HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #3681  
Old Posted Nov 1, 2019, 8:11 PM
misher's Avatar
misher misher is offline
BANNED
 
Join Date: Jul 2018
Posts: 4,537
Video Link

Just so catchy.
Reply With Quote
     
     
  #3682  
Old Posted Nov 1, 2019, 8:21 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,596
Quote:
Originally Posted by cganuelas1995 View Post
Don't the LIMs provide all the propulsion and braking, so there is basically no need for the wheels aside from keeping the train on the tracks and thus no problems in the snow?
In theory, yes. But I think Skytrain's problems in snow are due to the intrusion detection going off all the time. That problem is due to being driverless though, I would guess.
Reply With Quote
     
     
  #3683  
Old Posted Nov 1, 2019, 8:33 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by cganuelas1995 View Post
Don't the LIMs provide all the propulsion and braking, so there is basically no need for the wheels aside from keeping the train on the tracks and thus no problems in the snow?
The Canada Line is all traction motor powered.
__________________
"It's ok, I'm an engineer!" -Famous last words
Reply With Quote
     
     
  #3684  
Old Posted Nov 1, 2019, 9:44 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,578
Yeah, the Canada Line is not linear induction.

Quote:
Originally Posted by WarrenC12 View Post
In theory, yes. But I think Skytrain's problems in snow are due to the intrusion detection going off all the time. That problem is due to being driverless though, I would guess.
For the linear induction trains, they also run trains all night when it's snowing to keep the induction strip clear of snow.
There a tight tolerance between the induction strip and the induction motor - something like 1 cm or less (maybe 0.75 cm), so that can get clogged with snow or ice if they aren't diligent.
Reply With Quote
     
     
  #3685  
Old Posted Nov 1, 2019, 9:46 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,596
Quote:
Originally Posted by officedweller View Post
They also run trains all night when it's snowing to keep the induction strip clear of snow.
There a tight tolerance between the induction strip and the induction motor - something like 1 cm or less (maybe 0.75 cm), so that can get clogged with snow or ice if they aren't diligent.
If that's the reason it seems like they could retrofit the trains to have mini "snow plows" to deal with that, no?

Regardless, it's hardly a problem in our climate. A few days every few years maybe. Perhaps less in the global warming future.
Reply With Quote
     
     
  #3686  
Old Posted Nov 1, 2019, 10:50 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,578
Quote:
Originally Posted by WarrenC12 View Post
If that's the reason it seems like they could retrofit the trains to have mini "snow plows" to deal with that, no?

Regardless, it's hardly a problem in our climate. A few days every few years maybe. Perhaps less in the global warming future.
The frequent trains are enough to blow snow off the induction strips.
You can't have anything "scraping" the induction strip, as it could tear one of them up if a screw is loose.

Snow plan is laid out here:
https://buzzer.translink.ca/2009/01/skytrains-snow-plan/
Reply With Quote
     
     
  #3687  
Old Posted Nov 1, 2019, 11:02 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
Quote:
Originally Posted by WarrenC12 View Post
In theory, yes. But I think Skytrain's problems in snow are due to the intrusion detection going off all the time. That problem is due to being driverless though, I would guess.
It's also a good reason for making all the stations have a decent roof over the track. If the snow can't set off the track intrusion system, then there would be much less of an issue.

The other part of the snow/ice problem is trees falling on the track, just like with the wind storm last week. Ice buildup tends to bring lots of trees down.
__________________
"It's ok, I'm an engineer!" -Famous last words
Reply With Quote
     
     
  #3688  
Old Posted Nov 2, 2019, 3:11 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,578
Metro Vancouver board greenlights eight-lane Massey Tunnel replacement
https://globalnews.ca/news/6113800/metro...ts-eight-lane-massey-tunnel-replacement/
Reply With Quote
     
     
  #3689  
Old Posted Nov 2, 2019, 3:47 AM
trofirhen trofirhen is online now
Registered User
 
Join Date: Oct 2008
Posts: 9,045
An eight lane immersed tuble tunnel with a dedicated bus lane. It could be worse. It's a bit of a suprise to me, as I thought a bridge had been more or less decided upon; a tunnel ruled out.
Reply With Quote
     
     
  #3690  
Old Posted Nov 2, 2019, 4:05 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,308
Wtf is a metro Vancouver board of directors? Why is this even news. A bunch of people with no actual power endorsed an 8 lane tunnel. Woohoo
Reply With Quote
     
     
  #3691  
Old Posted Nov 2, 2019, 4:16 AM
trofirhen trofirhen is online now
Registered User
 
