Their eventually going to have those cross bar supports on all four corners that they currently have on the NW corner, right?
No. Those are most likely there to support the small section of the secant wall along Chicago Ave that is shoring up the north side of the pit for the elevator core. Keep in mind it's top-down so once they pour the top slab they can start removing material from under it as the slabs support the wall as they go down