HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #1701  
Old Posted Jan 8, 2020, 7:47 AM
Bobert Bobert is offline
Registered User
 
Join Date: Feb 2016
Posts: 249
Dont really understand the AFB comments. If you drive over the AFB, you'll notice the lanes are right up against the cabling, with only the barrier in between.

There would be no point in a cantilever pedestrian section because the bigger problem is the placement of the cabling.
Reply With Quote
     
     
  #1702  
Old Posted Jan 8, 2020, 8:38 AM
Marshal Marshal is offline
perhaps . . .
 
Join Date: Dec 2015
Location: Vancouver
Posts: 1,493
Whether there is a point to it or not, they exist right now, right there, on the outside of the cables. The cable attachment fittings actually come up through the sidewalk decking/surface. They align with the edge of the main deck structure to which they are attached. The sidewalk deck is just an extension of (or from) the main bridge deck. It is cantelevered by virtue of being on the outside of the line of cable support.
Reply With Quote
     
     
  #1703  
Old Posted Jan 8, 2020, 10:17 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,790
BTW - the rendering seems to show a sidewalk viewing platform outside the towers, even in the initial configuration.

Reply With Quote
     
     
  #1704  
Old Posted Jan 8, 2020, 11:51 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,025
Bottom line is all this talk is useless until we get some more detailed renders and alignments.

Would love to see some clear drawings for both the north and south approaches.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #1705  
Old Posted Feb 11, 2020, 5:03 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,121
Contract awarded for new four-lane Pattullo Bridge replacement

BY RICHARD ZUSSMAN GLOBAL NEWS
Posted February 10, 2020



An artist's rendering of the new Pattullo Bridge. The environment and municipal affairs ministries announced Thursday they have granted the Ministry of Transportation an environment assessment certificate for the project, keeping it on track to start construction this year. Government of British Columbia

The B.C. government has hired Fraser Crossing Partners to replace the aging Pattullo Bridge with a new crossing between Surrey and New Westminster.


The company came in with the province’s preferred contract and is committed to building the span for $967.5 million.

“People in the Lower Mainland depend on the Pattullo Bridge every day, and they deserve safe, easy, toll-free commutes,” B.C. Premier John Horgan said.

“The current bridge has needed to be replaced for years, and I’m proud our government is getting it done in a way that benefits the local community with good jobs and training opportunities. This is all part of our work to keep people and goods moving as we build a strong, sustainable B.C.”

The entire project will cost nearly $1.4 billion.

...

https://globalnews.ca/news/6532634/pattullo-bridge-replacement-contract/
__________________
belowitall
Reply With Quote
     
     
  #1706  
Old Posted Feb 11, 2020, 5:40 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
There's a seeming contention over the planned width of 4 lanes. Stating that it can go to 6 lanes if necessary, would it not be better to build for 6 now? Isn't that underbuilding it?
Reply With Quote
     
     
  #1707  
Old Posted Feb 11, 2020, 5:45 AM
Sheba Sheba is online now
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by trofirhen View Post
There's a seeming contention over the planned width of 4 lanes. Stating that it can go to 6 lanes if necessary, would it not be better to build for 6 now? Isn't that underbuilding it?
Again...
Quote:
Originally Posted by Sheba View Post
You've asked these questions before and people have answered you. New West doesn't currently have enough roadspace for it to open with six lanes - so they're opening it with four and the outer two lanes will initially be used for pedestrians and cyclists. Later they'll build a separate section for peds and bikes, cantilevered on the outside, and the outer lanes will be car lanes. Images of this have been posted.
Reply With Quote
     
     
  #1708  
Old Posted Feb 11, 2020, 6:39 AM
Xrayal's Avatar
Xrayal Xrayal is offline
Registered User
 
Join Date: Jul 2008
Location: New Westminster
Posts: 174
Reply With Quote
     
     
  #1709  
Old Posted Feb 11, 2020, 7:03 AM
djmk's Avatar
djmk djmk is offline
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,817
Quote:
Originally Posted by SpongeG View Post
Contract awarded for new four-lane Pattullo Bridge replacement

BY RICHARD ZUSSMAN GLOBAL NEWS
Posted February 10, 2020



An artist's rendering of the new Pattullo Bridge. The environment and municipal affairs ministries announced Thursday they have granted the Ministry of Transportation an environment assessment certificate for the project, keeping it on track to start construction this year. Government of British Columbia

The B.C. government has hired Fraser Crossing Partners to replace the aging Pattullo Bridge with a new crossing between Surrey and New Westminster.


