HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #2681  
Old Posted Aug 24, 2019, 7:02 PM
FavMaster98
 
Posts: n/a
Also, here's an update on HSR's 2019 retirements of some of there transit buses. It is as follows:

1.) 0601-0603 (2007 New Flyer DE41LF)
2.) 0611-0614 (2007 New Flyer DE60LFR)
3.) 0701-0702 (2006 New Flyer D40LF)
4.) 0704-0706 (2006 New Flyer D40LF)

And that's it for this update on retirements of their buses.

Last edited by FavMaster98; Nov 4, 2019 at 2:02 AM.
Reply With Quote
     
     
  #2682  
Old Posted Aug 26, 2019, 1:23 PM
thistleclub thistleclub is offline
 
Join Date: Mar 2008
Posts: 3,729
Confirmation in the HSR's Bus News:

10 B Line expands to evenings and Saturdays!

We want to get you to your destination faster. That’s why this fall the B Line is increasing frequency and expanding to include later weekday evening and Saturday service.
  • Weekday service will run from 6 am until 10 pm
  • Saturday service will run from 8 am until 10 pm
And to make the B Line even more convenient for customers, stops have been added in both directions at Wellington, Melrose and the Delta (Main/King) to provide greater accessibility to express service.
Reply With Quote
     
     
  #2683  
Old Posted Aug 26, 2019, 10:37 PM
TheRitsman TheRitsman is offline
 
Join Date: Sep 2017
Posts: 3,055
Quote:
Originally Posted by thistleclub View Post
Confirmation in the HSR's Bus News:

10 B Line expands to evenings and Saturdays!

We want to get you to your destination faster. That’s why this fall the B Line is increasing frequency and expanding to include later weekday evening and Saturday service.
  • Weekday service will run from 6 am until 10 pm
  • Saturday service will run from 8 am until 10 pm
And to make the B Line even more convenient for customers, stops have been added in both directions at Wellington, Melrose and the Delta (Main/King) to provide greater accessibility to express service.
Seems they're trying to match the B-Line to what the future LRT would look like.
Reply With Quote
     
     
  #2684  
Old Posted Aug 26, 2019, 11:01 PM
thistleclub thistleclub is offline
 
Join Date: Mar 2008
Posts: 3,729
Quote:
Originally Posted by TheRitsman View Post
Seems they're trying to match the B-Line to what the future LRT would look like.
Indeed. It would be nice if they ramped up the passenger amenities on the line as well. The 100 meter stretch of King between James and MacNab is home to what are probably the highest boarding numbers in the system (two stops, serving 10/52 and 5C/51 routes) and riders are rewarded with two janky low-capacity shelters from the early '90s. When the weather is garbage, riders end up jammed up in the entrance to 2 and 100 King West. Not a compelling way to grow ridership.

While I'm dreaming, maybe kick in some street trees for good measure.
Reply With Quote
     
     
  #2685  
Old Posted Aug 27, 2019, 5:33 PM
king10 king10 is offline
 
Join Date: Feb 2009
Posts: 2,776
Quote:
Originally Posted by thistleclub View Post
Confirmation in the HSR's Bus News:

10 B Line expands to evenings and Saturdays!

We want to get you to your destination faster. That’s why this fall the B Line is increasing frequency and expanding to include later weekday evening and Saturday service.
  • Weekday service will run from 6 am until 10 pm
  • Saturday service will run from 8 am until 10 pm
And to make the B Line even more convenient for customers, stops have been added in both directions at Wellington, Melrose and the Delta (Main/King) to provide greater accessibility to express service.
This is excellent.
Reply With Quote
     
     
  #2686  
Old Posted Aug 28, 2019, 6:22 PM
FavMaster98
 
Posts: n/a
Also, here's an update regarding the HSR's new buses 1845-1850. They've entered service. So expect to see them on low ridership routes.
Reply With Quote
     
     
  #2687  
Old Posted Sep 1, 2019, 9:23 PM
lachlanholmes's Avatar
lachlanholmes lachlanholmes is offline
 
Join Date: Jun 2017
Posts: 878
Construction Update - Confederation GO | Hamilton Today Transit

Quote:
With about two months to go before the new Confederation GO Station opens to buses, construction progress at the site is well under way.

