  #561  
Old Posted Jan 7, 2020, 8:17 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,738
Quote:
Originally Posted by domusile View Post
What is the purpose of this pit?
I think they're just shoring up the foundation.
Reply With Quote
     
     
  #562  
Old Posted Jan 7, 2020, 9:18 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,738
Quote:
Originally Posted by jollyburger View Post
I think they're just shoring up the foundation.
Way too big just for a foundation with basically a plaza on top. I have a feeling that would be room for various amenities or other purposes.

An underground mall or food court would be sweet, although not at all likely. Better still is to have tunnel links to the library and the new office building beside the Centre. Again I'm dreaming.
Reply With Quote
     
     
  #563  
Old Posted Jan 22, 2020, 3:39 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,738
Quote:
January 10, 2020 – For the next two weeks:​
Excavation and shoring for the East side of Georgia Plaza will be complete.
Foundations in the West Georgia Plaza will continue.
Concrete stairwell and elevator walls will be placed on the North Tower.
Underslab plumbing rough in will continue for the North Tower.
Backfill for the North Tower slab on grade will continue until the end of January.
Concrete slabs for the lowest parking level on the North Tower will be placed.
The circular ramp slabs for level 5 and 6 parking will continue.
Steel and concrete structure for the Retail Plaza areas will continue.
Level 2 floor slabs (corner of Hamilton and West Georgia Streets) will be placed.
The Hamilton Street sidewalk adjacent to the building will be closed for the duration of the project.
The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 5:30 pm (Monday – Saturday).
The Homer Street curb lane will be used intermittently during the day for deliveries.
All activities are executed within the parameters of the City of Vancouver’s building bylaws.
https://www.thepostnews.ca/
Reply With Quote
     
     
  #564  
Old Posted Jan 31, 2020, 5:47 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Jan.30 '20, my pic
Reply With Quote
     
     
  #565  
Old Posted Jan 31, 2020, 5:52 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
That's a lot of space under those stairs.
Could be for kitchens and storage for restaurants above?
Reply With Quote
     
     
  #566  
Old Posted Jan 31, 2020, 6:38 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,738
L2 is the main ground level.

L1 has a F&B space on the Hamilton/Georgia corner but the rest of that end of the building is the mechnical room. The F&B doesn't look like it connected in any way to the restaurant above.

https://rezoning.vancouver.ca/applications/349wgeorgia/documents/9FloorPlansPodiumLevels.pdf

Underground it seems like there's a mix of parking and ramps for residential units. There's 7500 sq feet of office storage down on L3 but it only seems to have two staircases leading down to it.

https://rezoning.vancouver.ca/applications/349wgeorgia/documents/8UndergroundParkingPlans.pdf
Reply With Quote
     
     
  #567  
Old Posted Jan 31, 2020, 7:38 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
Thanks!
That would be the parking levels with the solid wall to the side and mechanical starting here there are columns.
Reply With Quote
     
     
  #568  
Old Posted Jan 31, 2020, 11:27 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,738
Quote:
Originally Posted by officedweller View Post
Thanks!
That would be the parking levels with the solid wall to the side and mechanical starting here there are columns.
But do those columns in the pit mean they've bottomed out? I thought they would need to go down at least two more levels.
Reply With Quote
     
     
  #569  
Old Posted Jan 31, 2020, 11:47 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
Yeah, that means it has bottomed out.
The pit looks deeper on the QE Theatre side than the Homer side based on the height of people at the far end and the garage access opening.
(ie it looks like 3 levels can fit at the far end, but the near end is questionable, but it could be the angle of the photo)
Could be that the floor is sloped(?)
Reply With Quote
     
     
  #570  
Old Posted Feb 1, 2020, 12:34 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,738
Quote:
Originally Posted by officedweller View Post
Yeah, that means it has bottomed out.
The pit looks deeper on the QE Theatre side than the Homer side based on the height of people at the far end and the garage access opening.
(ie it looks like 3 levels can fit at the far end, but the near end is questionable, but it could be the angle of the photo)
Could be that the floor is sloped(?)
Actually the updated architectural drawings from 2017 has no P3 parking just the office storage.

https://rezoning.vancouver.ca/applicatio...s/07-AppendixA-Architecturaldrawings.pdf

Maybe those columns are the base of the floor for P2?
Reply With Quote
     
     
  #571  
Old Posted Feb 3, 2020, 10:32 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
That would explain why there's only one access opening at the far end (ie none on the level below).

*********

Some pics by Roundabout at SRC show the new tower columns buttressing the old columns at the Hamilton & Georgia corner:
https://skyrisecities.com/forum/threads/...dreal-mcm-partnership.26554/post-1525876
Reply With Quote
     
     
  #572  
Old Posted Feb 3, 2020, 10:00 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
Pic by me today - you can see the new tower columns buttressed up against the old ones,
as well as the new core and columns rising inside.

Reply With Quote
     
     
  #573  
Old Posted Feb 10, 2020, 12:53 PM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Feb.9 '20, my pics








Reply With Quote
     
     
  #574  
Old Posted Feb 11, 2020, 9:19 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Feb.10 '20, my pic
Reply With Quote
     
     
  #575  
Old Posted Feb 22, 2020, 8:47 PM
Otis_Van Otis_Van is offline
Registered User
 
Join Date: Mar 2011
Location: Vancouver BC
Posts: 145
Interior shots from street level (my pictures, today).



Reply With Quote
     
     
  #576  
Old Posted Mar 9, 2020, 3:37 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
It was very sunny today.





Reply With Quote
     
     
  #577  
Old Posted Mar 10, 2020, 9:21 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Some views from the Homer Street side. Last pic is the Dunsmuir Street side.




March 9 '20, my pics


























Reply With Quote
     
     
  #578  
Old Posted Mar 14, 2020, 1:44 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
Pics by me today:





Reply With Quote
     
     
  #579  
Old Posted Mar 24, 2020, 12:10 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
Quote:
Construction Updates

March 20, 2020 – For the next two weeks:​
  • Level 1 suspended slab will be complete in the West Georgia Plaza
  • Level 2 (street level) slab forming will be underway in the West Georgia Plaza
  • Slab on grade for the interior of the building will be complete
  • Concrete stairwell and elevator walls will be commence above Level 1 in the North Tower
  • Level 1 concrete slab will be complete in most of the North Tower
  • Forming of Level 3 in the North Tower will commence
  • The circular ramp slabs for parking levels 5 and 6 will be complete to the fourth floor
  • Level 3 floor slabs will be complete in the South Tower
  • Level 4 floor slabs will be placed in the South Tower
  • Level 5 columns will start to be placed
  • Truss installation at the future loading down area will be complete
  • Miscellaneous concrete demolition will continue throughout the building
  • The Hamilton Street sidewalk adjacent to the building will be closed for the duration of the project
  • The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 5:30 pm (Monday – Saturday)
  • The Homer Street curb lane will be used intermittently during the day for deliveries
  • All activities are executed within the parameters of the City of Vancouver’s building bylaws
https://www.thepostnews.ca/
Reply With Quote
     
     
  #580  
Old Posted Apr 21, 2020, 4:50 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
By City of Rain April 11th:

Quote:
Originally Posted by City Of Rain, post: 1549184, member: 70034
Part 1

177 by Hung Lam, on Flickr
185 by Hung Lam, on Flickr
187 by Hung Lam, on Flickr
211 by Hung Lam, on Flickr
214 by Hung Lam, on Flickr
216 by Hung Lam, on Flickr
218 by Hung Lam, on Flickr
220 by Hung Lam, on Flickr
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 7:12 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.