  #20981  
Old Posted Jan 22, 2020, 2:00 AM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Quote:
Originally Posted by teriyaki View Post
Haven't been in town to catch the new trains. They mention that there are some minor changes aside from the Air Conditioning, anyone know what those look like? I'm a sucker for tiny details like that. Can tell from the picture that there looks like LED headlights on the new trainset?
Probably the same lights, it just looks like LED lights because of the photo.
     
     
  #20982  
Old Posted Jan 22, 2020, 2:03 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by teriyaki View Post
Haven't been in town to catch the new trains. They mention that there are some minor changes aside from the Air Conditioning, anyone know what those look like? I'm a sucker for tiny details like that. Can tell from the picture that there looks like LED headlights on the new trainset?
Quote:
Originally Posted by jollyburger View Post
Probably the same lights, it just looks like LED lights because of the photo.
they looked LED when i saw them in person. i believe that is one change. i think some seating arraignment is another.
     
     
  #20983  
Old Posted Jan 22, 2020, 2:04 AM
ilikeredheads ilikeredheads is offline
 
Join Date: Sep 2016
Posts: 652
the new sets have black exterior window frames while the old ones have grey.
     
     
  #20984  
Old Posted Jan 22, 2020, 2:25 AM
logan5's Avatar
logan5 logan5 is offline
 
Join Date: Feb 2011
Posts: 8,196
Quote:
Originally Posted by cairnstone View Post
It will happen as the population growth around brighouse is huge. Also its already listed on translinks 15 year plan. It wont be a impossible. just will require piers to span to the center of 3 road. and a station that would span both sides.

The bus loop is being worked on as we speak.

There is a number of 600 plus unit projects all south of westminister highway. So over the next 10 years or so will see over 1000 people move into dt richmond
I realize Richmond is booming, but will that short section between Brighouse and Bridgeport ever exceed 7500 pph, which is what that section can handle with a single track. The busiest section on the Expo Line is at 15 000 pph (or a bit more?), and that's drawing from a much much larger customer base.

If a double track is required at Brighouse, that would mean the rest of the Canada Line heading into dt Vancouver would be very overcrowded,and we would be looking at a DT relief line.
     
     
  #20985  
Old Posted Jan 22, 2020, 2:43 AM
bardak bardak is offline
 
Join Date: Oct 2010
Posts: 370
What is the max headway on the richmond stub anyways? What would be the round trip travel time between Lansdowne and Richmond-Bridgport excluding dwell times? Do the trains even run maximum operational speed between the two stations?

Assuming that 90 seconds is the max operational frequency on the main line the Richmond branch would ideally operate at 180 seconds or 3 minutes. how close can to that can they get with the single tracking?
     
     
  #20986  
Old Posted Jan 22, 2020, 3:25 AM
Express691 Express691 is offline
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by ilikeredheads View Post
the new sets have black exterior window frames while the old ones have grey.
LED headlights too, which are much noticeably whiter and brighter than the older units.
     
     
  #20987  
Old Posted Jan 22, 2020, 3:26 AM
TransitJack TransitJack is offline
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by Express691 View Post
LED headlights too, which are much noticeably whiter and brighter than the older units.
The originals were also black, but seemed to have faded over time.

New LED headlights are easy to tell when not illuminated.
     
     
  #20988  
Old Posted Jan 22, 2020, 3:57 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,190
Quote:
Originally Posted by bardak View Post
Do the trains even run maximum operational speed between the two stations?
Other posters have observed that the trains are intentionally running slow to compensate for three missing stations; once Capstan gets built, they'll speed up.
     
     
  #20989  
Old Posted Jan 22, 2020, 4:01 AM
s211 s211 is offline
 
Join Date: Oct 2008
Posts: 8,519
Please God, tell me they also have air fresheners, to counter all of the great unwashed masses that think mass transit is their habitat.
     
     
  #20990  
Old Posted Jan 22, 2020, 4:51 AM
SpongeG's Avatar
SpongeG SpongeG is offline
 
Join Date: Jun 2006
Posts: 40,135
Canada Line wayfinding signage at YVR Airport Station upgraded for tourists

Kenneth Chan | Jan 21 2020


New wayfinding signage at YVR Airport Station. (TransLink)

New wayfinding signage at the Canada Line’s YVR Airport Station now better informs tourists unfamiliar with TransLink’s public transit system on how to get around.

According to a new post on TransLink’s The Buzzer, staff with Vancouver International Airport and the public transit authority collaborated on the improved signage to help riders determine what transit fare they need and how to pay for it.

The improvements include bilingual signage informing the ability to “Tap to Pay” using contactless Visa, Mastercard, and American Express credit cards, which allows riders to skip the lines for the Compass Vending Machines.



New maps also have colour-coded fare zones, and there is even signage with fares to popular tourist destinations such as McArthurGlen Vancouver Airport Outlet Mall, ferry terminals, and cruise ship terminals.

