I walked along Booth yesterday. As of right now, they have the following:
Block 13 - done (6-floor residential)
Block 05 - done (sales centre)
Blocks 02 and 03 - almost done (2-floor commercial)
Block 205A - almost done (6-floor residential)
Block 10 - digging the foundation
Block 211 - crane just went up
Block 208 - steel frame is done
Block map for reference: