  #13161  
Old Posted Nov 11, 2019, 3:12 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Quote:
Originally Posted by J.OT13 View Post
Ottawa O-Train. In red and green are the existing and Stage 2 lines (2001-2025), totaling 64 kilometers and 41 stations.

In orange (Barrhaven, 10 km and 7 stations) and purple (Kanata, 11 km, 8 stations) are Stage 3. If all goes according to plan, the entire network as currently invisioned should be completed by 2030, assuming a non-stop building phase. The network would total 85 kilometers and 56 stations.


https://www.otrainfans.ca/forum/topic/29...-steps/page/2/?tab=comments#comment-1674
The Barrhaven and Kanata extensions are up in the air, IMO. Funding for them might not arrive, especially as the city is insistent that the provincial & federal governments fund them entirely. While this is a fair request given the city paid a lot more than one-third for the first two phases, I think it will fall on deaf ears.

Also, I highly doubt the last half of the Kanata line will be built. The business case falls apart dramatically as you go past Terry Fox.

Last edited by CityTech; Nov 11, 2019 at 3:26 PM.
     
     
  #13162  
Old Posted Nov 11, 2019, 3:25 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by lrt's friend View Post
One wonders given the number of failures during the first two months of operation and it doesn't seem to be improving much.
The availability rate is on par/just slightly below other Canadian metro systems though. There were many more outages in Montréal in the last week than in Ottawa but people are just used to it. It really shows the issue of having only one trunk line downtown versus two.
     
     
  #13163  
Old Posted Nov 11, 2019, 3:27 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
I did read that Ottawa's Line 1 has so far exceeded (and not by a small margin) the availability rate of TTC Line 1.
     
     
  #13164  
Old Posted Nov 11, 2019, 4:50 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by CityTech View Post
The Barrhaven and Kanata extensions are up in the air, IMO. Funding for them might not arrive, especially as the city is insistent that the provincial & federal governments fund them entirely. While this is a fair request given the city paid a lot more than one-third for the first two phases, I think it will fall on deaf ears.

Also, I highly doubt the last half of the Kanata line will be built. The business case falls apart dramatically as you go past Terry Fox.
I don't necessarily agree with the entire project as proposed, but the business case has little to do with the chances of this getting built. It's all political posturing. The southern and western suburbs can be considered battlegrounds, therefore it's in the interest of both the Conservatives and Liberals to support these extensions.
     
     
  #13165  
Old Posted Nov 11, 2019, 5:02 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by p_xavier View Post
The availability rate is on par/just slightly below other Canadian metro systems though. There were many more outages in Montréal in the last week than in Ottawa but people are just used to it. It really shows the issue of having only one trunk line downtown versus two.
I have commented about lack of redundancy on the Ottawa board for quite some time. We could have had a second line through downtown but killed it in 2006.

How do Montrealers deal with subway closures? It has been chaotic in Ottawa because most people can't get to their destinations on-time when their is a shutdown. Instead of beefing up parallel services, they cut almost all of them making it very difficult to enter or exit downtown Ottawa without using the Confederation Line.
     
     
  #13166  
Old Posted Nov 11, 2019, 6:05 PM
White Pine White Pine is offline
Registered User
 
Join Date: Jan 2010
Posts: 398
Quote:
Originally Posted by lrt's friend View Post
I have commented about lack of redundancy on the Ottawa board for quite some time. We could have had a second line through downtown but killed it in 2006.

How do Montrealers deal with subway closures? It has been chaotic in Ottawa because most people can't get to their destinations on-time when their is a shutdown. Instead of beefing up parallel services, they cut almost all of them making it very difficult to enter or exit downtown Ottawa without using the Confederation Line.
At risk of beating this to death, The two lines were never proposed concurrently, and so we would not have had two lines. we would have had a stupid little streetcar through downtown and a line of buses with most of the city in tow.
     
     
  #13167  
Old Posted Nov 11, 2019, 6:17 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by White Pine View Post
At risk of beating this to death, The two lines were never proposed concurrently, and so we would not have had two lines. we would have had a stupid little streetcar through downtown and a line of buses with most of the city in tow.
There is no reason we couldn't have done both as the first project was due for completion in 2009-10 and construction of Confederation Line didn't begin until 2013. What we are now spending on Line 2 would have paid for the original version of Line 2 including double tracking. As has been mentioned on the news in the last day, we are now paying 30% extra because of labour shortages in the construction trades. This is a cost of building Line 1 and Line 2 extensions at the same time.

Nevertheless, this point was brought up because of availability issues on the Confederation Line, and we are now on the fourth straight day with train service interruptions.
     
     
  #13168  
Old Posted Nov 11, 2019, 6:58 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Since the city's early proposals indicate Fallowfield station should be elevated and since the LRT will be elevated over the VIA tracks as part of the grade separation project, I can see them trying to sell the entire project (LRT and grade separation) as all or nothing since there's no cost-effective way to build an elevated BRT station at Fallowfield as a stand-in until the LRT is built while also elevating the BRT over the VIA tracks (since they would ideally like to reuse structures..) And with the importance of the grade separation project, that might give the city some leverage to get the entire funding package.

Who knows about Kanata though.
     
     
  #13169  
Old Posted Nov 11, 2019, 7:09 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by lrt's friend View Post
I have commented about lack of redundancy on the Ottawa board for quite some time. We could have had a second line through downtown but killed it in 2006.

