  #781  
Old Posted Oct 15, 2019, 4:41 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Quote:
Originally Posted by Kitchissippi View Post
The floorplate of the smallest tower has increased from a variable 1194-1614 square metres to a consistent 2000 sqm. I think the lower height is just to keep the volume consistent with the older submitted plan.
Yes, the floor area for office has actually gone up... There are lots of minor tweaks to the plans. From June 2018 plans to August 2019 total site GFA has gone up from 128,894 sq m to 130,109 sq m.

Office GFA has gone up from 34,021m2 to 39,379 m2
Residential GFA down, from 85,358m2 to 82,479 m2
Retail GFA down, from 10,515 m2 to 8,161m2

Parking spaces down from 1059 to 846, bike parking up from 800 to 1008.
Reply With Quote
     
     
  #782  
Old Posted Nov 29, 2019, 2:27 PM
sleye sleye is offline
Registered User
 
Join Date: Aug 2011
Posts: 35
Quote:
LRT the ‘driving factor’ in Trinity’s planned residential builds in downtown Ottawa
BY: David Sali

*snip*

“The LRT is definitely a driving factor,” Laing says. “For us, our focus has been really on mixed-use buildings and creating those environments where people can have those live-work-play type opportunities. That’s what we’re really focused on.”

Next up on Trinity’s to-build list is a three-tower mixed-use development at 900 Albert St., just steps from the Bayview LRT station where the Trillium and Confederation lines meet.

Trinity is joining forces with InterReit REIT and PBC Real Estate Advisors on the massive project, which will include three highrises of 65, 56 and 27 storeys with a total of about 1,300 rental apartments. Laing said “ballpark figures” call for roughly 85,000 square feet of retail and half a million square feet of office space at the site.

The developers have yet to set a timeline for construction, but the retail and office components are “doing very well from a leasing perspective,” Laing says, adding “several large-scale tenants” are already on board.

“Really now, it’s about getting that mix in place where you have your large-scale anchor tenants … and then you complete that picture by working with some of the smaller retailers as well to create that full dynamic that we want,” he says. “That entire project will have a real interesting life cycle because of all the different people that will be coming in and out.”

*snip*
https://obj.ca/article/lrt-driving-factor-trinitys-planned-residential-builds-downtown-ottawa

So this development is "next" for Trinity. No timeline on that, but getting going next summer would be
Reply With Quote
     
     
  #783  
Old Posted Jan 14, 2020, 10:30 AM
Brannwagon Brannwagon is offline
Registered User
 
Join Date: Nov 2019
Location: Ottawa, ON
Posts: 103
https://obj.ca/article/room-lot-more-buildings-booming-ottawa-rental-market

New OBJ article says Trinity hopes to break ground on this project in the spring, per discussions with CEO, Fred Waks.

Can’t come soon enough, it’s gonna be a treat to watch these towers go up from the vantage point of the O-Train - either line.
Reply With Quote
     
     
  #784  
Old Posted Jan 14, 2020, 2:28 PM
passwordisnt123 passwordisnt123 is offline
Registered User
 
Join Date: Mar 2015
Location: Ottawa (Centretown)
Posts: 643
Quote:
Originally Posted by Brannwagon View Post
https://obj.ca/article/room-lot-more-buildings-booming-ottawa-rental-market

New OBJ article says Trinity hopes to break ground on this project in the spring, per discussions with CEO, Fred Waks.

Can’t come soon enough, it’s gonna be a treat to watch these towers go up from the vantage point of the O-Train - either line.
Somebody at Trinity's legal or strategic communications department probably should have a little conversation with their CEO. This quote in that article above could get them in a touch of hot water with their lawsuit and countersuit against Melnyk and the Senators.

Quote:
“If I was to bring out Loretta and Gladstone at the exact same time as 900 (Albert), that would be a foolish endeavour,” Waks says. “You have to manage absorption.”
The issue of 900 Albert's impact on absorption is at the crux of the Melnyk lawsuit against Trinity. Previously Trinity had argued that 900 wouldn't impact absorption/profitability of Lebreton but this quote sounds like they're agreeing with Melnyk, or at least giving him some ammunition he can use against them.
Reply With Quote
     
     
  #785  
Old Posted Jan 14, 2020, 2:36 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,218
That makes Gladstone seem far off, unfortunately.
Reply With Quote
     
     
  #786  
Old Posted Jan 14, 2020, 4:49 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,594
Quote:
Originally Posted by passwordisnt123 View Post
Somebody at Trinity's legal or strategic communications department probably should have a little conversation with their CEO. This quote in that article above could get them in a touch of hot water with their lawsuit and countersuit against Melnyk and the Senators.



The issue of 900 Albert's impact on absorption is at the crux of the Melnyk lawsuit against Trinity. Previously Trinity had argued that 900 wouldn't impact absorption/profitability of Lebreton but this quote sounds like they're agreeing with Melnyk, or at least giving him some ammunition he can use against them.
Nice catch. You are absolutely right, this is definitely going to provide fodder for the lawsuit.
Reply With Quote
     
     
  #787  
Old Posted Jan 21, 2020, 3:40 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
Let's get these going, or at the very least, site prep going...
Reply With Quote
     
     
  #788  
Old Posted Mar 15, 2020, 4:03 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 367
New documents posted on the Devapps site dated February 2020.
No link because I cannot figure out how to cut and paste on a smart phone. Page 43 Site Plan Control search 900 Albert St.

