Quote:
Originally Posted by MrSlippery519 View Post
For some reason I thought there was at least 1 secured tenant for the 4 story office building but now I am questioning myself.
Apparently the Physio office I referred to above is in the front Sifton building. My wife has been going there a few months now and says it's not in the new building.
Reply With Quote
     
     
  #122  
Old Posted Sep 16, 2019, 3:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Forming for the ground level slab pour underway on retirement building.
Reply With Quote
     
     
  #123  
Old Posted Sep 26, 2019, 4:39 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Ground level concrete slab pour today on the west side of retirement home. Nearly done brick veneer on east side of apartment building. Still have south and west sides to do for brick veneer.
Reply With Quote
     
     
  #124  
Old Posted Oct 10, 2019, 6:54 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Progress on ground level concrete slab pours continuing. some ground floor concrete walls now poured as well on the retirement home.
Reply With Quote
     
     
  #125  
Old Posted Oct 16, 2019, 10:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Structural steel posts for first floor being installed on retirement home.
Reply With Quote
     
     
  #126  
Old Posted Oct 30, 2019, 5:39 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Installing 2nd fl concrete slabs in retirement home. Work on exterior brick of apt building has really slowed down for some reason.
Reply With Quote
     
     
  #127  
Old Posted Nov 14, 2019, 4:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Must of squeezed in the remaining ground floor concrete slab pour on east side of retirement home between snow falls.
Reply With Quote
     
     
  #128  
Old Posted Nov 21, 2019, 8:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Forming 2nd floor stairwells and elevator shafts now on retirement home. Not sure how many floors this is planned to be?
Reply With Quote
     
     
  #129  
Old Posted Nov 21, 2019, 10:41 PM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,287
Looks like it's 2 L-shaped buildings maybe 6 floors? Hard to tell in this picture from a couple years ago. Not sure if this is out of date now though. Bottom right.

Reply With Quote
     
     
  #130  
Old Posted Dec 1, 2019, 8:04 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Based on what they have now the 2 L shaped building design is not the plan. They now have some of the 3rd floor slabs installed for the retirement home. They also have restarted the exterior brick installation on apt building. Why they stopped for a couple of months is a mystery thou?
Reply With Quote
     
     
  #131  
Old Posted Dec 12, 2019, 9:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Pouring some of the 3rd floor stairwell walls today and installing some of the 3rd floor steel posts.
Reply With Quote
     
     
  #132  
Old Posted Dec 12, 2019, 11:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Reply With Quote
     
     
  #133  
Old Posted Jan 6, 2020, 7:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Setting some of the 4th floor concrete slabs today on retirement home. Very slow progress on exterior of 10s apartment. Website talks about May 2020 for tenants. Also lists prices. 3 bedroom for $2700/month.
Reply With Quote
     
     
  #134  
Old Posted Jan 7, 2020, 4:01 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
Quote:
Originally Posted by jammer139 View Post
Setting some of the 4th floor concrete slabs today on retirement home. Very slow progress on exterior of 10s apartment. Website talks about May 2020 for tenants. Also lists prices. 3 bedroom for $2700/month.
Wow that is a $500,000+ mortgage basically, I wonder if there are any condo fee's on top of that.
Reply With Quote
     
     
  #135  
Old Posted Jan 8, 2020, 9:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
It appears to be a rental apartment building. Doesn't mean they might convert to condo's in the future but for now it looks like they will rent.



Quote:
Originally Posted by MrSlippery519 View Post
Wow that is a $500,000+ mortgage basically, I wonder if there are any condo fee's on top of that.
Reply With Quote
     
     
  #136  
Old Posted Jan 13, 2020, 2:57 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Forming for 4th floor stairwell and elevator shafts now.
Reply With Quote
     
     
  #137  
Old Posted Jan 21, 2020, 9:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Hayman has plan posted for the retirement building now under construction.


Will be 8 floors including penthouse. Definitely different from the West 5 drawings showing 2 L shaped buildings in that location.


http://haymanconstruction.com/HR-Sfiton-West-5-Retirement-Living-Ph1.htm
Reply With Quote
     
     
  #138  
Old Posted Jan 22, 2020, 3:15 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
Wow was not expecting these to be 8 floors, people were complaining about the original 5 that was proposed.

Personally I am all for it (live in the area)
Reply With Quote
     
     
  #139  
Old Posted Jan 27, 2020, 5:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Some of the 5th floor concrete slabs now installed. Wall panels now started up to 2nd floor.
Reply With Quote
     
     
  #140  
Old Posted Jan 31, 2020, 7:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,276
Nearly done 5th floor slab and have some forms up for the elevator and stairwells.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 10:45 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.