How do Montrealers deal with subway closures? It has been chaotic in Ottawa because most people can't get to their destinations on-time when their is a shutdown. Instead of beefing up parallel services, they cut almost all of them making it very difficult to enter or exit downtown Ottawa without using the Confederation Line.
People usually head to the other open line. If two lines are problematic like in the recent weeks, there's a special bus service set up like in Ottawa. Also the mentality is that if you're late because of transit, it's not a big deal. I remember when I worked at the federal government in Ottawa, I was expected to be exactly on time at the same hour everyday, this just don't happen in Montréal. The STM will hand out tardy slips if requested.
     
     
  #13170  
Old Posted Nov 12, 2019, 10:17 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,083
City launches new Valley Line West LRT procurement



November 12, 2019

The City of Edmonton is launching a new procurement process for the Valley Line West LRT project.

The 14-kilometre extension from Downtown to Lewis Farms will be delivered using a design-build-finance (DBF) model. This type of contract requires the successful bidder to undertake the design and construction of the Valley Line West project and provide partial private financing. Once fully complete, the full 27-kilometre Valley Line will provide a reliable continuous light rail transit service connecting major destinations between southeast, downtown and west Edmonton.

The City chose the new procurement strategy after engaging with construction industry stakeholders to better understand changes in the market’s capacity to build the Valley Line West LRT. The City will procure light rail vehicles separately and is currently exploring options related to that approach.

“Our goal has always been to deliver the Valley Line West LRT project in a manner that provides Edmontonians with the best value for their money and we’re confident our new procurement strategy will achieve that,” said Bruce Ferguson, Branch Manager for LRT Expansion and Renewal.

Through competitive procurement, the City ensures fair and rigorous competition among experienced participants in the design and construction industry. The City expects to launch the new procurement process with a Request for Qualifications (RFQ) early in the new year. The successful proponent will be selected by the end of 2020 and the project is expected to be completed by 2027.

The new procurement strategy comes after two of the three shortlisted teams withdrew from the previous procurement process in July. The City temporarily paused procurement to fully understand the changing market conditions and evaluate its options before relaunching with a new approach.

The Valley Line West procurement strategy report will be presented to Executive Committee for information on November 18.


For more information:
edmonton.ca/valleylinewest

Media contact:
Mariam Ibrahim
Communications Advisor
Communications and Engagement
780-496-5088
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #13171  
Old Posted Nov 13, 2019, 5:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Meanwhile in Ottawa, drinking fountains don't do well in winter.

https://twitter.com/CBCOttawa/status/1194649145845440513

Hurdman Station's outdoor drinking fountains.
     
     
  #13172  
Old Posted Nov 13, 2019, 7:05 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,959
How can Edmonton proceed with it's LRT West extension with the provincial cutbacks which have effectively cancelled Calgary's Green Line?
     
     
  #13173  
Old Posted Nov 13, 2019, 7:47 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,083
Funding was postponed/delayed, hence the way forward with something akin to bridge financing.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #13174  
Old Posted Nov 14, 2019, 5:04 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
https://www.bramptonguardian.com/news-st...-for-brampton-hlrt-extension-on-horizon/

Hmm, why does this sound politically charged to me?

For context, the current mayor of Brampton used to be ONPC’s leader until an alleged sex scandal ousted him in early 2018. Many believed it was an insider job.

I suspect personal vendetta because I’ve always thought it’s been agreed upon that Hurontario LRT will go to Downtown Brampton to connect to the Kitchener Go Line. I can be wrong though.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #13175  
Old Posted Nov 14, 2019, 2:49 PM
savevp's Avatar
savevp savevp is offline
Registered User
 
Join Date: May 2013
Posts: 1,323
Quote:
Originally Posted by Dengler Avenue View Post

Hmm, why does this sound politically charged to me?
job.
Although it would be completely unsurprising if this were merely vengeance, I reckon it's simply the fallout from Brampton rejecting the funding when it was available. Regardless of who the mayor is, the funding was reallocated once the last council decided not to take it.
     
     
  #13176  
Old Posted Nov 14, 2019, 3:10 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Maybe I am not looking hard enough, but it is so strange that we hear nothing about the Patrick Brown sex scandal anymore. Politics can be such a dirty blood sport. No wonder, I cannot stomach voting for the PC party.

Last edited by lrt's friend; Nov 15, 2019 at 4:45 AM.
     
     
  #13177  
Old Posted Nov 14, 2019, 3:37 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Wrong thread. Still have to LOL at it.
     
     
  #13178  
Old Posted Nov 14, 2019, 8:26 PM
White Pine White Pine is offline
Registered User
 
Join Date: Jan 2010
Posts: 398
If I were a government inclined to reduce spending, Brampton LRT would be the easiest thing to cut. I could just say "The money was there and you decided you didn't want it, so tough", and just like that, maybe a billion dollars off the deficit lol.
     
     
  #13179  
Old Posted Nov 16, 2019, 12:26 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
http://www.metrolinx.com/en/docs/pdf/board_agenda/20191122/20191122_BoardMtg_Kitchener_IBC.pdf

Initial business case for Kitchener Go Line (Ontario) has been published.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #13180  
Old Posted Nov 18, 2019, 1:57 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:37 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 12:33 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.