Starting November 2nd, the GO bus route 12 stop currently located at Barton Street and Nash Road will move into the bus loop on the north side of the Confederation station site, off Goderich Road. Approximately 60 parking spaces will be available and are already completed. The bus loop has also been completed with three bus platforms as well as room for additional buses to stop.

The enclosed waiting area beside the bus platforms has been constructed and a bike parking structure is in progress.

While Metrolinx’s President and CEO Phil Verster stated that by the end of 2019 local bus service would also serve the new GO station, it’s not known what capacity the HSR will service the new GO station.
All photos courtesy of linked article above:













Reply With Quote
     
     
  #2688  
Old Posted Oct 2, 2019, 12:41 PM
SteelTown's Avatar
SteelTown SteelTown is offline
 
Join Date: Mar 2004
Posts: 20,405
Looks like we're getting closer to implementing the A-Line.

Quote:
$8.5M recommended for A-Line Priority Bus Corridor (airport to waterfront along Upper James) in tomorrow's Canada Infrastructure Program grant submission - great news for #HamOnt mountain, #Ward8Hamilton residents & entire city

John-Paul Danko
https://twitter.com/JohnPaulDanko/status/1179240785474142209
Reply With Quote
     
     
  #2689  
Old Posted Nov 4, 2019, 2:01 AM
FavMaster98
 
Posts: n/a
Smile Special announcements on HSR Buses

On some HSR buses, I have heard announcements that say 'For your safety, please use designated pedestrian walkways.'
Reply With Quote
     
     
  #2690  
Old Posted Nov 4, 2019, 3:34 AM
mishap mishap is online now
 
Join Date: Dec 2007
Posts: 322
Quote:
Originally Posted by FavMaster98 View Post
On some HSR buses, I have heard announcements that say 'For your safety, please use designated pedestrian walkways.'
Mainly at terminals, but for some strange reason, also at Fiesta Mall, where there isn't even a curb at the stop.
Reply With Quote
     
     
  #2691  
Old Posted Nov 4, 2019, 7:22 PM
FavMaster98
 
Posts: n/a
All of HSR's New Flyer DE41LF buses are officially retired.
Reply With Quote
     
     
  #2692  
Old Posted Nov 4, 2019, 7:24 PM
FavMaster98
 
Posts: n/a
For Free Wi-Fi on HSR's buses, their currently in the testing stage (testing costs & benefits).

For USB ports, they will be on buses that are 2018 or newer.
Reply With Quote
     
     
  #2693  
Old Posted Nov 4, 2019, 7:26 PM
FavMaster98
 
Posts: n/a
The HSR will keep replacing their Diesel and Hybrid bus fleet with CNG buses up until 2020.

Also, the HSR told me that once there is a sufficient supply of Renewable Natural Gas (RNG), they will convert their CNG buses to RNG. By doing so, they will be able to reduce the tail pipe emissions to levels lower than CNG.
Reply With Quote
     
     
  #2694  
Old Posted Nov 5, 2019, 4:37 PM
FavMaster98
 
Posts: n/a
Smile About HSR's New Bus Destination Sign Messaging System

A little bit ago, HSR replied to 1 of my emails saying that their currently working with a new messaging system for the side destination signs on their active buses. The new messaging system consists of scrolling text. Currently, it's only on some of their buses. But maybe somewhere in the near future, it will be added to the rest of the fleet.
Reply With Quote
     
     
  #2695  
Old Posted Nov 26, 2019, 3:04 PM
thistleclub thistleclub is offline
 
Join Date: Mar 2008
Posts: 3,729
Six years after it was scheduled to have been completed as a Metrolinx-funded "Quick Win" project, a bus shelter has been installed at Main and MacNab.
Reply With Quote
     