The company came in with the province’s preferred contract and is committed to building the span for $967.5 million.

“People in the Lower Mainland depend on the Pattullo Bridge every day, and they deserve safe, easy, toll-free commutes,” B.C. Premier John Horgan said.

“The current bridge has needed to be replaced for years, and I’m proud our government is getting it done in a way that benefits the local community with good jobs and training opportunities. This is all part of our work to keep people and goods moving as we build a strong, sustainable B.C.”

The entire project will cost nearly $1.4 billion.

...

https://globalnews.ca/news/6532634/pattullo-bridge-replacement-contract/
Another quote from the article

"The bridge replacement will be built under the province’s Community Benefits Agreement (CBA), which prioritizes hiring local workers, including Indigenous peoples, women, people with disabilities and other under-represented groups who are qualified to do the work. Horgan says the agreement will mean the project could be as much as four per cent more expensive than without a CBA, but the bid still came in below original budget projections."

Although I applaud the initiative but that's about $56 million

I don't know what to think about that. And I'm curious why it would cost more to hire from different groups.
__________________
i have no idea what's going on
Reply With Quote
     
     
  #1710  
Old Posted Feb 11, 2020, 7:25 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,804
Quote:
Originally Posted by Sheba View Post
New West doesn't currently have enough roadspace for it to open with six lanes - so they're opening it with four and the outer two lanes will initially be used for pedestrians and cyclists.
That's actually disingenuous. There's plenty of roadspace in New Westminster to handle a six lane bridge - four lanes that connect with McBride and two on/off ramps (one in each direction) that connect to Columbia/Royal Avenue.

The real reason is that New Westminster doesn't want the vehicle traffic. They're treating the Patullo bridge exactly the same way they treated the Brunette River bridge between Braid St. and United Blvd. They refused to allow any upgrades to that pathetic 1-lane bailey bridge for almost 20 years.
Reply With Quote
     
     
  #1711  
Old Posted Feb 11, 2020, 4:47 PM
interrobang interrobang is offline
Registered User
 
Join Date: Nov 2017
Location: North Vancouver
Posts: 22
Quote:
Originally Posted by djmk View Post

Although I applaud the initiative but that's about $56 million

I don't know what to think about that. And I'm curious why it would cost more to hire from different groups.
The CBA means that workers will be paid union rates and applicable dues and burdens. It results in a more expensive package. The union rates can be more than market rates. Another way to look at it, is the CBA ensures there is a minimum pay applicable to all trades workers on the project
Reply With Quote
     
     
  #1712  
Old Posted Feb 11, 2020, 4:49 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,730
Quote:
Originally Posted by aberdeen5698 View Post
That's actually disingenuous. There's plenty of roadspace in New Westminster to handle a six lane bridge - four lanes that connect with McBride and two on/off ramps (one in each direction) that connect to Columbia/Royal Avenue.

The real reason is that New Westminster doesn't want the vehicle traffic. They're treating the Patullo bridge exactly the same way they treated the Brunette River bridge between Braid St. and United Blvd. They refused to allow any upgrades to that pathetic 1-lane bailey bridge for almost 20 years.
A city that's got bad traffic doesn't want more car traffic entering it. Shocking.
Reply With Quote
     
     
  #1713  
Old Posted Feb 11, 2020, 5:24 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,728
The CBA also explicitly requires the hiring and apprenticing of under-represented demographics in the trades (women, indigenous, at-risk youth, etc.). I personally don't have an issue with the concept of the program, though I don't fully understand how it works in practice since it seems like the CBA office(?) does the hiring/employing? I imagine that is for the under-represented demographics, though. Essentially, the CBA office (?) is a labour sub-contractor to the prime, which itself is under an obligation to pay prevailing wages and utilize unionized labour (unless when essential skills are unavailable otherwise).
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #1714  
Old Posted Feb 11, 2020, 7:23 PM
cairnstone cairnstone is offline
Registered User
 
Join Date: Jan 2010
Posts: 1,026
Quote:
Originally Posted by SFUVancouver View Post
The CBA also explicitly requires the hiring and apprenticing of under-represented demographics in the trades (women, indigenous, at-risk youth, etc.). I personally don't have an issue with the concept of the program, though I don't fully understand how it works in practice since it seems like the CBA office(?) does the hiring/employing? I imagine that is for the under-represented demographics, though. Essentially, the CBA office (?) is a labour sub-contractor to the prime, which itself is under an obligation to pay prevailing wages and utilize unionized labour (unless when essential skills are unavailable otherwise).
The CBA is just a kick back to the trade unions. And makes everything an even playing field. Half of the companies that will be doing the work are already building trade unions. The actual rate paid currently is not much different between union and non union. Where the savings is on the lower skilled trades. You wont see the use of temp labour companies. When we last had a big push for infrastructure the main proponent was union on one project and favored union sub trades.

