Quote:
Originally Posted by Mac Write
I really our "SkyTrain" network is way way under built and we should have a huge network of lines by now.
|
I agree with the sentiment, but honestly Metro Vancouver has been extraordinarily successful at building out a fully grade-separated and automated rapid transit system from nothing to our current system moving more than half a million people daily in 35 years. Averaged out, we basically have continuously built and opened a new line or major extension about once every 7 years. I would sincerely love us to be further ahead than we are, with UBC and the North Shore already connected and the heavy lifting ahead of us being a Hastings subway and extensions of the existing system into the deeper suburbs (Langley, Tsawwassen, White Rock, etc.), but Metro Vancouver's really done a good job to date. Ideally, I would like us to shoot for a new line or major extension every 5 years, with one wholly new line taking 5-7 years and one major extension taking 3-5 years feeling like a good cadence and they could have overlap, too.