Join Date: Oct 2008
Posts: 9,045
Quote:
Originally Posted by libtard View Post
Wtf is a metro Vancouver board of directors? Why is this even news. A bunch of people with no actual power endorsed an 8 lane tunnel. Woohoo
You're totally right IMO, but I think this endorsement will creat sort of a "bottom line" or point of reference, and officially rule out a bridge option. IMO should also unclude a RRT tube but WTF.
Reply With Quote
     
     
  #3692  
Old Posted Nov 2, 2019, 4:48 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,596
Quote:
Originally Posted by libtard View Post
Wtf is a metro Vancouver board of directors? Why is this even news. A bunch of people with no actual power endorsed an 8 lane tunnel. Woohoo
Spoken like somebody who has no idea how politics works.
Reply With Quote
     
     
  #3693  
Old Posted Nov 2, 2019, 3:57 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
I really hope that this project is more than just the tunnel.

The highway and interchanges need a rebuild, especially if we want to have a true rapid bus / transit system.

While I still prefer the bridge over the tunnel and feel much of this has been a stunt, if the NDP can follow through with the above they may have actually swayed my vote (also largely because up to now they have done nearly no virtue signaling identity politics crap)
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #3694  
Old Posted Nov 7, 2019, 1:21 PM
connect2source's Avatar
connect2source connect2source is offline
life in the present
 
Join Date: Mar 2011
Location: Halifax
Posts: 1,873
Nice summary and I'm in full agreement. Perhaps a glimmer of hope that the bridge option will be revisited.

https://dailyhive.com/vancouver/george-massey-tunnel-replacement-opinion
__________________
source | energy
Reply With Quote
     
     
  #3695  
Old Posted Nov 7, 2019, 2:05 PM
Cypherus's Avatar
Cypherus Cypherus is offline
Registered User
 
Join Date: Jan 2007
Location: Surrey
Posts: 1,759
Quote:
Originally Posted by connect2source View Post
Nice summary and I'm in full agreement. Perhaps a glimmer of hope that the bridge option will be revisited.

https://dailyhive.com/vancouver/george-massey-tunnel-replacement-opinion
Although a great opinion piece, the bridge option is over. Millions already wasted with preloading and site preparation, then study after study thereafter. What we are left with is an 8 lane submerged tunnel that will not be finished until at least 2026 given the difficult construction window and environmental encroachment into surrounding areas.
Reply With Quote
     
     
  #3696  
Old Posted Nov 7, 2019, 3:15 PM
cairnstone cairnstone is offline
Registered User
 
Join Date: Jan 2010
Posts: 1,026
Quote:
Originally Posted by Cypherus View Post
Although a great opinion piece, the bridge option is over. Millions already wasted with preloading and site preparation, then study after study thereafter. What we are left with is an 8 lane submerged tunnel that will not be finished until at least 2026 given the difficult construction window and environmental encroachment into surrounding areas.
Preloading is not a waste and will be considered money in the bank for future road improvements. Its not like the sand will go bad. Event he test pile that was installed has value as it gives geotech engineers much data on the ground conditions for future works.
Reply With Quote
     
     
  #3697  
Old Posted Nov 7, 2019, 6:55 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,131
Quote:
Originally Posted by connect2source View Post
Nice summary and I'm in full agreement. Perhaps a glimmer of hope that the bridge option will be revisited.

https://dailyhive.com/vancouver/george-massey-tunnel-replacement-opinion
Lol, that was an opinion piece written by one of our very own!

Unfortunately, the bridge is dead unless the Libs win the next provincial election.
Reply With Quote
     
     
  #3698  
Old Posted Nov 7, 2019, 8:56 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,918
What people who support the 10 lane bridge happen to forget, much to the benefit of the Liberals, is that the bridge was to be tolled. Of course the Liberals never mentioned how much but in today's dollars it would probably come out at around $5 each way. That's a lot of money out of people's pockets. The twinning of the tunnels however, as I understand it, will be toll free.

I thiunk the ideal setup would be 2 lanes in each way connecting Vancouver and Seattle traffic and the other 2 lanes each way be for strictly traffic from Steveston to the SFPR.
Reply With Quote
     
     
  #3699  
Old Posted Nov 7, 2019, 8:58 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,131
Either way it costs money...

Whether tolls or taxes pay for the bridge it's money out of the pockets of British Columbians.

The tunnel isn't just going to build itself out of unicorn farts.
Reply With Quote
     
     
  #3700  
Old Posted Nov 7, 2019, 11:41 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,578
The other thing that people forget, however, is that the tolls on Port Mann (and Massey Bridge) are part of an overall scheme
of Traffic Demand Management to extend the period of free flow traffic for the structure before it reaches capacity.
You can already see the increase in usage at Port Mann with the removal of the tolls.
That means it will become congested/overburdened well before it was planned to be.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.