Last time there was a CBA agreement most non union workers got a raise and there rates stayed high where as the union sector took a pay cut as the rates were based on a blend of both.
Reply With Quote
     
     
  #1715  
Old Posted Feb 11, 2020, 8:38 PM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
Quote:
Originally Posted by CanSpice View Post
A city that's got bad traffic doesn't want more car traffic entering it. Shocking.
Or maybe the improved infrastructure would remove bad traffic and benefit everyone, including the environment? It's not like people in New Westminster don't own cars and drive. I have actually never seen data suggesting that car ownership would be any lower there.

With the region and New Westminster growing fast, there is nobody benefitting from not doing anything to cope with growth. One cannot stop progress.
Reply With Quote
     
     
  #1716  
Old Posted Feb 11, 2020, 8:46 PM
Bdawe Bdawe is offline
Registered User
 
Join Date: Aug 2015
Location: The West End
Posts: 535
Quote:
Originally Posted by Klazu View Post
Or maybe the improved infrastructure would remove bad traffic and benefit everyone, including the environment? It's not like people in New Westminster don't own cars and drive. I have actually never seen data suggesting that car ownership would be any lower there.

With the region and New Westminster growing fast, there is nobody benefitting from not doing anything to cope with growth. One cannot stop progress.
In this comment, I think you have incorrectly conflated 'coping with growth' and 'coping with increasing volumes of cars'

We can and should separate those two and do what we can for the former while absolutely discouraging the later. Lots of people, for instance people with lungs, benefit by this
Reply With Quote
     
     
  #1717  
Old Posted Feb 11, 2020, 9:09 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,121
Letter: Burnaby will suffer from the new Pattullo Bridge

Nathan Davidowicz / Burnaby Now
FEBRUARY 11, 2020


https://www.burnabynow.com/opinion/your-...-from-the-new-pattullo-bridge-1.24073435

I've always thought a tunnel would be a good idea, expensive but...

Letter: A tunnel should link new Pattullo and Highway 1
Nathan Davidowicz / New West Record
FEBRUARY 11, 2020


https://www.newwestrecord.ca/opinion/let...nk-new-pattullo-and-highway-1-1.24073437
__________________
belowitall
Reply With Quote
     
     
  #1718  
Old Posted Feb 11, 2020, 10:16 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,055
Quote:
Originally Posted by SpongeG View Post
Letter: Burnaby will suffer from the new Pattullo Bridge

Nathan Davidowicz / Burnaby Now
FEBRUARY 11, 2020


https://www.burnabynow.com/opinion/your-...-from-the-new-pattullo-bridge-1.24073435

I've always thought a tunnel would be a good idea, expensive but...

Letter: A tunnel should link new Pattullo and Highway 1
Nathan Davidowicz / New West Record
FEBRUARY 11, 2020


https://www.newwestrecord.ca/opinion/let...nk-new-pattullo-and-highway-1-1.24073437
It seems unfortunate that tunnel proposals are usually precluded by their high cost. In European cities, and in some North American cities, tunnels are effective in traffic management.
Reply With Quote
     
     
  #1719  
Old Posted Feb 11, 2020, 11:00 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,790
Quote:
Originally Posted by Xrayal View Post
Thanks!

Looks like an uneven load, like this, but mundane.


https://www.google.com/url?sa=i&url=http...CA0QjhxqFwoTCJCb2uHMyucCFQAAAAAdAAAAABAk
Reply With Quote
     
     
  #1720  
Old Posted Feb 11, 2020, 11:02 PM
EastVanMark EastVanMark is offline
Registered User
 
Join Date: Oct 2006
Posts: 1,610
Quote:
Originally Posted by Klazu View Post
One cannot stop progress.
New West will try its hardest to do just that
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:38 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.