HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 20, 2019, 4:48 AM
murfnut murfnut is offline
Registered User
 
Join Date: Dec 2018
Posts: 130
Quote:
Originally Posted by freerover View Post
Just don't sticky another thread.

I think the domain and broad more will feel more connected after the corridor project and you have 9 feet of shared used paths on each side and grass instead of ditches. It'll look like a more urban road instead of a rural highway.

On the subject of the corridor projects, here are the designs for the 2 early out projects for Burnet. The breaker project is scheduled to start next year and Koenig in Fall 2021. Looks like certain improvements will have to wait until the entire corridor contracts go out.


Are they really going to work on Braker burnet intersection next year the same time as they start tearing up for domain tower 3 and the same time Starbucks is getting built and the same time ibm and indeed have only one option in to work via westbound Braker,

We need the upgrade but that will be a major mess to deal with, it’s bad enough right now,
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 6:36 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.