     
  #2696  
Old Posted Nov 26, 2019, 5:57 PM
mishap mishap is online now
 
Join Date: Dec 2007
Posts: 322
Quote:
Originally Posted by FavMaster98 View Post
A little bit ago, HSR replied to 1 of my emails saying that their currently working with a new messaging system for the side destination signs on their active buses. The new messaging system consists of scrolling text. Currently, it's only on some of their buses. But maybe somewhere in the near future, it will be added to the rest of the fleet.
Theoretically, it's on every bus with that model of sign, but the scrolling only seems to be used on one route, Upper Ottawa, and only the trips to the Red Hill Business Park.
Reply With Quote
     
     
  #2697  
Old Posted Jan 25, 2020, 12:53 AM
SteelTown's Avatar
SteelTown SteelTown is offline
 
Join Date: Mar 2004
Posts: 20,405
Hamilton looks to beef up HSR bus service on the Mountain, Upper Stoney Creek
But council will have to vote on continuing long-term transit improvement strategy without knowing what the future holds for LRT.

https://www.thespec.com/news-story/98207...vice-on-the-mountain-upper-stoney-creek/

The HSR wants to forge ahead on a 10-year transit strategy that would add more frequent bus service on the Mountain alongside a five-cent fare hike this year.

But council will have to vote on a 9.6-per cent transit budget bump this spring without answers to huge questions looming over the long-term future of Hamilton's bus service:

• What does the cancellation of LRT mean for the city's busiest bus corridor?

•Which taxpayers will pay for a needed expansion of transit into the suburbs?

Transit head Debbie Dalle Vedove gave City Council an update Friday on plans for bus service improvements this year — as well the results of a "(Re)envision" citizen survey meant to guide a future HSR overhaul.

That survey of 5,781 residents emphasized "frequent, reliable service" as the No. 1 improvement to prompt Hamiltonians to "make transit their first choice," said Dalle Vedove.

Dalle Vedove showed councillors a time lapse map that vividly showed much of the Mountain and all of Hamilton's amalgamated suburbs lack the kind of frequent service available along the lower city's main east-west transit corridors. The growing community of Waterdown, meanwhile, is not linked to Hamilton's downtown at all.

But if council approves paying for 'year five' of its decade-long transit strategy, another 13 buses and 46,000 extra hours of service would be added this fall.

Much of those resources would focus on extending hours and improving frequency on the Mountain-climbing A-line, Rymal and Stone Church routes. The $4.3-million cost of the improvements is expected to be offset by a planned five-cent fare hike for adults.

The service frequency map "makes it so clear" what transit improvements are needed in the city, said Mountain Coun. John-Paul Danko.

"But I don't see how we achieve that without rapid transit and without the elimination of area rating of transit as well," he said, pointing to the twin uncertainties facing city leaders.

Right now, different parts of the city pay different rates of tax based on former town borders and level of bus service.

A city subcommittee will start in February studying whether to end "area rated" transit taxes — but many suburban councillors bristle at the idea of forcing their residents to pay more for buses they rarely see.

Ontario's Progressive Conservative government also threw the city's long-term transit plans into disarray in December by abruptly cancelling a light rail transit project for the B-line in December.

A provincial task force is supposed to look at alternative transportation projects — but that process could take months.

Stoney Creek Coun. Brad Clark noted Hamilton had planned to debate a potential route overhaul this summer based on its HSR (Re)envision study in concert with McMaster University. "How does that (uncertainty) influence what we're doing?" he asked.

City manager Janette Smith, who is on the task force, said she will seek "clarity" on timelines when the group meets for the first time next Tuesday.
Reply With Quote
     
     
  #2698  
Old Posted Jan 25, 2020, 12:55 AM
SteelTown's Avatar
SteelTown SteelTown is offline
 
Join Date: Mar 2004
Posts: 20,405
• Video Link


City of Hamilton graphic showing the average number of HSR buses at each stop per hour each weekday.
Reply With Quote
     
     
  #2699  
Old Posted Jan 25, 2020, 1:01 AM
SteelTown's Avatar
SteelTown SteelTown is offline
 
Join Date: Mar 2004
Posts: 20,405
Electric buses for Hamilton? Likely, at some point
City officials say desire is there but cite funding and logistics as barriers

https://www.thespec.com/news-story/9820716-electric-buses-for-hamilton-likely-at-some-point/

There will be space for 100 electric buses to charge in Hamilton's future transit garage.