Last edited by Marcus CLS; Mar 15, 2020 at 8:46 PM.
Reply With Quote
     
     
  #789  
Old Posted Mar 15, 2020, 5:06 PM
TheCanadianPatriot TheCanadianPatriot is offline
Registered User
 
Join Date: Oct 2014
Posts: 24
Quote:
Originally Posted by Marcus CLS View Post
New documents posted on the Devapps site dated February 2020.
Link? I'm having difficulty finding what you're referring to. Thanks in advance.
Reply With Quote
     
     
  #790  
Old Posted Mar 15, 2020, 8:59 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,893
Quote:
Originally Posted by TheCanadianPatriot View Post
Link? I'm having difficulty finding what you're referring to. Thanks in advance.
It's all right here:

https://app01.ottawa.ca/postingplans/appDetails.jsf?lang=en&appId=__0E83LN
Reply With Quote
     
     
  #791  
Old Posted Mar 15, 2020, 10:06 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,622
As of February 24, 2020:

239m, 203m, 110m | 65f, 56f, 24f



Reply With Quote
     
     
  #792  
Old Posted Mar 15, 2020, 10:25 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Does this mean they got rid of the pedestrian bridge between building 1 and 3?

Update: Never mind. Checked the other documents. The bridge is still there.
Reply With Quote
     
     
  #793  
Old Posted Mar 15, 2020, 11:27 PM
Proof Sheet Proof Sheet is offline
Registered User
 
Join Date: May 2009
Posts: 2,986
Quote:
Originally Posted by rocketphish View Post
As of February 24, 2020:

239m, 203m, 110m | 65f, 56f, 24f
Is there really a pent up demand for 145 levels of residential development in one location in the City? Not really sure where all of these people are coming from as high tech tends to be in the west end and government jobs don't really pull in people from outside of Ottawa to just work at a desk job in Ottawa.
Reply With Quote
     
     
  #794  
Old Posted Mar 15, 2020, 11:42 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,893
Quote:
Originally Posted by Proof Sheet View Post
Is there really a pent up demand for 145 levels of residential development in one location in the City? Not really sure where all of these people are coming from as high tech tends to be in the west end and government jobs don't really pull in people from outside of Ottawa to just work at a desk job in Ottawa.
I would say yes. These will be rentals and rentals are hot hot hot right now. This is the best location in the city, being at the juncture of two mass transit lines. I believe it will be very very successful.
Reply With Quote
     
     
  #795  
Old Posted Mar 16, 2020, 2:34 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,622
Quote:
Originally Posted by Proof Sheet View Post
Is there really a pent up demand for 145 levels of residential development in one location in the City? Not really sure where all of these people are coming from as high tech tends to be in the west end and government jobs don't really pull in people from outside of Ottawa to just work at a desk job in Ottawa.
61 + 51 floors of residential and 23 floors of office, according to the site plan above. But your question is still relevant.
Reply With Quote
     
     
  #796  
Old Posted Mar 16, 2020, 2:43 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,622
I just noticed that in the lower-left corner of the site, there is depicted an "Existing F.O. Shelter". A fall-out shelter?

And here it is on Streetview, with its own generator.
https://www.google.ca/maps/@45.408645,-7...diRcH-mWJjcxwyZ9PiO7A!2e0!7i16384!8i8192

Reply With Quote
     
     
  #797  
Old Posted Mar 16, 2020, 11:27 AM
Proof Sheet Proof Sheet is offline
Registered User
 
Join Date: May 2009
Posts: 2,986
Quote:
Originally Posted by rocketphish View Post
I just noticed that in the lower-left corner of the site, there is depicted an "Existing F.O. Shelter". A fall-out shelter?

And here it is on Streetview, with its own generator.
https://www.google.ca/maps/@45.408645,-7...diRcH-mWJjcxwyZ9PiO7A!2e0!7i16384!8i8192

Hey, that Streetview link had an LRT train in motion
Reply With Quote
     
     
  #798  
Old Posted Mar 16, 2020, 1:09 PM
TheCanadianPatriot TheCanadianPatriot is offline
Registered User
 
Join Date: Oct 2014
Posts: 24
Thanks for the link and images, Harley613 and rocketphish. Seems like pretty minor changes overall, however I obviously haven't gone through all of the documents to inspect every little detail. In response to Proof Sheet's question - here is an insightful article on the rental market in Ottawa: https://obj.ca/article/room-lot-more-buildings-booming-ottawa-rental-market

Cheers.
Reply With Quote
     
     
  #799  
Old Posted Mar 16, 2020, 11:36 PM
sgera sgera is offline
Registered User
 
Join Date: Apr 2002
Posts: 206
Quote:
Originally Posted by rocketphish View Post
I just noticed that in the lower-left corner of the site, there is depicted an "Existing F.O. Shelter". A fall-out shelter?

And here it is on Streetview, with its own generator.
https://www.google.ca/maps/@45.408645,-7...diRcH-mWJjcxwyZ9PiO7A!2e0!7i16384!8i8192

Very interesting - went back to historical satellite imagery and it was built between 1991-1999 so it’s not super old. Who knows what it leads to underneath! Diefenbunker closed in 1994 for reference.
Reply With Quote
     
     
  #800  
Old Posted Mar 16, 2020, 11:50 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 11:21 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.