City proper, but Wonderland Road needs one final extension to Highway 3

https://www.google.ca/maps/@42.8108701,-81.2282703,15.49z

With all the traffic using the road south of the 401 now, it's one of the main connectors to St. Thomas. Just before Wonderland ends, it slows to 60km/h, curves to the E-W and you need to take another rural connector road to access Highway 3.

-----

In terms of Fantasy, if an interchange was added at Highway 3 and Wellington, then the St. Thomas Expressway could actually start at this new intersection with Wonderland. Heck this could be an interchange too. Properties aren't connected to Highway 3 until it's west of Wonderland.
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #1226  
Old Posted Jan 10, 2020, 11:19 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
It would be relatively simple I think, barely a quarter mile. It was never done originally because Wonderland just curved east onto county road 52 and carried on east towards Aylmer before the highway 3 bypass was built just south of it. Honestly, in the hundreds of times I have gone through there over the years, I've never been bothered by the jog onto 52 to go onto highway 3. And many of those times have been in a tractor trailer. The county or township hasn't even seen the need to put a light there yet so I don't think the volume is such that it requires re-jigging the intersection. I would be interested in the traffic count down there because it's rare I see more than one or two cars between the 401 and 3. It's certainly a lot quieter a road now than it was when Ford was open, at least at this intersection.
Reply With Quote
     
     
  #1227  
Old Posted Jan 16, 2020, 8:42 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,481
Good meme from 98.1 Classic Rock's Facebook page



https://www.facebook.com/ClassicRock981/photos/a.182525448468643/2644125935641903/?type=3&theater

To me cars are either rockets or tricycles on this stretch
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #1228  
Old Posted Feb 21, 2020, 9:53 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Must be almost spring. Once again, more Wilton Grove closures starting next week. Starting Monday, and for the next 7 or so months, WG is closed from Commerce to Old Victoria for reconstruction. Which will be nice when it's done for sure.
Reply With Quote
     
     
  #1229  
Old Posted Mar 27, 2020, 10:39 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Thumbs down

I've never seen so much garbage along the stretch of Highbury south of Hamilton Rd to the 401. WTF! Did a garbage truck dump its load all the way down that stretch.
Reply With Quote
     
     
  #1230  
Old Posted Apr 1, 2020, 1:38 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Unless things are changing because the shutdowns, Clarke Rd north of Huron is supposed to be closing tomorrow until April 24th. I imagine bridge work since that's where the sign is.

Also, Highbury lane closures start at the river south of Hamilton on April 14. They will be putting a crossover in the median so it will be 2 way traffic over each side of the bridge while work is done on the other side, and then switch sides later on in the summer.
Reply With Quote
     
     
  #1231  
Old Posted Apr 1, 2020, 1:51 AM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,481
Still 'supposed' to be full steam ahead for the construction business.

If things get restricted some more, I think publicly funded projects and/or infrastructure work will still go ahead to some degree. It would be private projects that would slow or stop.

Clarke will be curved a bit to meet up with the VMP extension. I would assume this closure is related to that.
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #1232  
Old Posted Apr 1, 2020, 10:41 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
The sign for the closure is up by the river. They did a similar closure last April for bridge work as well. I don't think Clarke is going to be closed for that intersection change until they actually have VMP running through there.
Reply With Quote
     
     
  #1233  
Old Posted Apr 23, 2020, 12:31 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Clarke was originally supposed to open this Friday, but the sign said a few days ago that it's closed until May 1st now.
Reply With Quote
     
     
  #1234  
Old Posted Apr 23, 2020, 12:54 AM
greenday99 greenday99 is offline
sketchy dude
 
Join Date: Oct 2019
Location: london
Posts: 63
does anyone know where the overhead compass sign on the 401 near old victoria road has gone?
Are they replacing it?

Last edited by greenday99; Apr 23, 2020 at 1:26 AM.
Reply With Quote
     
     
  #1235  
Old Posted Apr 23, 2020, 7:16 PM
greenday99 greenday99 is offline
sketchy dude
 
Join Date: Oct 2019
Location: london
Posts: 63
Quote:
Originally Posted by greenday99 View Post
does anyone know where the overhead compass sign on the 401 near old victoria road has gone?
Are they replacing it?
It did get replaced.
Reply With Quote
     
     
  #1236  
Old Posted May 2, 2020, 3:45 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Quote:
Originally Posted by Djeffery View Post
Clarke was originally supposed to open this Friday, but the sign said a few days ago that it's closed until May 1st now.
And May 6th it says now.
Reply With Quote
     
     
  #1237  
Old Posted May 2, 2020, 3:28 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Also, sewer season is beginning on Monday May 4th with 3 projects beginning, each supposed to last about 3 months.

Richmond will be closed between York and King. The intersections will be open, although York has had some work done on it this past week with a centre median installed just west of Clarence, and they will likely be paving here soon.

Dundas will be closed between English and Rectory. You will be able to access Dundas eastbound from Rectory, and I assume also Rectory from Dundas westbound.

Hamilton Road will be closed east of Egerton. As well Egerton will be closed north and south of Hamilton. You will however be able to access Trafalgar going eastbound from Hamilton and also go westbound on Trafalgar onto Hamilton.
Reply With Quote
     
     
  #1238  
Old Posted Jun 27, 2020, 1:04 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Free Press article on city transportation projects, many of which are already well underway.

https://lfpress.com/news/local-news/110-...qO3NCl_aLCbRopFnXtnsQL9RVrlLsssdp6YZXzIM
Reply With Quote
     
     
  #1239  
Old Posted Jul 1, 2020, 12:23 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Wilton Grove reconstruction is progressing what looks like a lot faster than planned. They were paving the stretch between Cheese Factory and Commerce today, and the road is finished and lines painted a little ways east of Cheese Factory. Supposed to be finished by the end of September, but I wouldn't be shocked to see this done in the next couple weeks.
Reply With Quote
     
     
  #1240  
Old Posted Jul 1, 2020, 4:20 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Knowing the ineptitude of our city traffic planning dept they likely are rebuilding it as 2 lanes without paved shoulders, dedicated turn lanes. 2 inch skim coat of asphalt that will be destroyed by all the heavy truck traffic within a year.


Planning and vision would see it built as four lanes wide with diverged left turn lanes and right turn lanes to open up drivers sight lines and paved shoulders. Heavy load engineered with extra base and even concrete in areas where trucks would ruin the roadbed. Let's hope so....



Quote:
Originally Posted by Djeffery View Post
Wilton Grove reconstruction is progressing what looks like a lot faster than planned. They were paving the stretch between Cheese Factory and Commerce today, and the road is finished and lines painted a little ways east of Cheese Factory. Supposed to be finished by the end of September, but I wouldn't be shocked to see this done in the next couple weeks.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:39 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.