But just when these zero-tailpipe-emission additions will hit the road is uncertain as the city plots its transit future.

City officials say the technology is still evolving, Hamilton's escarpment presents challenges and so does hydro capacity.

"We're really in the infancy of that right now. We want to take a measured approach," said Coun. John-Paul Danko, a proponent of going electric.

During a budget presentation Friday, transit staff said they're exploring the possibility.

In 2013, the city committed to transitioning from diesel to natural gas. As it stands, 51 per cent of HSR's 267-bus fleet runs on low-emission natural gas.

Last year, the city kicked the tires of two 40-foot Proterra and New Flyer electric models.

The "advertised" overnight vehicle charge results in a range of 145 to 200 kilometres, said Jason VanderHeide, manager of planning and infrastructure.

But the city's Mountain-climbing routes are a big drain on batteries, noted Mark Selkirk, manager of fleet maintenance. "You lose 60 per cent of efficiency on the escarpment."

VanderHeide also noted a major piece of the electric bus puzzle will involve coordination with utility providers to ensure enough power to meet the added demand. "It's fair to say it's an incredibly complex conversation around electric buses."

Cost adds to that complexity. "I'd like to see us transition as quickly as possible," Danko said, "but that requires a funding commitment, and that's going to have to come from upper levels of government."

Electric buses run between $950,000 and $1.2 million depending on the model and battery capacity. That's compared to about $700,000 for natural gas counterparts, Selkirk noted.

Mayor Fred Eisenberger said Friday he wants to look at whether electric bus purchases can be included in the city's 10-year transit plan. "I have to have a conversation with our staff."

Eisenberger has already broached the subject of federal dollars to help the city electrify its fleet with Infrastructure Minister Catherine McKenna.

McKenna "indicated interest" in exploring funds to assist municipalities bridge the monetary gap between electric and conventional buses, he said.

But some Canadian cities are forging ahead with electric fleets. Edmonton, for instance, expects its first electric buses from Proterra in February. The plan is to have 40 electric buses by October with some hitting the road for regular service as early as summer alongside 900 diesel buses.

Ian Borsuk, a member of Environment Hamilton, said a move toward electric buses would be positive. But increasing ridership is also crucial, he added, noting the amount of emissions private vehicles produce.

"To really put it in a nutshell," Borsuk wrote in an email, "if we were to magically convert the entire HSR bus fleet to electric tomorrow — that would be a positive step in the right direction, but we should be focusing much more on ridership, which the HSR made clear is their focus already."

There's no explicit political direction in Hamilton to do so, but the shift to electric is anticipated with space allocated for charging 100 buses at the future transit garage on Wentworth Street North. The city expects $510 million (with municipal, provincial and federal contributions) in infrastructure funds to pay for the building and other transit projects in coming years.

Selkirk remembers when the city pulled overhead wires down on HSR trolleys in the 1990s. At that time, cost was the factor, he said. "It is a full circle," Selkirk added. "The battery-electric bus is a trolley bus with its energy stored on board."
Reply With Quote
     
     
  #2700  
Old Posted Jan 25, 2020, 5:24 AM
ZTrade ZTrade is offline
 
Join Date: Oct 2018
Posts: 166
Bus service to Winona should be sped up as well. With the new Winona Crossroads Shopping Center and plethora of jobs in the Stoney Creek business park, bus service would be utilized immediately. That's a major employment area in the city, disappointing that the only way to get there is by car or time consuming trans-cab service.

Someone that finishes work at 5 has to wait 10-20 minutes for a trans-cab to pick them up. So they can't guarantee to make it to the bus stops in time, if they miss a 530 bus they're waiting until 6/630.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:31 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.