New wayfinding signage at YVR Airport Station. (TransLink)

...

https://dailyhive.com/vancouver/canada-line-yvr-airport-station-wayfinding
     
     
  #20991  
Old Posted Jan 22, 2020, 5:08 AM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Quote:
Originally Posted by Express691 View Post
LED headlights too, which are much noticeably whiter and brighter than the older units.
Aren't the lights in this older train also LED? Photo taken in 2018

https://www.flickr.com/photos/avgeekjoe/26278667777
     
     
  #20992  
Old Posted Jan 22, 2020, 5:12 AM
Aroundtheworld Aroundtheworld is offline
 
Join Date: Oct 2013
Posts: 623
Quote:
Originally Posted by bardak View Post

Assuming that 90 seconds is the max operational frequency on the main line the Richmond branch would ideally operate at 180 seconds or 3 minutes. how close can to that can they get with the single tracking?
The single-track was designed to allow for a 3-minute frequency. Capacity can also be increased by extending the vehicles 10m by adding a C-car.
     
     
  #20993  
Old Posted Jan 22, 2020, 5:14 AM
ilikeredheads ilikeredheads is offline
 
Join Date: Sep 2016
Posts: 652
I like how the new YVR signs says Burnaby and New West is a 2 zone fare, even though that's only true if you take the Canada Line to Vancouver. Just get off at Bridgeport and take the 430, and it's faster since you dont' have to go all the way to Waterfront/Granville
     
     
  #20994  
Old Posted Jan 22, 2020, 6:25 AM
kxl kxl is offline
 
Join Date: Dec 2015
Posts: 9
Quote:
Originally Posted by ilikeredheads View Post
I like how the new YVR signs says Burnaby and New West is a 2 zone fare, even though that's only true if you take the Canada Line to Vancouver. Just get off at Bridgeport and take the 430, and it's faster since you dont' have to go all the way to Waterfront/Granville
Similarly, one zone fare to Surrey: Canada Line to Brighouse, transfer to 301.
     
     
  #20995  
Old Posted Jan 22, 2020, 7:44 PM
TransitFreak TransitFreak is offline
 
Join Date: Oct 2009
Posts: 194
Quote:
Originally Posted by officedweller View Post
I've mentioned this before, but the real solution is to move the bus loop/routes to terminate at Lansdowne Station, effectively making that double-track station the defacto terminus/ transfer point with most trains short-turning there (allowing higher frequency) and only sending some trains down to Brighouse.
Agreed - you could run Brighouse every 6 minutes, run Lansdowne every 4 minutes, and YVR every 6 minutes - that would make for 2 min headways on the trunk line. Given current and future development around Lansdowne, that would be needed to provide an empty train there.

Thinking further down the road, when 2nd YVR station gets built, you can then run 1.5 min headways, and employ same tactic. From Waterfront have YVR2/Lansdowne/YVR/Richmond-Brighouse terminus sequenced trains to basically double up capacity short of single track terminus station.
     
     
  #20996  
Old Posted Jan 22, 2020, 8:01 PM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,833
The only issue with short-turning at YVR2 is that it would be inconvenient for domestic travellers and might confuse out-of-towners.
     
     
  #20997  
Old Posted Jan 22, 2020, 8:34 PM
TransitFreak TransitFreak is offline
 
Join Date: Oct 2009
Posts: 194
Could be - at that point though, there could be an argument that the extra capacity is needed for US/International every three minutes, and the original YVR gets defaulted to serve domestic, and demand there isn't as much. It would be cool though to see Waterfront have trains arriving and departing every 90 seconds - hope those switches hold up!
     
     
  #20998  
Old Posted Jan 22, 2020, 10:29 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
I guess it makes no sense (?) to do extend Brighouse south as a single track and loop back tying back into Lansdowne.

Maybe down to Granville, up to Kwantlen..
     
     
  #20999  
Old Posted Jan 22, 2020, 10:47 PM
Sheba Sheba is offline
 
Join Date: Jan 2015
Posts: 4,598
Quote:
Originally Posted by jollyburger View Post
I guess it makes no sense (?) to do extend Brighouse south as a single track and loop back tying back into Lansdowne.

Maybe down to Granville, up to Kwantlen..
...and turn it into a one-way monorail loop??? That would likely cost more than double tracking the final section (esp if you add any stations to this monorail).
     
     
  #21000  
Old Posted Jan 23, 2020, 12:24 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,833
That would also kill possible expansion to Steveston (I don't think it is realistic to cross the Fraser with it).
Richmond needs to figure out a corridor to Steveston that could be densified to support Canada Line.
Granville and Railway seems like the obvious route.
Alternatively, develop a streetcar or LRT plan as local feeder routes.
In the meanwhile, they should have a rapid bus as a precursor.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:53 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.